Project Report: "Upgradation of Road From Kachnumbal To Chattergul"
Project Report: "Upgradation of Road From Kachnumbal To Chattergul"
ON
DR O.N.WAKHLU (FIE)
Assuming a uniform traffic growth rate r And the design life N (Cumulative ESAL) n
= = = T0 X
Traffic Details No of HCV No of MCV = = 120 , HCV(L)=930/1328*90= 63, HCV(UL)=.7*82=57 68 , MCV(L)=.7*50=35, MCV(UL)=.7*47=33
T0 = (63x2.86+57x0.31+35x0.34+33x0.02) =210.41( ESAL for one day) Cumulative ESAL = 4811 x 210.41 0.75 = = 7,59,212 (T-7 Category)
Thickness required from the Fig no 4 of SP 72 Thickness provided Details of Pavement GSB WBM II 50mm BM equivalency Value 100mm Semidence