Professional Documents
Culture Documents
Capacity Addition & Generation During JULY.12: TOTAL 76036 MU
Capacity Addition & Generation During JULY.12: TOTAL 76036 MU
Capacity Addition & Generation During JULY.12: TOTAL 76036 MU
JULY.12
JULY.12
Target*
Achivement
Description
July.11
Target
Achivement
950.00
0.00
0.00
2010.00
292.00
0.00
1660.00
0.00
0.00
950.00
2302.00
1660.00
60533.85
2709.35
11868.66
923.88
76035.74
56866.00
2223.00
11832.07
1037.00
71958.07
56518.82
2722.88
14146.65
1036.86
74425.21
@ Renewable Energy Sources (RES) includes Small Hydro Project(SHP),Biomass Power(BP), Urban & Industrial
waste Power(U&I), Wind Energy and Solar Power.
Note: Generation (MU) achieved in July,12 is provisional.
1050
950
950
500
50
0
THERMAL
HYDRO
NUCLEAR
Target
TOTAL
Achievement
TOTAL 76036 MU
924
11869
2709
60534
THERMAL
NUCLEAR
HYDRO
Bhutan IMP