07/08 '_1? __ 11: .. _FAX
MARUBENI CORP. (ABllPPEO))

DTS COMMENT SHEET I
LAHMEYER
INTERNATIONAL
CONSULTANCY
CONTRACT
PROJECT
SUJU.ECT
N-5919
.N-6524: MARlJDENJ CORf>OR<I.TION- V!SCAS CONSORTIUM
400 'KV CAilLE WORKS SAS AL NAKliEEL, MAHAWl & MllSSAFAll
'DTSNO: 0271 DAn.:o 26.07.2012 ON 26.07,2012
1. DOCUMENT NO. 0 - REV.'()'
Proposed 400kV Cable Route from El-E9 (SectionS) Mahawi- Sas Al Nakhccl
STATUS : "APPROVED EXCEPT AS NOT:EDn
CoMMENTS:
l.
2.
3.
4.
5.
Date:
Water Crossings RC#41, RCtf.42 RC/143 are in principle acceptable, as a shift of the route
closer to the fence is facing obstades. But Contractor is requested, to justify the H.D.D. method
against NDRC. The lengths between 75 - 108m do not JustifY the expensive H.D.D. method
with special machinery. Thus Contractor is advised to check the feasibility to perform the
crossing by NDRC.
We understand the spans 36, 35 and 34 are fo:rr.ning a major Cross Bonding Section, which
requires (ideally) .oea!'ly same lengths of the 3 minor CB sections, i.e. span lengths. In case of
Circuit :2 tbe lengths are Ct)nsiderably different e.g. span 36 is 504 m and span 34 is 643 m.
Contractor shaH attach evidence to his submittal, that the specified requirements concerning
induced sheath voltages and sheath currents i.e. transmission rating are within the required
values. In addition Contractor sball check the feasibility for optimisation by shifting of joint
bay::;.
ln span 31 the cable route is not following the bend I curve of the road, instead going straight
line (tangentially). Contractor should give evidence in his submitt<'ll, that cUived route is not
possible due to other services (as verbally explained).
Span 36 with 504 m belongs to Circuit 2 (not to Circuit 1, as shown in the drawing.)
All NDRC have to he submitted by separate NDRC with profile am! l'mgth and statcme.nt' that
the total NDRC lengths are in compliance with the BoQ for this section.
D 7 AUG ?012
(. } f..--C/1 J )J-C 1:
11-t