Professional Documents
Culture Documents
DDOT Surface Water MGMT Bloomingdale Community Update #3 Dated 2013 06 17
DDOT Surface Water MGMT Bloomingdale Community Update #3 Dated 2013 06 17
Scope
of
Project
Installations
of
storm
drains
on
the
unit
block
of
T
St.
NW
COMPLETED!
Installation
of
18-inch
sewer
line
on
the
south
side
of
Rhode
Island
Ave.
NW
at
2nd
St.
NW
with
storm
drains
-
COMPLETED!
Installation
of
60-inch
storm
sewer
in
the
median
of
the
100
block
of
Rhode
Island
Ave.
NW
Installation
of
catch
basins
(storm
drains)
on
the
North
side
of
the
100
block
of
Rhode
Island
Ave.
NW
Installation
of
Bioretention
Cell
(Rain
Garden)
with
underground
storage
in
the
100
block
of
Rhode
Island
Ave.
NW/
and
T
St.
NW
Installation
of
permeable
pavement
with
underground
storage
in
1st
St.
Alley
Progress
to
Date:
Completed
installation
of
storm
drains
on
the
unit
block
of
T
St.
NW
Completed
installation
of
18-inch
sewer
line
on
the
south
side
of
Rhode
Island
Ave.
NW
at
2nd
St.
NW
with
storm
drains
Installed
over
~
94ft
of
60-inch
storm
sewer
in
the
100
block
of
RI
Ave.
NW
Installed
several
manholes
in
the
project
corridor
to
allow
ease
of
access
for
maintenance
entrance
Work
in
Progress:
Two Week Look Ahead: The priority is to continue installation of the 60-inch storm sewer and essential manholes in the 100 block of Rhode Island Ave. NW before moving to other phases of the project. Community Concerns: Updates to schedule DDOT remains on track to complete substantial construction prior to September as announced at the Mayoral press conference (weather and construction conditions permitting). Maintenance of Triangle Garden- Residents concerned about maintenance of Triangle garden until installation of bioretention cell. DPW responded and mowed the garden. Construction Traffic Resident voiced concern about the traffic plan for the project. While there are multiple projects happening in the area, DDOT did remind contractors for the RI Ave. NW project that they should only be using the main street to access and leave the site not interior neighborhood streets. Public Outreach Coordinator: Chancee` Lundy 202.630.9353 clundy@nspiregreen.com
Continuing installation of 60 inch (5 feet) storm sewer in the median of the 100 block of Rhode Island Ave. NW
Washington, DC 20003