DR O.N.WAKHLU (FIE)

Pavement Design of Duderhama Gadoora Umair-Hair

Assuming a uniform traffic growth rate r And the design life N (Cumulative ESAL) n

= = = T0 X

6% 10 years 365 X (1+0.01r)n -1 x L 0.01r

Where L= lane distribution factor & L=0.75 for two Lane T0


=

No of commercial vehicles per day in the year of opening X VDF

Traffic Details No of HCV No of MCV = = 120 , HCV(L)=930/1328*90= 63, HCV(UL)=.7*82=57 68 , MCV(L)=.7*50=35, MCV(UL)=.7*47=33

T0 = (63x2.86+57x0.31+35x0.34+33x0.02) =210.41( ESAL for one day) Cumulative ESAL = 4811 x 210.41 0.75 = = 7,59,212 (T-7 Category)

Recommended CBR of KM Ist to KM 9th

7.0% (T-7 Category) = = = = = = 375mm 375mm 200mm 75mm 50mm 25mm

Thickness required from the Fig no 4 of SP 72 Thickness provided Details of Pavement GSB WBM II 50mm BM equivalency Value 100mm Semidence