25 ton = 25 ton 1 line 25 ton Lead Line Load Example B = = 4,167 ton ~ 5 ton 6 line Lead Line Load Example A =
Load on structure A = 25 ton + 25 ton = 50 ton Load on structure B = 25 ton + 5 ton = 30 ton
B.
Analysis: Load = 25 ton 25 ton = 4,167 ton ~ 5 ton 6 line Load Block C = Load x Factor deg angle Lead Line Load = Load Block C = 25 ton x 2 = 50 ton 3
E-mail:gunawan_hagun@yahoo.co.id
. Load Block D = Lead Line Load x Factor deg angle Load Block D = 5 ton x 1.87 = 9.35 ton . Load Block E = Lead Line Load x Factor deg angle Load Block E = 5 ton x 0.84 = 4.2 ton . Load Block F = Lead Line Load x Factor deg angle Load Block F = 5 ton x 1.41 = 7.05 ton