August 2011 JSF Brief
August 2011 JSF Brief
Air Force Systems Engineering Conference 17 August 2011 C. Douglas Ebersole Director of Engineering, F-35 Lightning II Program
FOR OFFICIAL USEDISTRIBUTION USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS is unlimited. ONLY // REL TO STATEMENT A. Approved for public release; distribution DOD, DNK MOD, and NOR MOD
Problem Statement
Identify systems engineering challenges to the execution of the F-35 program. Identify means to mitigate negative impacts through effective systems engineering policy, practices and people.
Outline
Overview of F-35 Program Systems Engineering Challenges/Mitigations Workforce Management and Support Final Thoughts
F-35 Characteristics
Key Attributes: Stealth Integrated Avionics A/G Munitions Intraflight DL Adv A/C Survivability General Features: Single seat Speed: 700 kts or 1.6M (630/1.6M STOVL) Ceiling: 50,000 ft+ Engine: PW F135 Sensors Fully integrated open architecture system A/G A/A radar/SAR Electro Optical A/G Targeting system A/A IRST Electronic Support Measures (ESM) Short range EO spherical coverage
CTOL
(AF)
Length: 51.4 ft Wing Area: 460 ft2 Weight (Empty): 29,400 lb Internal Fuel: 18,200 lb Range: 600 + nm
STOVL
(BF) Length: 51.1 ft Wing Area: 460 ft2 Weight (Empty): 32,600 lb Internal Fuel: 13,500 lb Range: 450 + nm
CV
(CF) Length: 51.4 ft Wing Area: 668 ft2 Weight (Empty): 34,900 lb Internal Fuel: 19,700 lb Range: 600 + nm
JSF CDP
JSF SDD
FMS
F-35 PRECURSOR PROGRAMS: Advanced Short Takeoff Vertical Landing Multi-Role Fighter Advanced Tactical Aircraft Naval Advanced Tactical Fighter Advanced Attack Joint Advanced Strike Technology / Concept Demonstration Phase
LRIP
Systems Engineering V
Pre-Milestone C
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation Linkage
Trades
Combined DT&E/OT&E/LFT&E Demonstrate System to Specified User Needs and Environmental Constraints
Develop System Functional Specs & Verification Plan to Evolve System Functional Baseline
Verification Linkage
Verification Linkage
Evolve CI Functional Specs into Product (Build to) Documentation & Verification Plan
Verification Linkage
Trades
System DT&E, OT&E, LFT&E & OAs Verify System Functionality & Constraints Compliance to Specs
Systems Engineering V
Pre-Milestone C
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation Linkage
Trades
Combined DT&E/OT&E/LFT&E Demonstrate System to Specified User Needs and Environmental Constraints System DT&E, OT&E, LFT&E & OAs Verify System Functionality & Constraints Compliance to Specs
Develop System Functional Specs & Verification Plan to Evolve System Functional Baseline
Verification Linkage
Challenge:
Verification Linkage
Evolve CI Functional Specs into Product (Build to) Documentation & Verification Plan
Maintaining common air system level requirements Individual CIbroad stakeholder base. across Verification
Mitigation:
Linkage
JSF Executive Steering Board control of Fabricate, Assemble, system level requirements.
Trades
Verification DT&E
Systems Engineering V
Pre-Milestone C
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation Linkage
Trades
Combined DT&E/OT&E/LFT&E Demonstrate System to Specified User Needs and Environmental Constraints
Develop System Functional Specs & Verification Plan to Evolve System Functional Baseline
Challenge: Linkage
Verification
Verification Linkage
Evolve CI Functional Specs into Product (Build to) Documentation & Verification Plan
Individual CI Performance Based Acquisition broad Verification Verification Linkage DT&E definition of system level requirements.
Mitigation:
Fabricate, Assemble, Code Update Constraints, & Cost/Risk Drivers
Definition of required functional attributes necessary via mission de-comp, use cases, active user engagement, other.
Trades
System DT&E, OT&E, LFT&E & OAs Verify System Functionality & Constraints Compliance to Specs
Systems Engineering V
Pre-Milestone C Challenge:
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation
Combined DT&E/OT&E/LFT&E Government oversight of requirements of Demonstrate System to Linkage allocated baseline. Specified User Needs and
Trades
Mitigation:
Verification
Trades
Environmental Constraints
Develop System Functional Specs & Verification Plan to Evolve System Functional Baseline
Manage to risk. Taking active steps to System DT&E, OT&E, LFT&E & for identified System recover control OAs VerifyConstraintsrisk areas. Functionality & Linkage Compliance to Specs Example: Helmet Mounted Display System
3.2.1.1.1.3.7. The JSF Air System shall provide and night vision target techniques, including visibility Integrated DT&E, LFT&E & Verification through aircraft structures to execute missions
Linkage
Evolve CI Functional Specs into Product (Build to) Documentation & Verification Plan
Verification Linkage
HTS
DMC-H
Required specificity: Fabricate, Assemble, Code Visual acuity as function of Update Constraints, & End to end Cost/Risk Drivers system latency
light conditions
Systems Engineering V
Pre-Milestone C Challenge:
Active management of program risk at lowest configuration item level. Combined DT&E/OT&E/LFT&E
Mitigation:
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation Linkage
Trades
System DT&E, OT&E, LFT&E & OAs Verify System Functionality & Constraints Compliance to Specs
Verification Linkage
Evolve CI Functional Specs into Product (Build to) Documentation & Verification Plan
Verification Linkage
Fabricate, Assemble, Fabricate, Assemble, Code Code Update Constraints, & Update Constraints, & Cost/Risk Drivers Cost/Risk Drivers
10
Systems Engineering V
Pre-Milestone C
Challenge:
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation Linkage
Trades
Combined DT&E/OT&E/LFT&E Demonstrate System to Specified User Needs and Environmental Constraints
Develop System multiple Concurrent development of Functional air Specs & Verification Plan to system software builds. Drives close Evolve System Functional Baseline coordination across major system components (flight sciences, mission systems, ALIS, PHM, training systems). Evolve Functional Performance Specs into Stresses program resources. Baseline System Allocated
Verification Linkage
Verification Linkage
Mitigation:
Evolve CI Functional Broad investment in component and system Specs into Product Verification level test and laboratory infrastructure. Tools (Build to) Documentation Linkage & Verification Plan to have program level sight picture of all components. Disciplined burndown of SDD Fabricate, Assemble, success criteria. Code Update Constraints, & Example: F-35 Software Build Status Cost/Risk Drivers Success Criteria Burndown Individual CI Verification DT&E
Trades
System DT&E, OT&E, LFT&E System DT&E, OT&E, LFT&E & OAs Verify System & OAs Verify System Functionality & Constraints Functionality & Constraints Compliance to Specs Compliance to Specs
11
Block 3 Final
(Full SDD war-fighting capability, SW Retrofit)
SIT
REQ DEV
DEL
Block 2B
(SW Retrofit) DEL
Block 3 Initial
(Tech Refresh 2) DEL
SIT
REQ DEV
Block 2A
(Multi-Level Security, Full Block 1 Avionics) SIT DEL SIT REQ DEV REQ DEV DEV
MS Integration: 5% Act vs. 26% Plan AIHM Dev: 39% vs. 47% Plan ALIS Dev: 88% vs. 100% Plan
SIT
REQ DEV
SIT
DEL REQ
Block 1A
(Eglin Ready for Training)
Supplier Dev: 89% Act vs. 92% Plan Prime Dev: 15% Act vs. 36% Plan
On-board SW
DEL SIT
SC REQ DEV
MS Integration: 83% Act vs. 95% Plan GLOC CTE projecting Aug Start vs May Plan
Off-board SW
SC REQ SIT DEV
Software Phase
REQ DEV SIT DEL SC Requirements Development Code &Unit Test System Integration & Test/ Rework Delivery (DD250/Production Readiness) Security Cert/Govt. Acceptance
As of 26 July 2011
12
13
Systems Engineering V
Pre-Milestone C
Challenge:
Interpret User Needs, Refine System Performance Specs & Environmental Constraints
Validation Linkage
Trades
Combined DT&E/OT&E/LFT&E Demonstrate System to Specified User Needs and Environmental Constraints
Mitigation:
Verification Linkage
Clear definition of incremental system level performance to be delivered with each LRIP lot Evolve Functional Verification to execute user mission needs.into Performance Specs
System Allocated Baseline
Linkage
Trades
LRIP production aircraft delivery concurrent to continued SDD Develop System Functional execution.
System DT&E, OT&E, LFT&E & OAs Verify System Functionality & Constraints Compliance to Specs
14
Fleet Release
1A
Mission Capabilities Altitude Airspeed Mach AOA G Ready for Training
1B
Initial Training
2A
Enhanced Training
2B / 3I
Initial Warfighting
3C (3F)
Full Warfighting / Export
Weapons
Basic Basic Mission SystemsBasic CAS/Interdiction, Multi-Level Security Multi-ship Fusion, Nav/Comm/Sensors Initial MADL, Link 16 Initial A/A ORD Compliant 40k 40k 40k 40K 50k 450 / 400 / -550 / 450 / -550 / 450 / 450 700 / 550 / 550 700 / 630 / 700 0.9 / .8 / -0.9 / 0.9 / -0.9 / 0.9 / 0.9 1.6 / 1.2 / 1.2 1.6 18 18 18 50 50 5.0 / 4.5 / -5.5 / 4.5 / -5.5 / 4.5 / 4.5 7 / 5.5 / 7.5 9 / 7 / 7.5 2 AIM-120-C5/7 (A/B/C) 2 JDAM (GBU-31) (A/C) 2 JDAM GBU-32 (B) Full SDD Weapons No Weapons No Weapons No Weapons 2 GBU-12 Internal (A/B)
* Carriage/Employment Envelope Limited
NOTE: Block 2B and 3C Fleet Release timing under development (SDD Replan)
15
16
Closing Thoughts
VADM Venlets commitment to program execution coming out of the N-M re-certification.
Realism in planning Transparency in all we do Program grounded in disciplined systems engineering
Its not hard its not free but it requires discipline and commitment For mostsimply follow your SEP
Systems Engineering Technical Reviews critical
Enables gated approach to program execution