PERMEABILITY TEST

VARIABLE HEAD TEST


PROYEK

: Landfill, PLTU Asam Asam

TANGGAL

: 30 Oktober 2011

LOKASI

: Desa Jorong, Kec. Asam Asam

DI TES OLEH

: Gatot Rudiyanto & Budianto

NOMER TEST : DH-01 / P7

DIHITUNG

: Tigor MHL Tobing

KEDALAMAN

M. A. T

: - 620 cm

: 18.00 - 20.00 m

D1
Casing

H1

H2

Lubang bor
L
2R

No

D1

M.A.T

t1

h1

t2

h2

H1

H2

(cm)

(cm)

(cm)

(cm)

(det)

(cm)

(det)

(cm)

(cm)

(cm)

15.00

620.00

200.00

4.45

0.00

60

10.00

2015.00

2005.00

15.00

620.00

200.00

4.45

60

10.00

120

9.00

2005.00

1996.00

15.00

620.00

200.00

4.45

120

9.00

180

9.00

1996.00

1987.00

15.00

620.00

200.00

4.45

180

9.00

240

9.00

1987.00

1978.00

15.00

620.00

200.00

4.45

240

9.00

300

9.00

1978.00

1969.00

15.00

620.00

200.00

4.45

300

9.00

600

43.00

1969.00

1926.00

15.00

620.00

200.00

4.45

600

43.00

900

43.00

1926.00

1883.00

15.00

620.00

200.00

4.45

900

43.00

1200

43.00

1883.00

1840.00

15.00

620.00

200.00

4.45

1200

43.00

1500

42.00

1840.00

1798.00

10

15.00

620.00

200.00

4.45

1500

42.00

1800

42.00

1798.00

Nilai Permeabilitas (k) =

1756.00
1.440E-05

PLOTING PENGAMATAN
60

120

180

240

300

600

900

1200

1500
1

Rasio penurunan (Ht/Ho)

0.1

Waktu t (detik)