IMS FORMAT NO.: AKRIMOTA THERMAL POWER STATION UNIT NO.

:
Sr. Actual Protection no.

BOILER PROTECTION CHECK LIST- C&I DEPT.


PTW NO.: Date :

Signals Cause For Protections

Protection test necessary simulations

Protection test simulation done

Remarks

1 2

ID Fan A Release and ID Fan B Release SA Fan A Release and SA Fan B Release

Secondary air way release

Primary air way release

Furne.Pr. < -25mbar >20FurnPr<-25 mbar ID Current > min Speed > 250 rpm fire exist with 15 min. delay or any one PA not ON Any one ID fan on Furne.Pr. < -25mbar Emergency PB operated SA A+B RLS not EXIST Both SA fan off AIR FLUE GAS PATH not OPEN P S. A.BEH TAPH > 15 Mbar Any two FA FAN off 90sec delay P fluid air syph seal < 250 mbr 30 sec delay Fluidizing air not on Drum Level < 250 mm SA air way RLS not EXIST Heating surface cooling not ON

Force it to < -25 mbar Force it to > 20 and < -25mbar

trip both PA Trip both ID Force it to < -25mbar Operate EPB FORCE TO ZERO FORCE TO OFF CLOSE ANY DAMPER FORCE THE VALUE <16mbar Stop two FA FANS FORCE < 250 mbar Force above sl no 4 to zero Force drum level < 250 Force above sl no 3 to zero Force below sl no 13 to zero

5 6 7

General interlocking exist Ignition release exist Coal feeder A Release and Coal feeder B Release

P PA bef pri air box < 40 mbar Both PA fan off FAIL START 3 ON F PA TO PA BOX < 15.5 Kg/s PA PRE < 40MBAR 5 SEC GENERAL INTRLOCK EXIST IGNITION RLS EXIST T Fluid BED Ovr nzl grd > 600c T Fluid BED Ovr nzl grd > 610c ATM/SCV STM PRESS 8BAR > MIN INST AIR PRESS > MIN 5 BAR PRIMARY AIR FAN RLS EXIST IGNITION RLS EXIST ATM/SCV STM PRESS > MIN INST AIR PRESS > MIN IGNITION RLS EXIST 10 SEC ATM/SCV STM PRESS > MIN INST AIR PRESS > MIN SA AIR W RLS EXIST PRIM AIR FLOW > MIN MS STM FLOW < MIN BED TEMP < 590 DEG C RH TEMP > 560 Deg C

Force the same < 40 mbar Trip both breakers off Force it to on Force to < 15.5 kg/s Force to < 40 mbar Force it to zero Force it to zero Force < 600 Force it to > 650 Force to zero 3s delay Force to zero 3s delay Force to zero Force to zero Force to zero 3s delay Force to zero 3s delay Force to zero 3s delay Force to zero Force to zero Force to zero Force it to > 7.5 KG/S Force it to < 10%

Start up burner release

Oil scavenging release

10

Oil cleaning release

11

Heating surface cooling

Protections checked by: