PCC for Credle Per Rm (As per Drawing)

S. No.

Description of Work

No.

Measurement
L(m)

B(m)

D (m)

Qty.
(Cum)

AS-22
For HPC (1800mm)-1 Row

1
2
3

PCC below Pipe


Credle
Deduction for Embeded Pipe
Net Credle Concrete Qty.

1
1
1

1.000
1.000
-1.000

2.660
2.660
1.856

0.250
1.080
1.000

0.665
2.873
-1.856
1.682

1
1
1

1.000
1.000
-2.000

5.420
5.420
1.856

0.250
1.080
1.000

1.355
5.854
-3.712
3.497

For HPC (1800mm)-2 Row

1
2
3

PCC below Pipe


Credle
Deduction for Embeded Pipe
Net Credle Concrete Qty./Rm

AS-24
For HPC (1200mm)-1 Row

1
2
3

PCC below Pipe


Credle
Deduction for Embeded Pipe
Net Credle Concrete Qty.

1
1
1

1.000
1.000
-1.000

2.000
2.000
0.245

0.250
0.300
1.000

0.500
0.600
-0.245
0.855

1
1
1

1.000
1.000
-2.000

3.600
3.600
0.245

0.250
0.300
1.000

0.900
1.080
-0.490
1.490

For HPC (1200mm)-2 Row

1
2
3

PCC below Pipe


Credle
Deduction for Embeded Pipe
Net Credle Concrete Qty./Rm

Remarks

PCC for Credle Per Rm (AS per SP-13)


S. No.

Description of Work

No.

Measurement
L(m)

B(m)

D (m)

Qty.
(Cum)

AS-24
For HPC (1200mm)-1 Row

1
2
3

PCC below Pipe


Credle
Deduction for Embeded Pipe
Net Credle Concrete Qty.

1
1
1

1.000
1.000
-1.000

1.940
1.940
0.814

0.250
0.720
1.000

0.485
1.397
-0.814
1.068

1
1
1

1.000
1.000
-2.000

3.600
3.600
0.814

0.250
0.720
1.000

0.900
2.592
-1.628
1.864

For HPC (1200mm)-2 Row

1
2
3

PCC below Pipe


Credle
Deduction for Embeded Pipe
Net Credle Concrete Qty./Rm

Remarks

Quatities for Head Wall


S. No.

Description of Work

No.

Measurement
L(m)

B(m)

D (m)

Qty.
(Cum)

AS-22
For HPC (1800MM)-1 Row
1

PCC fo leveling couse (M-10)

8.350

1.400

0.150

3.507

Head Wall (RRM)


Deduction for pipe
Net Head wall qty (RRM)

2
-2

8.200
3.801

0.825
0.807

3.450
1.000

46.679
-6.132
40.547

3
4

For HPC (1800MM)-2 Row


1

PCC fo leveling couse (M-10)

10.350

1.400

0.150

4.347

Head Wall (RRM)


Deduction for pipe
Net Head wall qty (RRM)

2
-2

10.200
3.801

0.825
0.807

3.450
1.000

58.064
-6.132
51.932

3
4

AS-24
For HPC (1200mm)-1 Row
1

PCC fo leveling couse (M-15)

6.550

1.400

0.150

2.751

Head Wall (M-15)


Deduction for pipe
Net Head wall qty (M-15)

2
-2

6.400
1.629

0.825
0.807

2.800
1.000

29.568
-2.627
26.941

3
4

For HPC (1200mm)-2 Row


1

PCC fo leveling couse (M-15)

8.250

1.400

0.150

3.465

Head Wall (M-15)


Deduction for pipe
Net Head wall qty (M-15)

2
-2

8.100
1.629

0.825
0.807

2.800
1.000

37.422
-2.627
34.795