Professional Documents
Culture Documents
S.No Name of Building Amount Unit
S.No Name of Building Amount Unit
S.No Name of Building Amount Unit
- Malkangiri NAVODAYA VIDYALAYA SAMITI CONSTRUCTION WING NAME OF WORK :- Construction of Phase - A work at Iind JNV at Dist. Malkangiri (Odissa) Estimate Based on DPAR - 2007 Amount ( in Lacs)
S.No NAME OF BUILDING AMOUNT UNIT
1 2 3 4 5 6 7 9 11 13 14
School Building 1913 sqm. (S/S) R.C.C. framed structure ( Annex. -1 ) Dormitory 1.5 Nos. (D/S) R.C.C. framed structure for 288 students ( 192 Boys + 96 Girls ) with 6 W/R @ Rs. 185.03 Lacs each - Plinth Area - 1603 sqm. ( Annex. - ii ) Kitchen & Dining ( S/S ) R.C.C. framed structure 01 Nos. Area 757 sqm. Each @ Rs. 83.81 Lacs each ( Annex. III ) Principal Residence ( S/S ) R.C.C. framed structure 01 Nos. Area 106 sqm. Each @ Rs. 11.33 Lacs each ( Annex. IV ) Type III Quartes ( D/S ) R.C.C. framed structure 08 Nos. Area 60 sqm. Each @ Rs. 06.79 Lacs each ( Annex. V ) Type II Quartes ( D/S ) R.C.C. framed structure 04 Nos. Area 50 sqm. Each @ Rs. 05.66 Lacs each ( Annex. VI) Type I Quartes ( D/S ) R.C.C. framed structure 04 Nos. Area 40 sqm. Each @ Rs. 04.53 Lacs each ( Annex. VII) TOTAL Add C.I. 142 (10/2009 ) i.e. 42 % on PAR - 2007 TOTAL Add Contingencies @ 3 % TOTAL Add for Dev. Work (L.S.) ( Anexx. VIII ) Add for Boundary Wall (L.S.) TOTAL Add C.A. charges for M/s HPL 9.5 % on all except on contingency ( including planning & execution ) ( 1.5 % for Planning & 8 % for Execution ) GRAND TOTAL
208.58 Lacs. 277.55 Lacs. 83.81 Lacs. 11.33 Lacs. 54.32 Lacs. 22.64 Lacs. 18.12 Lacs. 676.35 284.07 960.42 28.81 989.23 120.00 35.00 1,144.23 Lacs. Lacs. Lacs. Lacs. Lacs. Lacs. Lacs. Lacs. A B C