Teknik After Laying Abduh 2004
Teknik After Laying Abduh 2004
Syamsir Abduh
Dosen Jurusan Teknik Elektro, Fakultas Teknologi Industri
Universitas Trisakti
Abstract
Power systems equipment must withstand not only the rated voltage which corresponds to the
highest voltage of a particular system but also overvoltages. Accordingly, it is necessary to test
high voltage equipment during its development stage and prior to commissioning. The magnitude
and type of test voltage varies with the rated voltage of particular apparatus. The standard
methods of measurement of high voltage and the basic techniques for application to all type of
apparatus for alternating voltage, direct voltage, partial discharge (well known as after laying
test) are aid down in the relevant application such as XLPE underground cable.