RTU S900 MAINTENANCE AND TROUBLE SHOOTING


ALSTOM PROJECTS INDIA LTD

M&T / 1

AbCd

INDEX
Maintenance Strategy & Planning Maintenance Procedure DOs & DONTs Probable Problems & Troubleshooting Visual Indications Operator Console - Operation Replacement Procedures

ALSTOM PROJECTS INDIA LTD

M&T / 2

MAINTENANCE

AbCd

MAINTENANCE PROCEDURE
PREVENTIVE PERIODIC

BREAKDOWN
ALSTOM PROJECTS INDIA LTD

M&T / 3

MAINTENANCE
PREVENTIVE

AbCd

THE OPERATION OF DUMMY CKT. BREAKER WITH ASSOCIATED FEEDBACK TO RTU AS DIGITAL INPUT STATUS - OPEN & CLOSE ENABLES TO CHECK OVERALL FUNCTIONING OF RTU - SIC COMM. CHANNEL MASTER & OPERATOR CONSOLE RC_SBO & DAU MODULES PRINTER
M&T / 4

ALSTOM PROJECTS INDIA LTD

MAINTENANCE
PLCC
D15 D 25

AbCd
PLCC

MODEM

CFE
S900 RTU
SET & RESET latching relay DB Relay

CONSOLE

PRINTER COM

ALSTOM PROJECTS INDIA LTD

M&T / 5

MAINTENANCE
USING VT100 AS OP. CON. CHECK VARIOUS PARAMETERS.

AbCd

CHECK & ANALYSE IF ANY FAULT LEDs ARE ON IN RTU. CHECK & ANALYSE IF ANY FAULT LEDs ARE ON IN MODEM. CHECK FUNCTIONING OF L/R SWITCH.
ALSTOM PROJECTS INDIA LTD

M&T / 6

MAINTENANCE
PERIODIC

AbCd

THE PROCEDURE SHALL BE ELABORATE & MAY NEED SPECIAL PERMIT FOR RTU DOWNTIME.
CHECKS ON POWER SUPPLIES. SECURE ALL MODULES INTO RACK (RTU OFF). CLEANING OF AIR FILTERS , USE VACCUM CLEANER.

ALSTOM PROJECTS INDIA LTD

M&T / 7

MAINTENANCE

AbCd

CHECK WORKING OF VARIOUS SYSTEM UNITS.


CHECK , SECURE ALL EARTHING POINTS. CHECK FUNCTIONING OF L/R SWITCH. CHECK SAMPLE ANALOG INPUT.

ALSTOM PROJECTS INDIA LTD

M&T / 8

MAINTENANCE
USING VT100 AS OP. CON. CHECK VARIOUS PARAMETERS.

AbCd

CHECK & ANALYSE IF ANY FAULT LEDs ARE ON IN RTU. CHECK & ANALYSE IF ANY FAULT LEDs ON IN MODEM.

CHECK OVERALL FUNCTIONING OF RTU-SIC.

ALSTOM PROJECTS INDIA LTD

M&T / 9

MAINTENANCE DOs AND DONTs

AbCd

DOs ENSURE THAT ALL MODULES ARE PROPERLY INSERTED & SECURED IN THE RACK . ALL TERMINAL WIRING IS SECURED & NO LOOSE CONNECTION. ENSURE THAT SUITABLE EARTHING IS PROVIDED & SECURED IN THE CUBICLE. ENSURE THAT PROPER POWER SUPPLY VOLTAGES ARE PRESENT AT MCBs. ENSURE CORRECT CONNECTIONS FOR PREFAB & MODEM CABLES.

ALSTOM PROJECTS INDIA LTD

M&T / 10

MAINTENANCE DOs AND DONTs

AbCd

DOs ENSURE CORRECT CONNECTION MADE FOR SAU900 / CPU900 FOR DESIGNATED OPERATIONS. ENSURE BOARD CUSTOMISATION BEFORE REPLACING. ENSURE PROPER CHANGE IN DB WHILE ADDING ANY ENTITIES / MODULES. KEEP OUTSIDE / INSIDE OF CUBICLE NEAT & CLEAN. PROVIDE BETTER ENVIRONMENT FOR THE RTU-SIC FOR LONGER LIFE.
ALSTOM PROJECTS INDIA LTD

M&T / 11

MAINTENANCE
DOs AND DONTs
DONTs

AbCd

TO AVOID DAMAGES DUE TO STATIC CHARGE HANDLE MODULES WITH CARE & AFTER GROUNDING YOURSELF TO REMOVE THE STATIC CHARGE. AVOID WEARING GARMENTS WHICH ARE KNOWN HIGH ABSORBERS OF STATIC ELECTRICITY. AVOID UNNECESSARY INSERTION/REMOVAL OF COUPLER MODULES WITH SYSTEM POWERED ON.
M&T / 12

ALSTOM PROJECTS INDIA LTD

MAINTENANCE DOs AND DONTs


DONTs

AbCd

HANDLE MODULES USING FRONT FACIA HANDLE. DO NOT TOUCH ELECTRONICS WITH BARE HANDS. BEFORE REMOVING MODULES , ENSURE TWO FASTENING SCREWS LOCATED ON FRONT FACIA SECURING MODULE IN RACK ARE UNSCREWED FULLY.

ALSTOM PROJECTS INDIA LTD

M&T / 13

MAINTENANCE DOs AND DONTs


DONTs

AbCd

PL. DO NOT INTERFERE WITH ANY JUMPER SETTING ON COUPLER MODULES.

DO NOT REMOVE THE CPU900 BATTERY BACKUP JUMPER. THIS SHALL DESTROY YOUR SITE DATABASE.

ALSTOM PROJECTS INDIA LTD

M&T / 14

MAINTENANCE
DOs AND DONTs
DONTs

AbCd

DO NOT ATTEMPT TO REPAIR THE RTU MODULES , MODEM , TRANSDUCERS OR RELAYS. THIS CAN CAUSE SERIOUS DAMAGE. DO NOT SUBJECT THE RTU COMPONENTS TO ABNORMAL INPUT CONDITIONS. THIS CAN CAUSE SERIOUS DAMAGE.

ALSTOM PROJECTS INDIA LTD

M&T / 15

MAINTENANCE
DOs AND DONTs
DONTs

AbCd

DO NOT ATTEMPT TO INTERCHANGE THE RTU COMPONENTS BEFORE PROPER ANALYSIS. DO NOT REPLACE ANY RTU COMPONENTS WITH THE INPUT SIGNAL / POWER PRESENT .

ALSTOM PROJECTS INDIA LTD

M&T / 16

MAINTENANCE
DOs AND DONTs
DONTs

AbCd

DO NOT SUBJECT RTU-SIC TO OTHER THAN RECOMMENDED ENVIRONMENTAL CONDITIONS FOR WHICH IT IS SUPPLIED. DO NOT BLOW OUT THE DUST FROM FILTER , USE ONLY VACCUM CLEANER AS THE DUST WILL ACCUMULATE IN THE RTU-SIC CUBICLE.

ALSTOM PROJECTS INDIA LTD

M&T / 17

MAINTENANCE
PROBABLE PROBLEMS

AbCd

LOSS OF COMMUNICATION / LINK COUPLER FAILURE / FAULTY CHANNEL CLOCK SYNC FAILURE FIP FAULT FAULTY FIELD DEVICE FAILURE OF TRANSDUCERS / RELAYS ETC. LOSS OF POWER SUPPLY REMOTE CONTROL NOT FUNCTIONING
M&T / 18

ALSTOM PROJECTS INDIA LTD

MAINTENANCE TROUBLESHOOTING
POWER SUPPLY

AbCd

CHECK FOR PROPER VOLTAGES AT RESPECTIVE MCBs - 48VDC / 230VAC 50Hz NOMINAL CHECK FOR GREEN LED ON ON FRONT OF POWER SUPPLY MODULE WHEN SWITCHED ON IF THE LED IS OFF REPEAT AFTER SECURING THE MODULE IN THE RACK IF LED IS STILL OFF , REPLACE THE MODULE
ALSTOM PROJECTS INDIA LTD

M&T / 19

MAINTENANCE
TROUBLESHOOTING

AbCd

COUPLER IF COUPLER FAULT , RED LED DS2-B ON CPU900 WILL BE ON THE COUPLER SHALL BE FAULTY IF GREEN LED ON THE COUPLER IS OFF , MAY BE THE MODULE IS NOT PROPERLY INSERTED. SECURE THE MODULE IN THE RACK. CHECK USING VT100 AS OP. CON. WHICH COUPLER IS OFF ( FAULTY ) REPLACE THE COUPLER IF FAULTY
M&T / 20

ALSTOM PROJECTS INDIA LTD

MAINTENANCE
TROUBLESHOOTING

AbCd

CLOCK SYNC FAILURE IF CLOCK SYNC FAILURE , RED LED DS4-B ON CPU900 WILL BE ON. REQUEST CONTROL CENTRE OPERATOR TO SEND SYNCHRONISING MESSAGE TO RTU. IF THE LED IS NOT PUT OFF AFTER FEW SECONDS , CHECK GREEN LED ON SAU900 FLASHING - IF NOT REPLACE SAU900.

ALSTOM PROJECTS INDIA LTD

M&T / 21

MAINTENANCE
TROUBLESHOOTING
CLOCK SYNC FAILURE

AbCd

AFTER REPLACING SAU900 , IF CLOCK SYNC LED IS NOT PUT OFF AFTER FEW SECONDS MAY BE COMMUNICATION PROBLEM. CHECK THE MODEMs. IF COMM. IS OK , REPLACE CPU900 , ASK FOR SYNC. MESSAGE FROM CONTROL CENTRE.
M&T / 22

ALSTOM PROJECTS INDIA LTD

MAINTENANCE
TROUBLESHOOTING
COMMUNICATION FAILURE- MODEM

AbCd

IF MODEM MD50 IS OK , GREEN LED IS OFF ON SAU900 , CHECK THE CONFIGURATION USING OP. CON. SECURE THE SAU900 MODULE , IF GREEN LED IS STILL OFF , REPLACE THE FAULTY SAU900 MODULE.

ALSTOM PROJECTS INDIA LTD

M&T / 23

MAINTENANCE
TROUBLESHOOTING
COMMUNICATION FAILURE

AbCd

THE MODEM MD50 SHALL BE FAULTY IF THE YELLOW LED ON MODEM IS EITHER PERMANENTLY ON OR FLASHING 2S / 2S. THE MODEM MD50 IS FAULTY IF THE GREEN LED (RXD) IS FLASHING AND RED LED (INTERNAL FAULT) IS ON.

ALSTOM PROJECTS INDIA LTD

M&T / 24

MAINTENANCE
TROUBLESHOOTING
COMMUNICATION FAILURE

AbCd

CONNECT VT100 TO MD50 MODEM & CONDUCT BUILTIN SELF DIAGNOSTICS & REPORT THE SPECIFIC FAILURE IN PROPER FORM. COMM. FAILURE , RED LED DS3-A ON CPU900 IS NOT APPLICABLE.

ALSTOM PROJECTS INDIA LTD

M&T / 25

MAINTENANCE
TROUBLESHOOTING
FAULTY CHANNEL / ABNORMAL READING

AbCd

CHECK THE CORRECTNESS OF ANALOG INPUT & DIGITAL INPUT SS / DS STATUS AS APPLICABLE. USING VT100 AS OP. CONSOLE CHECK THE CORRECTNESS OF THE ANALOG READING OR SS/DS STATUS. IF NOT CORRECT REPLACE COUPLER WITH FAULTY CHANNEL.
M&T / 26

ALSTOM PROJECTS INDIA LTD

MAINTENANCE
TROUBLESHOOTING
FAULTY CHANNEL / ABNORMAL READING

AbCd

TRANSDUCER SHALL BE FAULTY IF NOT RESPONDING OR READING THE DEFAULT VALUE WHEN THE INPUTS ARE ISOLATED FROM THE TRANSDUCERS. THIS PROVIDES THE QUICK CHECK ON THE FUNCTIONING OF THE TRANSDUCERS.

ALSTOM PROJECTS INDIA LTD

M&T / 27

MAINTENANCE
TROUBLESHOOTING
L / R SWITCH

AbCd

CHECK THE LAMP RC POL OFF IS OFF WHEN THE L/R SWITCH IS IN R POSITION. CHECK THE LAMP RC POL OFF IS ON WHEN THE L/R SWITCH IS IN L POSITION. IF NOT OK THEN CHECK WIRING , MCB Q5 & Q1 SHOULD BE ON. SIMILARLY THE STATUS IS DISPLAYED ON OP. CON. AS CLOSE - R & OPEN - L.
M&T / 28

ALSTOM PROJECTS INDIA LTD

MAINTENANCE
VISUAL INDICATIONS

AbCd

ALL S900 MODULES MAINTENANCE LED - GREEN ON FRONT FACIA. THIS LED WHEN ON & FLASHING INDICATES THE MODULE IS HEALTHY & THE RESPECTIVE I/O CHANNELS ARE BEING SCANNED. THIS LED WHEN OFF INDICATES THE RESPECTIVE MODULE IS FAULTY OR THE MODULE IS NOT SCANNED OR MODULE NOT ALLOCATED IN DB.
ALSTOM PROJECTS INDIA LTD

M&T / 29

MAINTENANCE VISUAL INDICATIONS


CPU S900 MODULE (FRONT FACIA LEDs)
WATCHDOG EXPANSION RACK FAULT COMM. FAULT (Not applicable in IEC) PERIPHERAL FAULT REMOTE RACK FAULT
ALSTOM PROJECTS INDIA LTD

AbCd

DS1 DS2-B DS3-B DS4-B DS5-B


COUPLER FAULT FIP FAULT CLOCK FAULT

DS2-A DS3-A

DS4-A
DS5-A

DB DOWNLOADING
M&T / 30

MAINTENANCE
DS1

AbCd

CPU S900 MODULE (FRONT FACIA LEDs)


GREEN LED , NORMALLY ON , OFF INDICATES WATCHDOG FAULT. IT SHALL DISABLE ANY RC O/P.

DS2B RED LED , NORMALLY OFF , ON INDICATES ONE OF THE COUPLER IS OUT ie. EITHER FAULTY , NOT CONNECTED OR NOT DEFINED IN DB. DS3B RED LED , NORMALLY OFF , ON INDICATES FIP FAULT , CANT ESTABLISH FIP COMMUNICATIOS.

DS4B RED LED , NORMALLY OFF , ON INDICATES CLOCK FAULT. THE BASE RACK IS OUT OF SYNC. FROM MASTER OR EXPN. RACK W.R.T. BASE RACK.
ALSTOM PROJECTS INDIA LTD

M&T / 31

MAINTENANCE VISUAL INDICATIONS


CPU S900 MODULE (FRONT FACIA LEDs)

AbCd

DS5B RED LED , NORMALLY OFF , ON INDICATES DB DOWNLOADING IS IN PROGRESS ON BASE RACK OR ONTO EXPN. RACK FROM BASE RACK. DS5A RED LED , NORMALLY OFF , ON INDICATES THE REMOTE RACK IS DISCONNECTED. THE BASE / EXPN. RACK DISCONNECTED.
THESE LEDS ARE APPLICABLE ON BOTH BASE AND EXPN. RACK.

ALSTOM PROJECTS INDIA LTD

M&T / 32

MAINTENANCE VISUAL INDICATIONS


CPU S900 MODULE (FRONT FACIA LEDs)

AbCd

DS2A RED LED , NORMALLY OFF , ON INDICATES EXPN. RACK FAULT , ONE / MORE EXPN. RACKS DISCONNECTED. DS3A RED LED , NORMALLY OFF , ON INDICATES THE COMM. FAULT , LOSS OF COMM. WITH MASTER. DS4A RED LED , NORMALLY OFF , ON INDICATES THE PERIPHERAL FAULT , ONE OF THE PERIPHERALS DISCONNECTED FROM RTU.
THESE LEDS ARE APPLICABLE ONLY ON BASE RACK.
ALSTOM PROJECTS INDIA LTD

M&T / 33

MAINTENANCE
OPERATOR CONSOLE

AbCd

OP. CON. (VT100) IS CONNECTED TO PORT J5 OF SAU900 MODULE. IT PROVIDES USER FRIENDLY MENU FOR MAINTENANCE / DIAGNOSTICS. NOTE SELECT THE FUNCTION & ENTER RETURN TO ENDORSE THE FUNCTION. THE FACELITY IS PROVIDED EITHER TO FOLLOW MENU OR ENTER DIRECT COMMAND AT THE COMMAND LINE WHICH IS ACCESSIBLE BY PRESSING F4 (= CHGWD). IN BOTH CASES ENTER Y TO EXECUTE THE COMMAND.
ALSTOM PROJECTS INDIA LTD

M&T / 34

MAINTENANCE OPERATOR CONSOLE


MAIN MENU REPORT ACTION

AbCd

DATE / TIME
VIEW

ALSTOM PROJECTS INDIA LTD

M&T / 35

MAINTENANCE OPERATOR CONSOLE


REPORT STATE RS RM RCT TP SP RC BAY STATION

AbCd

ALSTOM PROJECTS INDIA LTD

M&T / 36

MAINTENANCE OPERATOR CONSOLE

AbCd

REPORT

SYSTEM

RACK COUPLER COMMS PRINTER VERSION

ALSTOM PROJECTS INDIA LTD

M&T / 37

MAINTENANCE OPERATOR CONSOLE

AbCd

ACTION

ASSIGN PRINTER SEND RC SEND SP SEND RCT CAPTURE ACTIVITY RESET RTU
M&T / 38

ALSTOM PROJECTS INDIA LTD

MAINTENANCE OPERATOR CONSOLE


DATE / TIME SET DATE * SET TIME * GET DATE / TIME

AbCd

* These functions are used only at startup (or other emergencies) and then maintained through periodic synchronization from the Master station by means of SYNC command.
ALSTOM PROJECTS INDIA LTD

M&T / 39

MAINTENANCE OPERATOR CONSOLE

AbCd

VIEW

ARCHIVES W/SORT KEYS

ARCHIVES LAST_N_EVENTS
ARCHIVES FAULTS W/TIME/RANGE

ARCHIVES LAST N FAULTS

ALSTOM PROJECTS INDIA LTD

M&T / 40

MAINTENANCE
F1=HELP F2=.. F3=RETURN F4=CHGWD

AbCd

+----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ LAST N FAULTS +---------------------------------------------------------------------------------------------------------------ARCHIVE REPORT *.* 28/10/99 16:12:45:240 TEMPLATE // -----------------------------------------------------------------------+

ARC*.*26/10/99 18:19:43:000 Resetting RTU 0000 rack 00 START ARC*.*28/10/99 12:38:26:000 Resetting RTU 0000 rack 00 START ARC*.*28/10/99 16:12:10:000 Resetting RTU 0000 rack 00 START
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Command or Message : FLN , , , conf (y/n) : y ALSTOM PROJECTS INDIA LTD
M&T / 41

MAINTENANCE
F1=HELP F2=.. F3=RETURN F4=CHGWD

AbCd

+----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ ARCHIVES LAST_N_EVTS +---------------------------------------------------------------------------------------------------------------ARCHIVE REPORT *.* 28/10/99 16:37:25:740 TEMPLATE // ------------------------------------------------------------------------+

ARC*.*28/10/99 16:37:13:050 COUPLER RS

00 rack 00 OFF

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Command or Message : ALN , , , , , , , conf (y/n) : y ALSTOM PROJECTS INDIA LTD
M&T / 42

MAINTENANCE
F1=HELP F2=.. F3=RETURN F4=CHGWD

AbCd

+------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ COUPLER +---------------------------------------------------------------------------------------------------------------STATE REPORT COUPLER *.* 28/10/99 16:42:38:740 TEMPLATE // ----------------------------------------------------------------------+ COUPLER RS 00000000 rack 00 ON COUPLER RS 00000001 rack 00 ON COUPLER ADC 00000000 rack 00 ON COUPLER ARM 00000000 rack 00 ON COUPLER SAU 00000000 rack 00 ON ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Command or Message : CPR , , , , , conf (y/n) : y ALSTOM PROJECTS INDIA LTD
M&T / 43

MAINTENANCE
F1=HELP F2=.. F3=RETURN F4=CHGWD

AbCd

+------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ COUPLER +---------------------------------------------------------------------------------------------------------------STATE REPORT COUPLER *.* 28/10/99 16:42:38:740 TEMPLATE // ----------------------------------------------------------------------+ COUPLER RS 00000000 rack 00 ON COUPLER RS 00000001 rack 00 OFF COUPLER ADC 00000000 rack 00 ON COUPLER ARM 00000000 rack 00 ON COUPLER SAU 00000000 rack 00 ON ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Command or Message : CPR , , , , , conf (y/n) : y ALSTOM PROJECTS INDIA LTD
M&T / 44

MAINTENANCE
F1=HELP F2=.. F3=RETURN F4=CHGWD

AbCd

+----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ GET DATE / TIME +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DATE : 01 / 11 / 99 TIME : 11 : 33 : 52 : 600

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Command or Message : GDT , , conf (y/n) : y ALSTOM PROJECTS INDIA LTD
M&T / 45

AbCd MAINTENANCE REPLACEMENT PROCEDURE RTU S900 MODULES


To replace any module switch OFF RTU power supply ( at power supply module). Switch OFF mcb Q2 (RTU power source). Unscrew fully two screws (securing the module in the rack) located on front FACIA of module. Pull out gently the module with help of module puller / module handle.
ALSTOM PROJECTS INDIA LTD

M&T / 46

AbCd MAINTENANCE REPLACEMENT PROCEDURE RTU S900 MODULES


Store the module in anti-static bag. Refer the O & M manual , check the correct position of straps on the new module to be inserted in the rack. Insert the module gently in the rack aligned in the module guides with Green health led on top.

ALSTOM PROJECTS INDIA LTD

M&T / 47

AbCd MAINTENANCE REPLACEMENT PROCEDURE RTU S900 MODULES


Insert the module fully until it secures in the backplane euro connectors & secure fully the two screws to secure the module in the rack. Switch ON the MCB Q2 (RTU power). Switch ON the RTU (power supply module) and check the green health led on the module , shall be ON.
ALSTOM PROJECTS INDIA LTD

M&T / 48

AbCd MAINTENANCE REPLACEMENT PROCEDURE Active / Reactive Transducers


The field inputs terminated at corresponding TB block located next to the transducers are to be isolated. First the CT inputs at TB #3-4 & TB #7-8 are shorted by loosening the screw , flipping the shorting link & securing by tightening the screw fully. Next slide down the vertical shorting link after loosening screw provided on TB #3-4-7-8. This will isolate the field side.
ALSTOM PROJECTS INDIA LTD

M&T / 49

AbCd MAINTENANCE REPLACEMENT PROCEDURE Active / Reactive Transducers


The PT inputs at TB #9-10-11 are isolated by loosening the screw (unsecuring the link) & sliding down the link provided on TB. Switch OFF MCB Q4. Disconnect the wires from the transducer & keep isolated in safe manner.

ALSTOM PROJECTS INDIA LTD

M&T / 50

AbCd MAINTENANCE REPLACEMENT PROCEDURE Active / Reactive Transducers


To remove transducer from DIN rail, pull down the lock tab at bottom-rear of transducer & swing forward from bottom to detach transducer from DIN rail. Replace the transducer , secure the wiring respectively & switch ON MCB Q4. Displace the shorting links & secure to allow the CT / PT inputs to get connected to the transducers.
ALSTOM PROJECTS INDIA LTD

M&T / 51

AbCd MAINTENANCE REPLACEMENT PROCEDURE Voltage / Frequency Transducers


The field inputs terminated at corresponding TB block located next to the transducer are to be isolated. First the inputs at TB #1-2 are isolated by loosening the screw & sliding down the shorting link provided on TB #1-2. Switch OFF MCB Q4. Disconnect the wires from the transducer & keep isolated in safe manner.
ALSTOM PROJECTS INDIA LTD

M&T / 52

AbCd MAINTENANCE REPLACEMENT PROCEDURE Voltage / Frequency Transducers


To remove transducer from DIN rail, pull down the lock tab at bottom-rear of transducer & swing forward from bottom to detach transducer from DIN rail. Replace the transducer , secure the wiring respectively & switch ON MCB Q4. Displace the shorting links & secure to allow the voltage input to get connected to the transducer.
ALSTOM PROJECTS INDIA LTD

M&T / 53

AbCd MAINTENANCE DATABASE DOWNLOADING PROCEDURE


1.Put the down Load cable(9pin to 9pin) on CPU-900 J-4 port to Laptop port. 2-Open console (HyperTerminal). To Configure Console Open file menu & select properties Press configure. Choose the setting Bits per second-38400 Data bits -8 Parity-None Stop Bit-1 Flow Control -None
ALSTOM PROJECTS INDIA LTD

M&T / 54

AbCd MAINTENANCE DATABASE DOWNLOADING PROCEDURE


3-Reset the RTU. Message displays No FPU present Download data transfer rate 38400 bds. Do you to change(y/n) 4. Press n Message displays RT scope PROM: use esc to toggle Press esc. A RT> prompt will appear Give command line cmd RC>prompt will appear Give command line dlo.n Message display -------List File to be download-----
ALSTOM PROJECTS INDIA LTD

M&T / 55

AbCd MAINTENANCE DATABASE DOWNLOADING PROCEDURE


5 .Come out from console. 6 .Change download cable on CPU-900 J3 port . 7. Open Winload program. Choose Com-1 or Com-2 Press configure Set the bit per second-38400bps. Data bits -8 Parity -None Stop Bits -1 Flow Control -None After Configuring press Upload. System will ask to user the path of Hex file to be downloaded. Give path of ap-rtu hex file & press O.K.
ALSTOM PROJECTS INDIA LTD

M&T / 56

AbCd MAINTENANCE DATABASE DOWNLOADING PROCEDURE

8-Downloading will complete within 10min approx for ap-rtu hex. Again repeat the whole procedure for downloading the particular Station hex file. 9-After completing the downloading, close the Winload. Reset the RTU.

ALSTOM PROJECTS INDIA LTD