Accelerating Progress in Magnetic Fusion Energy
Accelerating Progress in Magnetic Fusion Energy
Accelerating Progress in Magnetic Fusion Energy
Presented by Martin Greenwald ASP Workshop on MFE Steps to Commercialization June 5, 2012 Washington DC
Year 30-35
Year 35-40
Year 40-45
Year 45-50
Construc.on
DT Opera.on
Design
Construct
Opera.on
Design
Construct
Opera.on
Design
Constr uct
Operate
Because
of
the
slower
ramp-up
and
construc.on
for
ITER
and
a
longer
than
assumed
pre-DT
phase,
Demo
opera.on
is
delayed
about
10
years
from
the
35- year
plan
(which
actually
had
it
begin
opera.on
in
thirty
years
~2036).
2
a) Need to demonstrate predictable, integrated (core, edge, pwi), steady state, high- performance plasmas b) Avoid disrup.ons and large ELMs c) Ecient and reliable steady-state hea.ng, fueling and current drive d) Sensors, actuators and control methods consistent with Demo requirements
a) Operate
all
exis.ng
U.S.
facili.es
at
>full
u.liza.on
(double
shi`)
b) Exploit
interna.onal
facili.es
to
the
greatest
extent
technically
and
poli.cally
feasible
c) Signicantly
accelerate
ITER
through
much
greater
U.S.
contribu.ons
where
technically
and
poli.cally
feasible
d) Greatly
accelerate
technology
and
science
program
for
hea.ng,
fueling
and
current
drive
systems
e) Ac.vely
deploy
Demo
compa.ble
sensors
on
exis.ng
machines
to
test/ demonstrate
their
capabili.es
f) Design
and
construc.on
of
new
performance
extension
devices
g) Design
and
construc.on
of
new
burning
plasma
devices
h) Greatly
strengthen
theory
and
modeling
eort
4
11
12
13
End
14