Professional Documents
Culture Documents
UG - FI100 - General Ledger V1.0
UG - FI100 - General Ledger V1.0
cch tin hnh batch input session trong phn Running Batch nput sessions.
Choose Execute (F8). The system displays the message Session SAPF120 was created.
If message is displayed Session SAPF120 was not created, check again the recurring
entries. For information on running a batch input session, refer to the Running Batch Input
Sessions business process procedure.
2.5.3. X I batch input session.
Tin hnh transaction theo dung dn sau dy.
Access the transaction choosing one of the following navigation options:
SAP menu System->Services->Batch Input->Session
Transaction code SM35
3. Chon Batch input session ban mun tin hnh bng cch nhp chut vo du dng v
nhn Execute - F8. Click at the beginning of the batch input session you want to execute.
Choose Execute - F8.
Page: 51 of 80
4. Nhn chon Process
5. Mn hnh nhp chng t k ton hin thj.
The Realize Recurring Entry screen is displayed.
6. C th thay di thng tin nhp liu trn mn hnh ny.
Page: 52 of 80
It can be changed the information on this screen.
7. Nhn Enter.
8. Nu c thng tin cn thay di, c th chinh sa v Nhn Enter.
9. Xem lai danh sch recurring entries.
3. X I dng s - End-Closing Operation
3.1. S dng - Use
Hoat dng x l dng s l nhng cng vic djnh ky v c th phn nh trong F nhu sau:
ng s cui ngy
ng s cui thng
ng s cui nm
Closing operations are periodic tasks and can be subdivided in FI as follows:
Day-end closing
Month-end closing
Year-end closing
Cc cng vic trong x l dng s gip ban chun bj v tin hnh cc hoat dng cui ngy,
cui thng v cui nm. H thng cung cp mt loat cc bo co c th gip ban dnh gi v
phn tch truc tip s du cc ti khon d post. H thng h tro cc hoat dng sau:
Trch truc/trch dn cc khon chi ph/ doanh thu.
Tao Bng cn di ti khon v Bo co kt qu kinh doanh.
Ghi nhn chng t cc d liu d post.
The closing operations component helps you prepare and carry out the activities required for
day-end, month-end, and year-end closing. For this purpose, the system provides a series of
standard reports that you can use to generate evaluations and analyses directly from all of the
posted account balance. The system helps you carry out the following:
(Time-based) accruals/deferrals of expenses and revenues
Page: 53 of 80
Creating the balance sheets and P&L statements
Document the posting data
(Xem thm thng tin trong cc phn hung dn cu th).
(For more information, read user-guide of each particular section.)
3.2. iu kin - Prerequisites
tin hnh cc hoat dng dng s trong G/L, ban phi thi hnh vic dng s trong cc phn
h con, bao gm:
Khon phi thu v khon phi tr
K ton kho
K ton ti sn c djnh
K ton luong (AA khng p dung)
To carry out the closing operations in G/L accounting, you first need to carry out the closing
operations in the subledger accounting areas you are using. These include:
Accounts receivable and accounts payable accounting
Inventory accounting
Asset accounting
Payroll accounting
3.3. Tin trnh - Process Flow
3.3.1. X I cui ngy - Day-End Closing
3.3.1.1. S dng - Use
Vic x l cui ngy bao gm tt c cc hoat dng vo cui ngy nhm kim tra tt c cc
giao djch d duoc post trong ngy. Khng c hoat dng no nhp thm vo h thng
trong vic x I cui ngy. C th dng cc dnh gi sau cho hoat dng cui ngy v d
luu lai cc d liu d post.
Nht k chng t.
nh gi cc chng t d post.
Day-end closing includes all the activities required at the end of the day to check that all of the
business transactions posted on that day have been correctly processed.
No additional postings are required for day-end closing.
You can use the following evaluations for day-end closing and for documenting the posting
data:
Document journal
Evaluation of the documents that have not been posted
3.3.1.2. Day-End Closing: Checklist
Chng t v kim tra d liu post.
Document and check the posting data
H thng cung cp sn cc bo co sau dy
The following reports are available as examples:
Bo co/Report M t/Description Mc dch s dng
RFBNUM00 Gaps in Document Number
Assignment
S chng t s dung c lin
lac hay khng, c nhy s
khng?
RFBNUM10 Invoice Numbers Allocated
Twice
S