Apollo 14 Mission AS-509
Apollo 14 Mission AS-509
22 January
1971
We and, the
plan
to launch no earlier
14 from 13,
Center
31 January
Apollo
be targeted
to a preselected
formation. of this ejecta mission and include thought activation of mans selenological to have been inspection, deposited during Lunar to work survey, the Surface and formation Experiments of
blanket the
lmbrium
deployment
development
ment; and obtaining photographs of candidate records will be obtained of selected mission television Lunar The Lunar will Module 9-day include and Command/Service of the lunar portions will and
and
activities. landing and will lunar in the samples Pacific to the under
mission Recovery
Ocean. quarantine
crew, Spacecraft
spacecraft,
Receiving
Laboratory
Manned
be conducted
procedures.
ZL G3&0
Rocco A. Petrone APPROVAL:
Manned
Space
Flight
Report
No.
M-933-71-14
Apollo
c
14
Mission
OFFKE OF MANNEDSPACEFLIGHT
FOR INTERNAL USE ONLY
FOREWORD
REPORTS
are
published
as required by the Administrator The purpose of these reports and definitive which mission objectives
for the use of NASA Senior Instruction 6-2- 10, dated NASA flight for Senior mission assessment Management plans, of and to mission
complete,
information provide
basis
accomplishment. Initial reports are prepared and issued for each flight project just prior to launch.
Following launch, updating reports foreach missionare ment currently informed of definitive mission results 6-210. distribution of Public on of these Affairs NASA flight reports which publishes missions is intended sometimes which
ManageInstruction
having technical
responsibilities
a comprehensive
MISSION This
REPORT
REPORTS are published in two and the MISSION OPERATION designed to provide and facility SUPPLEMENT
a mission-oriented
equipment APOLLO
and
Distributed DIVISION
by (XP)
REPORTS
HEADQUARTERS
M-933-71
- 14
CONTENTS Page Summary NASA Mission of Apollo/Saturn OMSF Mission Flights Objectives ....................... for Apollo 14 ................ 1 3 4 and lnflight ..................... Demonstrations ........ 19 27 30 31 ...................... 34 35
Operations. Detailed
........................
Management and
Abbreviations
..........................
M-933-71-14
OF Title
FIGURES Page 5
Orbital
Events Area
8 9 11 12
Near
LM
Lunar
13
Layout
14 16 32
l/15/71
ii
M-933-71 .
- 14
OF Title
Windows Photographic
l/15/71
... III
_-.._ ..l_--l-----__--
--
-I_
--
M-933-71-14
SUMMARY APOLLO/SATURN Mission Launch Date 2/26/66 Launch Vehicle SA-201 FLIGHTS Description
Payload
AS-201
CSM-009
Launch vehicle and CSM Test of CSM development. subsystems and of the space Demonstration of vehicle. reentry adequacy of the CM at earth orbital conditions. Launch vehicle development. Demonstration of control of LH2 by continuous venting in orbit. Launch vehicle and CSM Test of CSM development. subsystems and of the structural integrity and compatibility of the space Demonstration of vehicle. propulsion and entry control by G&N system. Demonstration of entry at 28,500 fps. Launch vehicle and spaceDemoncraft development. stration of Saturn V Launch Vehicle performance and of CM entry at lunar return velocity. Verified LM development. operation of LM subsystems: ascent and descent propulsion (including restart) systems Evaluation and structures. Evaluation of LM staging. of S-IVB/IU orbital performance. Launch vehicle and spaceDemoncraft development. stration of Saturn V Launch Vehicle performance.
1
AS-203
7/5/66
SA-203
LH2 in s-IVH
AS-202
8/25/66
SA-202
CSM-011
APOLLO 4
11/9/67
SA-501
CSM-017 LTA-IOR
APOLLO 5
l/22/68
SA-204
LM-1 sLA-7
APOLLO 6
4,'4/68
SA-502
l/15/71
M-933-71-14
FLIGHTS Description
Payload
APOLLO 7 APOLLO 8
CM-101 SM-101 SLA-5 CM-103 SM-103 LTA-B SLA-11 CM-104 SM-104 LM-3 SLA-12 CM-106 SM-106 LM-4 SLA-13
Manned Duration
12/21/68
SA-503
Lunar orbital mission. Mission Ten lunar orbits. duration 6 days 3 hours. Manned CSM operations. Earth orbital mission. Manned CSM/LM operations. Duration 10 days 1 hour. Lunar orbital mission. Manned CSM/LM operations. Evaluation of LM performance in cislunar and lunar envifollowing lunar ronment, Mission landing profile. duration 8 days. First manned lunar landing Lunar surface mission. stay time 21.6 hours. Mission duration 8 days 3 hours. Second manned lunar landing Demonstration of mission. point landing capability. Deployment of ALSEP I. Surveyor III investigation. Lunar surface stay time Two dual EVA's 31.5 hours. 89 hours (15.5 manhours). in lunar orbit (45 orbits). Mission duration 10 days 4.6 hours. Planned third lunar landing. Mission aborted at approximately 56 hours due to loss of SM cryogenic oxygen and consequent loss of capability to generate electrical power and water.
2
APOLLO 9
3/3/69
SA-504
APOLLO 10
5/18/69
SA-505
APOLLO 11
7,'16,'69
SA-506
APOLLO 12
11/14/69
SA-507
APOLLO 13
4/11/70
SA-508
l/15/71
Page
M-933-71-14
OMSF
MISSION
OBJECTIVES
FOR APOLLO
14
sampling
of materials
in a pre-
. . .
Package
(ALSEP).
mans
capability
to work
in the exploration
photographs
of candidate
;Ezuad&+
Rocco Apol A. Petrone Director Associate Manned Administrator Space Flight for lo Program
l/15/71
Page
M-933-71-14
MISSION GENERAL The following and paragraphs post-recovery which may flight orbit contain involve plan prior a brief a T-24
OPERATIONS
recovery, opportunities, plan. from shown LAUNCH The mission major time period; constraints Launch of the
operations.
and
WINDOWS planning related a daily during windows launch considerations to launch window month window a given are vehicle tracking, based and of the windows. launch Launch phase of a few or days of a lunar are meet hours during the mission are, to a different 24-hour
extent, periods:
windows which
defined
a monthly
consists
limits
of 72O to 96O (earth-fixed on booster for the lunar and spacecraft sites. landing
heading performance,
at end
program), constraints
14 launch windows and associated lunar landing launches and a Tt24 in Table 1. The use of night have month been approved for Apollo is still being 14. It should opportunities determined. 1
be noted
TABLE LAUNCH WINDOWS OPEN 15:23 15:03 15:43 16:08 14:22 14:35 14:45
WINDOWS (EST) CLOSE 19:12 19:07 19:38 19:47 17:57 18:00 18:Ol SUN ELEVATION ANGLE 10.3O 1oso 10.5O 23.0 8.0 8.0 22.0
DATE 1971 1971 1971 1971 1971 1971 1971 (T-24) (T-O) (T+24) (T-24) (T-O)
(T+24)
l/15/71
Page
FLIGHT PROFILE
CM/m SEPARATIcm 7
103~NM EARTH
PARKING ORBIT -\
v/
-_-..
LS-IVB IMPACT TRAJECTORY I I
n -. ul .
IVB RESIDUAL S/C SEPARATION,/ ':. v..DPELLANT TRANSPOSITION . I DUMP (IUPACT) DOCKING & WECTIO)( AND SAFIN6 I --S-IVB APS EVASIVE MANEUVER
M-933-71-14
THROUGH vehicle
INJECTION is essentially is launched azimuth stages and between a partial is accomplished coast the same from 72 as that Launch and used during 96O. previous
lunar landing missions. Kennedy Space Center lOO-NM the 1.5 S-IC earth and parking S-II launch unit while
The vehicle
Complex 39A of the The boost into a burns and staging The of stage. injection
S-IVB/instrument revolutions
for approximately
preparing
first-opportunity
(TLI) burn, or 2.5 revolutions if the second-opportunity injection opportunities are to occur over the Pacific the S-IVB/IU and the spacecraft THROUGH injection, spacecraft-LM ejects the maneuver the on a free-return LUNAR ORBIT
TLI burn is required. Both area. The S-IVB TLI burn places translunar INSERTION Module (CSM) docks separates with the from Lunar the S-lVB/lU to clear the coast trajectory.
TRANSLUNAR Within Module performs spacecrafts As on the stages experiment. circumlunar residual liquid ul lage motors. impact have will point an S-band 2 hours
Command/Service (SLA),
the S-IVB/IU
adapter
transposes,
the the
spent
on the
impact
be derived
oxygen (LOX) and The final maneuver will be targeted transponder to insure thermal for
ascent about
propulsion system (APS) 9 hours after launch. The longitude. during first The translunar IU will bias coast. frequency
33O15W
tracking. and LM
be incorporated passive
Spacecraft
control
be initiated
midcourse coast
(MCC) opportunity and will be maintained throughout interrupted by subsequent MCCs and/or navigational During trajectory be used for translunar transfer lunar coast orbit orbit
be used to perform a
The SPS will will remain spacecraft
to a trajectory
of 60 NM.
in a 60 x 170 NM
for approximately
l/15/71
Page
M-933-71-14
LUNAR The
DESCENT
THROUGH descent
LANDING orbit insertion (DOI) maneuver the DOI maneuver. This into a 60 x 8-NM orbit. strip photography landing site as a potential during the (SM) the reaction radially combines the SPS retrograde These events will be taken at Descartes. using (RCS), the the docking will be an of the earlier maneuver are shown which will
Apollo
14 M ission
missions second LOI maneuver with will place the CSM/LM combination in Figure include A soft probe executed approximate moon. be used cynthion. communications (MSFN). of about terrain to minimize LANDING Fra Mauro 100 feet profile 2. During the fourth interest be made to reduce module 1 foot the area undocking capture latches service of AV by the of prime will
revolution,
imparted
downward
the LM descent propulsion system (DPS) will (PDI) w hIC h will occur approximately at peribe performed to insure good LM steerable antenna LM and of the in the the landing Manned phase Space will lunar Flight start Network A lunar program at an altitude surface. (LGC)
coverage
the
at touchdown or thrusting
on the
LM guidance maneuvers.
computer
SCIENCE designated
RATIONALE as the landing site for the Apollo 14 Mission .(Figure of the de3).
has been
The Fra Mauro Formation, lunar surface around Mare posited during the formation
an extensive geologic unit covering large portions Imbrium, has been interpreted as the ejecta blanket of the lmbrium basin. blanket giving
tion may provide information on ejecta samples of deep-seated crustal material lunar samples formation leading interior should of the and the lmbrium processes the age basin active and establish
Sampling of the Fra Mauro Formaformation and modification, and yield information on the composition of the Age points moon. point coordinates are 34019S, dating on the the and returned the age of the scale time material
geologic
of the landing
a radius
of 937.733
referenced
to the Apollo
12 Mapping
l/15/71
Page
.. - -II. .-.--^--_--
2
P
LM DESCENT ORBIT
n -. ul . Kl
EARTH \
APOLLO14LANDINGAREA
JUIUS I I I
CAESAR
WE.
WE.
S-IVB 11 -. to . w
M-933-71-14
SURFACE time
OPERATION lunar surface activity for simultaneous 5 hours greater of crew provide is open-ended, (EVA) crew based with a planned for two Each time maximum EVA and of 35 hours. periods equipment 1 kilometer life may
nominal hours
assessment
utilization on the
operations
to about event
EVA
and
3 kilometers
life support system (BSLSS) is carried for emergency support system (PLSS) failure. Photographs of the the LM cabin window after landing. First During offloaded. experiment, collected and during acquisition the lunar (ALSEP) will will the EVA the Period first The and by the EVAs camera surface EVA S-band the flag Lunar where and Period will (EVA-l) then Pilot Commander the antenna, Mobile
Equipment
Transporter
(MET)
will
be
the Solar Wind Composition be deployed. A contingency sample (LMP). (CDR) T e I evision descends of lunar using color will the film,
be deployed
surface
to record
operations.
The geophone anchor should be employed for soil mechanics measurements immediately prior to its use as the cable anchor if lunar surface operations are ahead, or on the nominal timeline. ment One arming avoid EVAAfter tasks, large danger 1 tasks. completion one rock, crew of the member seismic during 5 shows ALSEP ALSEP will and laser ranging retro-reflector and may fragmental EVA allocation 6 and be delayed the Figures If this (LRRR) deploycollect samples (S-033) Figure traverse arrangement. of rock mortars plan. materials. is extended, in order of time 7 show the to for near
be deployed
approximately the
be collected. 4 depicts
of the
deployment
During the second EVA (EVA-2) will be used to carry equipment Portable appropriate will white landing to Cone then film. site Crater Magnetometer distance be conducted. The order is Cone where Crater, (LPM) from the Still of priority
the LMP will assist the CDR in loading such as cameras, film, and hand tools. will LM. be offloaded The lunar during craters and pulling Star the and geology this a site measurement will vicinity becomes investigation period in the Crater. MET
the MET, which The Lunar made at an (S-059) and traverse the
planned in the
At a point
it is determined
too difficult,
l/l
5/71
Page
10
APOLLO14 EVA-1
?
CDR 20 30 40 50 60 lt10 lt20 1+30
-L
DEPRESS. DEPRESS. lt30 I lt40
MET MESA EGRESS FAM. y& A&J* 3EPLOY ASSIST CDR EGRESS I SUPPORT lt50
S-BAND DEPLOY.
ETB TRANSFERS
3 EGRESS & FAM. MESA CONT. SWC OF;fOAD ACT, SAMP. DEPL. ASSIST W/S-BAND 2tO 2tlO 2+20 INGRESS SWITCH S-BAND EGRESS FLAG DEPLOY. TV PAN & SITE SURVEY 2+40 MET ALSEP ' DEPLOY. OFF-LOAD'
LMP
2+30
260
3+00
CDR ;P ccl (D
l CENTRAL
STATION l ALSEP ANT. DEPLOYMENT INSTALL.
l PSE DEPLOY.
l LR3 DEPLOY.
l PSE OFF-LOAD
aALSEP PHOTOS ! I
.THUM. GEOP. l SIDE/CCIG DEPLOY. OFF-LOAD SURVEY l GEOPHONEDEPLOY. *MORTAR PACK DEPLOY. l ALSEP SYSTEM INTERCONNECT .CPLEE DEPLOY. 3+40 I RETURN TRAVERSE 360 4tOo 4tlO 1 EVA CLOSE-OUT ETB TRANS EVA TERM.
l
3t30
~THUMPER
ACTIVITY
.&$$lED
EVA CLOSE-OUT
M-933-71-14
cn ul co a ul >
a a Ia > ul
M-933-71-14
a0 Oa LL
.mo
a a WLL aa 41
.-_I_
CAMERA
WI
LINE =E
19
CCIG CPLEE LR3 MET NW PSE RTG SIDE
IIHT
COLD CATHODE IONIZATION GAUGE CHARGEDPARTICLE LUNAR ENVIRONMENT EXPERIMENT LASER RANGING RETRO-REFLECTOR MOBILE EQUIPMENT TRANSPORTER NORTHWEST PASSIVE SEISMOLOGY EXPERIMENT RADIOISOTOPE THERMOELC'-TDTr CCL'CDnTn" I SUPRATHERMALION DETE :CTION EXPERIMENT IIVERSAL HAND TOOL
LlrllllL LllLnnIn
1
GEOPHONE
.IG
M-933-71-14
MET
may
at a suitable
be picked Crater point the in the up and crew
location,
carried will
or,
time the
by
the crew,
activities
to the
return a trench
continue A triple
At an appropriate
traverse
be dug.
sample will be taken at an appropriate an LPM traverse measurement provided EVA-2 stowed, allocation CSM During and LUNAR the the and contamination the sample of time ORBIT twelfth orbit revolution at the tasks time will the CSM for the sample return EVA-2 will tasks. containers
place in the traverse. The sufficient time is available. be taken. transferred Figure The SWC to the the 5 shows foil LM. traverse will
be collected 8 depicts
for EVA-2.
will
which lunar LM
will orbital
result lunar
in a
of the
LM rendezvous.
experiments
be performed
is on the
No CSM orbital plane change is required to provide photographic The photography will be accomplished photography site Descartes. topographic the Other etc., LM After LM the 500mm CSM will LIFTOFF completion RCS will CSM will
of camera
malfunction
the
Hasselblad
tasks, in lunar
such orbit.
as dim
light
photography,
solar
corona,
JETTISON and change will ascent with the preparations, CSM. Prior a nominally on Apollo the LM APS and liftoff, of the coplanar 14 instead
to LM
used
on previous prior
time
liftoff 8 NM.
a 48 x 9-NM terminal
38 minutes)
phase initiation (TPI) can be performed using APS. Terminal occur about 1 30 later. The total time from insertion to phase finalization (TPF) will Docking will be accomplished by the CSM with rendezvous will be 85 to 90 minutes. Once docked, the two LM crewmen will transfer to the CSM with RCS maneuvers. a coelliptic rendezvous may be flown by delaying appropriate equipment. If re q uired, the liftoff time or performing appropriate maneuvers subsequent to LM insertion.
insertion
l/15/71
Page
15
APOLLO14 EVA-2
10 , CDR DEPRESS. EGRESS TRANSFER . STATION A MET LOAD TRAV. SAMPLE LMP j DEPRESS. ( ETB 1 i$;;AD ITRAY. LPM POINT MEASUREMENT 0 PAN SAMPLE .STATION .TRAV. B 20 30 40 50 l+D 1+10 1+20 ,1+30
l THERMAL DEGRAD.
l DOUBLE CORE
l TRAVERSE TO CONE
f
lt40
1+50 1
2+0 1
2+30 I
3+OO I
LMP
l STATION E'
.LPM NO.2 *SAMPLES
3+00
3+10
3+20
l
3+30
3+40
4too
4+10
TRANSFERS ;;;M
REPRESS.
M-933-71-14
The waste
iettisoned
may food will will
LM ascent stage
in the ascent be removed
remain
for impact on the lunar surface. be inventoried. All urine, feces, prior to undocking. longitude Ascent 1916W
Food and
unused impact
from
stage
stage
be targeted
for 330s
TRANSEARTH After exceed inclination During time will the the completion the
LANDING CSM trajectory. relation orbital activities, The nominal earths the SPS will be used return time will not 68 hours. equator). coverage from the The return
to inject
110 hours
is presently
planned
to be approximately to the
transearth
spacecraft
be made,
if required.
interface. Earth landing and will be in the mid-Pacific The prime and recovery will nominally ship will occur be the 9 days USS New after launch
1713OW.
Orleans.
helicopter will drop swimmers and life rafts near flotation collar on the CM, attach the life raft, The crew will don the flight suits and and pass fresh flight suits in through the hatch. oral-nasal masks while inside the CM. splashdown, The swimmers Biological crew life crew illness. raft will and isolation The remain helicopter by helicopter Data Retrieval crew pickup garments crew will (BIGS) enter until the will be available from recovery the ship for use in case spacecraft nears a C-141 to the Facility Samoa when for the of unexplained recovery (MQF). they will flight ship The be via
be transferred
and will
Quarantine
in the MQF
to Houston.
flight aboard
helicopter,
the CM
will
be retrieved
and
on a
samples, tamination
The CM will be mated to the MQF, and ship. be retrieved and passed out through etc ., will to the Lunar Receiving Laboratory (LRL). at Pearl Harbor and transported system will be accomplished. to an area
lunar
The spacecraft
l/15/71
Page
17
M-933-71-14
MISSIONS
after
liftoff flight
prevent CM
the
space will
vehicle be initiated.
from
following An abort
an abort
or an alternate
An alternate spacecraft,
that
from
a launch
precludes mission
the greatest
be gained
remaining
Al ternate
The two general categories of alternate Apollo 14 Mission are (1) earth orbital several mission alternate Earth variations and the missions Orbit dock with Following debris which resulting depend systems
the have
upon the nature of the anomaly leading to the alternate status of the LM and CSM. A brief description of these in the following paragraphs.
is contained
The CSM will from the LM. area to eliminate maneuvers US passes. the Apollo Orbit and
the LM, and the photographic equipment will be retrieved the LM will be deorbited into the Pacific Ocean this, The CSM will perform SPS plane change problems. of 40 with daylight coverage then be conducted in accordance Plan, approved 6 April 1970. of all with
to achieve an orbital inclination Earth orbital photography will 13 Earth Orbital Contingency
Lunar
alternate
LM with DPS capability will be employed during a lunar orbit Orbital photography will be performed as well as the planned An SPS plane change of approximately 2.3 will be inflight experiments. accomplished during revolution 14. mission.
The CSM
l/15/71
Page
18
M-933-71-14
DETAILED
OBJECTIVES,
AND
INFLIGHT
to be performed on the Apollo 14 Mission are and lnflight Demonstrations. These Objectives, to the Apollo of each Program, are defined below. investigation. science in general data and experience and
Following
Experiment vides application the Manned Administrator Detailed investigation of hardware Photographic Board, Detailed lnflight are
engineering, to Apollo
technological,
or profor by
programs
is recommended
Board and assigned by the Associate to the Apollo Program for flight. engineering, data and medical, experience or operational for use in development CSM Orbital Experiments as a single
provides
not assigned
Demonstration
A technical
demonstration
of the
capability
of an of space on a non-
apparatus and/or flight environment. interference tion, to mission EXPERIMENTS The Lunar Lunar and the following Surface surface the Lunar are Dust lunar basis success. performance,
process to illustrate or utilize the unique conditions lnflight Demonstrations will be performed only with all other or completion
mission and mission related activities. Utilizaof these demonstrations will in no way relate
experiments Experiments experiments Module so noted. Detector surface photoelectric variations with dust Pilot
are
planned
to be performed
on Apollo
14:
are
deployed EVA
and
during
periods.
by the which
(ALSEP) will provide accretion. dust data for the measurement Accumulation of dust in their A dust, power cells thermal, photoelectric of thermal on any or all outputs. will be and
control of three
degradation
caused
by dust
thermistor
l/15/71
M-933-71-14
engineering detector
on Apollo
11,
The
Passive
Seismology seismic
The passive physical consists will seismometer stations. emplaced, The Lunar
the
internal period
structure,
state, with
tectonic supporting
The short
of a tri-axial
electronic
thermal
systems. through
be controlled
Center
The seismometer, used in conjunction will greatly enhance the effectiveness experiment Seismology seismic seismic It can range. performed (S-033) on Apollo
with the Apollo 12 unit now of lunar seismic exploration. 11 is no longer operating.
seismometer Active
(ALSEP) is designed 3 to 250 to monitor will will sources be fired to generate Hz range natural will and seismic monitor lunar waves artifically and and device by the high at a feet, be near in the devices lines same
The active stimulated subsurface. frequency detected containing astronaut. explosive time with the still to impact first
in the
surface
be produced
by geophones. 21 explosive
energy
A thumper
along
The astronaut will also grenades. The grenades to be determined at four lunar different high explosive but ranges:
emplace a mortar package containing four will be rocket-launched by earth command to LM proportional seismic liftoff. 500, experiment. The grenades 1000, 3000, ranges. are and This approximately 5000 will
subsequent charges
designed
individual
to their
of an active (S-036)
Suprathermal The objectives mation and interaction electric positive Cold ion Cathode on the in the
(ALSEP) ion detector of positive and experiment ions close to provide are to provide lunar data inforsurface
to the
earths between
magnetotail of the
magnetosheath,
on plasma
potential
surface.
to determine a preliminary value for The suprathermal ion detector has two and a total ion detector.
ionization
suprathermal atmosphere.
is to measure
Page
20
M-933-71-14
LOW
Energy low
Solar
Wind solar
(S-038) wind
(ALSEP) measurements will be used to ascertain rays. The and two packages count This will is be
The
energy
experiment
proton and electron flux data for evaluation of solar wind and cosmic crew will deploy the self-contained unit which consists of electronics physical are the Lunar The recorded first analyzers. depending electronically deployment Electrically on energy and of a low the energy (S-059) experiment during the consists planned of collecting EVA lunar charged and information solar particles polarity wind entering of the is transmitted experiment. the detector The deflected particles. to earth.
data flight
at a number
of stops
crew. The crew will samples. The activities patterns Geology Laser The of distribution investigations Ranging purpose
for accessible types of lunar physiographic were performed on Apollos 11 and 12. (S-078) is to enable The precise ranging consists
from
the
earth of
to a point
on the
retro-reflector
of an array
fused silica optical placed on the lunar systems Soil on the earth.
and a mounting and orientation device. When serve as a reflecting target for active laser retro-reflector was deployed on Apollo 11,
A laser
ranging
Mechanics
(S-200) of the soil mechanics and experiment on the soil is to obtain mechanical data on the lunar surface will
characteristics
behavior.
The data
be obtained during the planned EVA traverses and by flight crew observations on the LM-lunar surface interactions. Detailed, information will be derived by from flight crew debriefings, and the soil examining returned photographs, mechanics teams examination of returned lunar material. Soil mechanics investigations soil were performed investigation on Apollos 11 and 12. This will be the first time a lunar mechanics has been (S- 198) will site. be used The of to measure the magnetic field of the moon at performed as a separate experiment.
gamma,
a resolution 50 feet
will have two ranges: +50 gamma and The instrument is placed on a tripod a reading from a cable connected
the astronaut
to make
l/15/71
Page
21
M-933-71-14
Values along meter. hand-held meter and measurements Solar Wind will
three orthogonal axes will be read by the astronaut sent to earth over the voice communication link. with measurements being made
from These
simultaneously.
The purpose composition of particles foil and a spectrometric determination solar wind. Lunar The phase Orbit lunar
composition
experiment
is to determine
the
isotopic
of noble gases in the solar wind, at the lunar in aluminum foil. A staff and yard arrangement maintain its plane analysis perpendicular particles to the suns rays. of the
entrapped in the foil allows quantitative krypton, and xenon composition of the argon, experiments were performed on Apollos 11 and
12.
Experiments orbit experiments are conducted in flight, primarily during the lunar orbit
of the Bistatic
mission. Radar (S-170) (CSM) are to obtain data on the lunar and regolith depth to lo-20 meters. Brewster angle, which is a function material. from The high-
of the bistatic radar experiment properties, surface roughness, will determine constant the lunar lunar surface dielectric of the
The experiment data is obtained the lunar surface and subsurface, S-band gain and or omni VHF communications are utilized antennas, From data light point Lunar
by analysis of bistatic radar ethos reflected in correlation with direct downlink signals. systems, for this including experiment. the VHF omni and S-band
Orbit
(S-178) will located be used along the libration for photographing earths point anti-solar on the the earth-sun Gegenschein and line will
camera in the
region
direction) Photographs if a relationship Gegenschein at the between particles time this first Moulton the at
behind the earth) be taken in lunar exists light between source the may
regions to determine their spatial orbit, after sunset and earthset, Gegenschein from points and orbit and Moulton should indicate exist. does points. be attributable to a collection show the
Photographs taken point. Gegenschein and Moulton the Moulton point experiment has been
presence
if a relationship performed
on an Apollo
l/15/71
M-933-71-14
S-band
Transponder
(S- 164)
The objectives lunar gravity gravitational The experiment for the are Other The CSM
of the S-band transponder experiment are to detect field caused by mass concentrations and deficiencies profiles of the ground tracks of the spacecraft. data and LM is obtained in lunar by analysis orbit. Minute in the lunar of the S-band Doppler
tracking
data motion
perturbations structure.
of the spacecraft
correlated
to mass anomalies
Experiments following experiments crew activity. Meteoroid of the Apollo flux for meteoroid (S-176) window impacts (CM) meteoroid lo-l2 experiment The grams. with is to obtain returned CM data on the windows will will be accomplished by post-mission analysis and require
no inflight Apollo
Window
meteoroid
of mass range
by comparison
a preflight
photomicroscopic
analysis
will
be compared meteoroids.
with
laboratory
calibration
velocity
mass of impacting
Bone This versus flight. in the The as the DETAILED Following objectives
(M-078) the 1/6-g of the possibility exposure Command that of two a difference crewmen Pilot about (CMP) in bone mineral
changes
environment
Module
times, pre- and post-flight, crewmen will be determined (bones of the sites forearm) and study. the for this
the degree of bone mineral changes using an X-ray absorption technique. OS calcis (heel) have been selected
radius,
of the
launch
vehicle
and
spacecraft
detailed
l/15/71
Page
23
M-933-71-14
Launch .
Vehicle the
Detailed expended
Impact conditions.
Post-flight time
determination within
of actual 1 second.
S-IVB/IU
point
of impact
within
5 km,
and
of impact Detailed
Spacecraft
Objectives sample in event for assessing EVA the, nature of the surface material at
is terminated. exploration tank site Descartes. under low density and high
. .
Obtain
photographs
of future 02
Evaluate the CSM supercritical flow rate conditions. Provide crew verbal high sun angles. Evaluate Obtain and the MET data and
performance
photography
on the
visibility
of selected
targets
at
.-
. .
operational reference
lunar lunar
selenodetic
maps. CSM orbital photographs segments of the of the lunar lunar surface surface of prime shine scientific and low interest, level light
specific terminator.
in earth
Obtain data for improving the crew water consumption during Obtain coating data for determining after sample
changes exposure
Evaluate is obstructed
communication surface
system features.
of sight
from
EVA
to LM
by lunar
INFLIGHT Following
l/15/71
Page
24
M-933-71-
14
Separation pick up small electric solutions and will move this charges through when such they are a solution that placed in slightly if an electric molecules from one the other
move at different end of the tube end+. approach of the which A small, quality mixtures organic
effect is known as electrophoresis. the faster molecules in a mixture will samples mixtures gravity outrun the slower ones separation demonstration of organic should environment. separation be demonstrated weights: (3) DNA the samples on the of new (the materials suppress
Since different start moving move toward the and to test where
as they in space,
is designed both
convection
and blue
the
separations
different hemoglobin;
code) from salmon sperm. apparatus could be developed for use in medical prove practical preparations Heat The Flow Heat and for large-scale on board and Flow heaters
biological manned
stations.
Convection and Convection liquids demonstration and gases. changes observe future proposed is designed In three of the water, to perform four tests temperatures solution, and tests on heat around carbon dioxide
in weightless
immersed
in samples
of pure
a sugar
be mapped out by color The fourth test will a suspension be of value processes that have in designing been
of fine
aluminum
in liquid crystal temperature flow induced by heating a sample of The results observed by the astroflakes. experiments and assessing the feasibility products in space.
for manufacturing
Transfer Liquid baffling Transfer in the demonstration storage and is designed transfer to demonstrate the benefits of utilizing
of liquids
in zero-gravity. the
be
conducted with two sets of simulated tanks, one set containing other without any baffling. By observing and photographing the two sets of tanks, a comparison from the use of baffles in zero-gravity space refueling systems. can be made to determine which can be important
l/15/71
Page
25
M-933-71-14
Composite
Casting demonstration is designed to demonstrate the fibre strengthened materials, of cast metals, will be processed to earth. improved in a small The results metallurgical heating from chamber these tests products effect and will of zero-gravity single crystals. on These
in flight in space.
Page
26
M-933-71-14
MISSION MISSION The Saturn be operational ITEM Space Launch First Second Vehicle Vehicle Stage Stage HARDWARE V Launch AND Vehicle
AND CONFIGURATION
DIFFERENCES
Apollo
Spacecraft
14 Mission
will
configurations. DESIGNATION AS-509 SA-509 s- IC-9 S-II-9 S-IVB-509 s-IU-509 Adapter SLA-17 LM-8 SM-110 CM-I Colossus 10 2E NUMBER
Third Stage Instrument Unit Spacecraft-LM Lunar Service Command Module Module Module
Onboard Programs Command Module Lunar Experiment Launch Module Package Complex DIFFERENCES summarizes vehicle and the the significant Apollo
configuration 14 Mission.
differences
associated
with
the
AS-509 Spacecraft
Command/Service
(CSM-
110) Removed flammable fabrication teflon steel sheathed fans, and eliminated, assembly, conductors conductors. oxygen to provide supply backup with to as far as possible, for and with replaced stainless
Cryogenic redesigned
materials,
improved.design
insulated
Added tank
third
cryogenic
oxygen
l/15/71
Page
27
M-933-71-14
.
Added tank solenoid ECS line auxiliary battery in the valve in oxygen Provided tank from capability other backup two. electrical power if fuel to isolate third oxygen
Added SM
becomes return
Added (40#
water capacity)
bags
Provided water
enhancement
system.
Lunar .
Module Added descent anti slosh baffles to tanks stage Improved decreased Enhanced ascent LM batteries PQGS flight performance level uncertainty capability from and
stage CSM/LM
propellant ascent
Added wiring
transfer
to CM. made causing to prevent short circuits ranging retro any free
Modified
Modified and
descent
stage
Quads
Provided reflector
of laser portable
II structure
magnetometer.
Launch s-IC
Vehicle
.
S-II .
No
significant
changes
Added feedline
center
engine
LOX
Alleviated propulsion
Provided cutoff
to destructive propellant
control
l/15/71
Page
28
M-933-71-14
S-IVB
two
position valves
mixture interface
control
by direct
Government Crew
Equipment
BSLSS
water a
Doubles
Experiments
and Lunar
lnflight Portable
Added
Magnetometer
Added
Active
Seismic
See
Experiments
section.
Experiment
Added
Mobile
Equipment
lunar and
acitivty
efficiency
Transporter
for transporting
Added
four
inflight
See pages
24 to 26.
demonstrations Network
. . .
station
deleted. been been added modified at the Canary Island support. station.
for ALSEP
l/15/71
Page
29
M-933-71-14
TV AND Standard obiectives, and camera and special experiments, equipments purpose and and
requirements. locations.
Table
shows
TV AND
PHOTOGRAPHIC
EQUIPMENT
CAMER?A,
HASSELBLAD,
ELECT
HASSELBLAD --. LENS - 6 0 MP: -FILM MAGAZINES FILTER - POLARIZING ---CAMERA, L'UNAR TOPOGSAPIIIC -FILM MAGAZINES -.--CAMERA, LUNAR SUWXCX CLOSE-UP (STEREO) ---.-.--&-.-..sFILM CASSETTE
l/15/71
M-933-71-
14
CREW
DATA
USN) was one distinction of the Mercury the astronauts first American named to
Captain and
by NASA
in April
he holds
of being
5 May
Freedom
he was launched by a Redstone vehicle 7 spacecraft, which carried him to an altitude suborbital flight - a flight to a landing point 302 statute miles down the Atlantic Missile
He was designated Chief of the Astronaut monitoring the coordination, scheduling, astronauts. training applicable equipment; facilitate and ear selection disorder. Module Pilot: Stuart A. Roosa Shepard for assignment and overall and returned This programs to the included to assure design, mission conduct to full monitoring the flight positions
Office in 1963 with responsibility for and control of all activities involving and implementation pilot/non-pilot furnishing pilot systems observations Commander of an inner of available flights; and
NASA
to crew providing
on manned scientific
operations
of feasible 1969
procedures,
(Major, of
USAF) 19 astronauts support crew selected by NASA in for the Apollo 9 flight. was as an experimental 1965 to May 1966, in September 1965.
Flight 1966.
Experience: Major Roosa is one He was a member of the astronaut duty Force from Edgar D. since Base, the
Roosa has been on active test pilot at Edwards Air subsequent Lunar Space training Apollo Spacecraft School Module Flight 9 and where to graduating Pilot: Experience: 1966. after as backup he was
last assignment from September Pilots USN) in the 10. from group
Aerospace
Research
School
Mitchell
in April Center
of the
astronaut
in his class
Research
instructor.
l/15/71
Page
31
APOLLO14 PRIMECREW
l-l -. co . -0
M-933-71-14
CREW Eugene Experience: A. Cernan (Captain, USN) was one of the third group of astronauts
Flight
Cernan
Pilot
Gemini the
on Apollo
lunar-orbital
qualification
verification
of an
space Pilot:
totals E. Evans
more (Lt.
than
264
hours
Commander, is one
Commander
Evans
of the
He served
as a member
of the astronaut
H. Lt.
(Lt.
is one
He is currently
in training Pilot
space
he was assigned
Lunar
Module
on spacecraft
T/15/71
Page
33
M-933-71-14
MISSION TITLE Director, Mission Saturn Apollo Manager Apollo KSC Director Director Launch Flight Program Manager, Apollo Director Program Spacecraft Manager Program Program
MS FC MSC
Brig.
Gen.
Thomas
W.
Morgan
KSC
J. A.
Kapryan Sjoberg
l/l
5/71
Page
34
--.-.-
_I_____--*
M-933-71-14
AGS ALSEP
Abort Guidance System Apollo Lunar Surface Experiments Package Acquisition of Signal AOS Ascent Propulsion System (LM) APS Auxiliary Propulsion System APS (S-IVB) Apollo Range Ins trUmentatiOn ARIA Aircraft Apollo/Saturn AS Biological Isolation Garment BIG Communications. Comaand, and CCATS Telemetry System Cold Cathode Gauge Experiment CCGE Cdnstant Delta Height CDH Ccmwtander CDR Charoed Particle Lunar EnvironCPLEE ment"Experiment Command Module CM Command Module Pilot CMP Close-up Stereo Camera csc Concentric Sequence Initiation CSI Comnand/Service Module CSM Data Acquisition Camera DAC Digital Data Acquisition DDAS System Department of Defense WD Descent Orbit Insertion 001 Descent Propulsion System DPS Display and Keyboard Assembly DSKY Envirofmiental Control system ECS Entry Interface EI Extravehicular Mobility Unit EMU Farth Parkina Orbit EPO La;&-Standard Time EST Equipment Transfer Bag ETB Extravehicular Activity EVA Frequency Modulation FM Feet: Per Second fps Flight Director Attitude FDA1 Indicator Fixed Throttle Position FTP Ground Elapsed Time GET Guidance, Navigation, and GNCS Control System (CSM) Goddard Space Flight Center GSFC High Bit Rate HBR Heat Flow Experiment HFE Hand Tool Carrier HTC Inertial Measurement Unit IMU Instrument Unit IU Intravehicular Transfer IVT Kennedy Space Center KSC Low Bit Rate LBR Launch Control Center LCC Landmark LDMK Lunar Equipment Conveyor LEC Launch Escape System LES launch Escape Tower _-LET Liquid Hydrogen LH Lithium Hydroxide Li 6 H Lunar Module LM Lunar Module. Pilot LMP Lunar Orbit InsertiOn LO1 Loss of Signal LOS Liquid Oxygen LOX Lunar Parking Orbit LPO Landing Radar iR Lunar Receiving Laboratory LRL Laser Ranging Retro-Reflector LRRR
Lunar Surface Magnetometer Launch Vehicle Midcourse Correction Mission Control Center Modularized Equipment Stowage Assembly Megahertz MHz Mission Operations Control Room MQCR Mission Operations Report MOR Mid-Pacific Line MPL Mobile Quarantine Facility MQF Manned Spacecraft Center MSC Marshall Space Flight Center MSFC Manned Space Flight Network MSFN Network NASCOM NASA Camaunications Nautical Mile Office of Manned Space Flight :SF Oxygen Purge System OPS Rate Display Earth and ORDEAL Orbital Lunar Pulse Code Modulation Powered Descent Initiation Ff Pressure Garment Assembly PGA Primary Guidance, Navi ation, PGNCS and Control System (LM B Portable Life Support System PLSS Passive Seismic Experiment PSE Passive Thermal Control PTC Quadrant Reaction Control System ii? Rendezvous Radar RR Radius Landing Site' RLS Real-Time Computer Complex RTCC Radioisotope Thermoelectric RTG Generator Spacecraft s/c Sun Elevation Angle SEA Saturn V First Stage s-IC Saturn V Second Stage S-II Saturn V Third Stage S-IVB Suprathemnal Ion Detector SIDE Experiment Spacecraft-LM Adapter SLA Service Module SM Solar Particle Alert Network SPAN Service Propulsion System SPS Sample Return Container SRC Single Side Band SSB Staff Support Room SSR Space Vehicle sv Solar Wind Composition SWC Experiment Transposition, Docking and LM TD&E Ejection Transearth Coast TEC Transearth Injection TEI Time From Ignition TFI Translunar Coast TLC Translunar Injection TLI Telemetry TLM Terminal Phase Finalization TPF Terminal Phase Initiation TPI Countdown Time (referenced to T-time liftoff time) Television TV Unified S-Band USB United States Navy USN United States Air Force USAF Vanguard VAN Very High Frequency VHF Differential VelOCity bV
l/15/71
Page .36
Report
FEB 2 2 W1 TO : FROM: SUBJECT: A/Acti.n;: MA/Apollo Apollo Administrator Pro:;ram Director Launch Mission Operation Report #l
14 (AS-SOY) Post
The Apollo 14 Mission was successfully launched from the Kennedy Space Center on Sunday, January 31, 1371, and was completed as of the crew planned on Tuesday, February 9, 1971, with reccvery and spacecraft in the Pacific Ocean recovery area. Initial review indicates that alL mission objectives were accomplished. Further and appropriate refined results of analysis of data is continuing the mission will be reported in the Manned Space Flight Centers' technical reports. Attached is the Mission Director's Apollo 14 Summary Report which is Also attached slrbmittcrl as Post Launch Mission Operation Report #l. are tt!c OMSF Primary Mission Oi,,jeccI:ivcs Tar Apollo 14. The Apollo 14 ML:;s: ion tms achieve<! all the assigned primary ul,,jec-t:.ives slltl I judge it: Co 1)~ a s~~cccss.
APPAOVAL:
M-933-71-14
OMSF
MISSION
OBJECTIVES
FOR APOLLO
14
Perform selected
and
sampling
of materials
in a pre-
of the
. . .
activate
Surface lunar
Package
(ALSEP).
mans
capability
to work
in the exploration
photographs
of candidate
&34i&&
Rocco Apollo A. Petrone Director Manned Date: ZO Space Flight Program
RESULTS Based and the upon completed objectives a review stated of the above. assessed 1971,
9 February
this
a success
in accordance
Apollo
Program
M-933-71-14
9 February
1971
INTRODLKTION The Apollo inspection, formation; develop candidate B. Shepard, Pilot tained were (LMP) 14 Mission survey, deploy mans exploration Command Cdr. Edgar 1 through (reference and and was planned as a lunar of materio~s an ApolIo in the crew (CMP) review I). Table Flight Pilot Initial table Mitchell. 12. Lunar lunar members Mai* landing Surface environment; were Stuart detailed indil cates that 2 I !sts Apollo A. mission to: perform Package (CDR) and information mission selenological Fra Mauro (ALSEP); of Alan is conobjectives Capt.
sampling to work
in a preselected and
region obtain
of the
capability
Significant
in tables accomplished
primary
14 achievements.
PRELAUNCH An unscheduled 2 seconds flight prelaunch AND 40 minute due azimuth operations EARW 3 second overcast were of 75.55 hold in the clouds degrees nominal ORBIT successfuCSy at 4,:03 p.m. into an earth after liftoff. vehicle (TLI) the (CSM were and S-IVB) systems and the were S-IVB launched EST, parking from orbit Kennedy oF98.9 Space 1971. Center, The 1 vice Ia unch and rain. the countdown The delayed planned occurred launch at 6-8 resulted The space
to high
in a revised
72 degrees.
Apollo
14 space 40 minutes
Florida, miles
on 31 January
S-lVB/lU,/LM/CSM (NM),
x 102 nautical
space injection
hanslunar
completed,
Sat e liftoff
for an ontime
M-933-71-14
systems
instrument
at approximately
8 minutes
40 seconds
liftoff,
TRANSLUNAR
COAST module (GET). of the from the (CSM) separated from the LM/S-IVB/IU at 3:02 (hr:min) Onboard color television (TV) was initiated as scheduled CSM with the lunar module (LM) and the were subsequent encountered in S-lVB/IU. However, difficulties
The command service ground elapsed time to cover extraction the docking the docking LM sequence. The try. procedure. of the
on the sixth and fourth attempts of an earlier (1) extend/release (3) initiate select at 457 switch GET,
After five unsuccessful first two attempts were made The closure at a higher sequence rate, position, (4) probe The later bottle probe than fired for the
attempts, docking was achieved a low closing rate. The third The fifth attempt switch and CM/LM hard was a repeat consisted to retract, bottle dock capture hard a normal dock. the probe (5) nitrogen of docking
were switch
closing
54 minutes the
indications,
in a normal employed
to trouble-shoot
of the
mechanism.
The crew removed the or abnormal damage. the earlier not system performed evaluation inability work normally was and ground
probe and drogue from The capture latch in a completely of available a hard nominal information dock nor
reasons
would GET.
transmission
terminated
12:12
Th e mission
Tl.e midcourse correction-2 (MCC-2) transfer maneuver was performed at t raiectory 30:36:07 GET. The Service Propulsion System (SPS) b urn of 10.14 seconds resulted in a velocity change of 71.1 feet per second (fps). The burn was nominal in all respects and no trim was required. Approximately 31:00 GET. A GET lost 60:38:14 update the GET, 9 frames of earth dark side dim light photography were taken at about
was was
GET the
to add spacecraft
the
3 seconds on the
that
during
launch
to inclement
weather.
scheduled planned
2/l
l/7
Page
M-933-71-14
TV their crew
began
but
was
to a the as
ground
near very
began
LM about
that
were
LM checkout
was completed
TV pictures conditions.
LM interior and the moon were not TV transmission lasted for 42 minutes
by the change
SPS.
The
second required.
occured Table
at 77:38:14
GET
of 3.5
5 summarizes
INSERTION (LOI) the performed using the SPS. The LOI in a 169.6 x 58.4 NM elliptical CSM/LM a velocity the lunar orbit change of 3022.4 fps. maneuvers. was burn, initiated orbit. The The LOI burn at burn was
produced
6 summarizes INITIATE
The Descent Orbit Insertion spacecraft in a 58.8 x 9.6 producing S-IVB The and west a change IMPACT S-lVB/IU 2600W, of the vibrations ORBIT GET the the photo the 12th impacted 155 NM Apollo the
in velocity
initiated at 86:50:55 GET and placed the the moon. The SPS burned 20.7 seconds Table 6 summarizes the DOI maneuvers. fps.
lunar
surface
at 83:17:55
GET
(1:41
a.m.
EST) at 70495
southeast
2 hours.
ACTIVITIES photography Ground noise these caused which camera tests included noisy. on a Hycon would GET, the the candidate After camera cycling with of the landing a low shutter, site, voltage which
topographic continued.
became
changing
to a second
reproduced
by continuous
conditions at 104:28
undocking
of 77.2
2/l
l/71
Page
M-933-71-14
Commencing four occasions. was suspected would abort. preclude POWERED Powered at crew short LUNAR The but The audio The at and flag, and first was cause circuit CDR at 114:36 S-band solar lunar 108:54 planned trigger
at
106:31 The
bit
appeared This
in the condition
LM
on descent
Procedures
passed
an inadvertent DESCENT Descent GET 30,000 Initiate was feet, the planned LM
(PDI) but
was Landing
at lock
108:42 occurred
GET. radar
minimum at point.
to landing
is 10,000
reported of the
Fra Mauro
on an 8 degree
30 to 60 feet
SURFACE extravehicular 49 minutes Proper is believed breaker from GET late activity due to have cleared the (9:53 a.m. were communications been the LM at a.m. EST). deployed, experiment, (EVA) was were a LM problem. 114:27 EST). The LMP with antenna. GET The the and (lo:50 LMP LMP took a.m. egressed subsequently LMP egress, the panoramic EST), and and started ingressing crew TV pictures touched down the deployed of the sample. the the The LM lunar ladder TV and the LM initiated established configuration at 114:19 during problem. GET a rerun (9:42 a.m. the of the EVA checklist. of the EST),
to intermittent
PLSS communications
during
preparations.
A recycling
surface
(9:59 S-band
collected After
a contingency
activating
erectable
composition
The ALSEP retro-reflector the ALSEP encountered suprathermal detector (3) low ion thumper The
feet
west
the
deployed deployment
an additional
(12:50
(1) difficulty
cold
cathode experiment;
transmitter Apollo
central to fire.
station; of five
detector
(5) failure
experiment
contingency and
43 pounds stage.
of lunar
surface
material
were
satisfactorily
obtained
returned
to the
2/l
l/71
Page
M-933-71-14
was
at
119:08 lunar
(2:31
p.m.
EST).
The
crew
spent and
4 hours experiments,
49
including
30 minute
extension,
deploying
equipment
Communications picture At the resolution crews earlier good which but occurred
of the
TV
131:48
2 hours and
27 wrist area
parameters
to egress,
a broken
for wrist
no required
termination
for analysis. egress, the Mobile Equipment and Cone were a LPM the crater. traverse Transporter lunar The portable LPM site Enroute, measurement (MET) various was was loaded (LPM). was near
Subsequent with They made Cone Many never behind near On the the the then
photographic to traverse terrain stop Figure geological to the rim by about (Station 1).
descriptions
obtained.
interesting quite the rim. return were being 30-foot leg got timeline
features of Cone
were crater
The running
crew
30 minutes.
field
of the
and
samples
An unsuccessful col I ec ted. just received signal antenna. tasks, none antenna
prior strength
improved
following
of which
were
mandatory,
were
not
performed
during
EVA-2
considerations or minor problems: (1) second LPM traverse measuresample; (3) d iametric sample; (4) gas analysis sample; (5) polarimetric (6) t raverse stops at stations D and E; (7) EVA communication evaluation; and at (9) contaminated sample. EVA duration of 4 hours 35 minutes. Total weight of rocks Total collected
24 minutes.
2/l
l/71
Page
M-933-71-14
. .
z 00 . .
? , t-z I ., d r, ;i
. . . .
Z-
2/l
l/n
Page
Oi)
M-933-71-14
The
the
excess
was offloaded,
and
the
LM
repres-
surized
(08:31
maneuver
was
at
GET.
seconds
a change
in velocity 27 and
strip
photography
for revolutions
camera was deleted beacuse of the malfunction of the lunar topographic The bootstrap photography was accomplished using the 500mm lens on the camera. Slight retargeting on revolution 28 provided a greater photographed Hassel blad camera. area of high resolution from which a Descartes essentially camera, encountered landing point may be selected.
topographic
were accomplished the 70mm Hasselblad of the the CMP camera details problems took and that 30,
in accordance with the nominal time500mm lens system was used for Descartes with the lunar topographic camera. using resulted passes. Gegenschein the in photos of Descartes the high sun angle earlier bootstrap
because
Hasselblad/5OOmm washout Numerous Experiment, ASCENT, Liftoff ascent from was of surface
a third set of bootstrap The CMP reported lens. able to see on the
he was
the lunar surface occurred at 142:25:42 GET. System performance throughout Engine cutoff occurred at 142:32:54 GET with velocity residuals nominal. A tweak burn was performed with the reaction control system (RCS) at 1 fps. GET to null ascent residuals. Terminal phase initiation (TPI) was on time at GET. During system the had braking but phase for docking, and telemetry warning indicated signals were that on. the A failed, no caution
guidance
cycling of all circuit breakers and switches did not remedy this condition. Docking No probe/drogue problems were was accomplished at approximately 144:13 GET. experienced. The probe was returned for post-flight analysis, TV during rendezvous and docking was excellent and clearly showed the docking maneuver. POSTRENDEZVOUS The LM RCS was 19 GET. were utilized Impact 331 at S and 147:54 1916W GET were .(see to cause 325s Figure the and 2). Apollo 14 ALSEP. On of the Apollo 13 LM to impact the The moon at about
148:22: coordinates
coordinates
1904OW.
planned
b I
impact
Page
: .
...
.. .M_ _ - 7
-j w ., . .
- _
.\
--
M-933-71-14
TRANSEARTH The
INJECTION,
COAST,
AND
ENTRY
transearth injection maneuver (TEL) was successfully performed on time at 149:16 GET tracking and telemetry shortly after the spacecraft emerged from using the SPS . Initial behind the moon indicated the trajectory parameters were nominal. MCC-5 was fps; flow GET did executed however, rate test at 166:14 only 0.5 at time below was of the through 168:30 the At 4.5 GET. The planned fps was confirmed. GET 02 psia. 169:26 was GET Since the that regulator. progressing and these these test was water readings velocity change for the maneuver
0.7 02
169:ZO
at which respectively.
manifold
15 psia,
not drop
Further the 02
the
a urine dump was made which also increased Since the test nozzle had been sized for a manifold r ( increase of pressure of about 100 psia, 12 percent) by the urine test criteria. at and 172:49.GET. heat flow
commenced were:
demonstrations
composite
liquid appeared
convection. satisfactorily. MCC-6 A lunar Seismic ALSEP 1.5 showing During were 195:09 195:32 Earth antenna. was
demonstrations
televised
performed
not
the
near
axis showing
minute,
reached
the
event
duration
was approximately
1 hour
10 minutes.
press briefing, communications restored on the high gain briefing briefing commenced which ended at at
TV transmission quality
in conjunction transmitted
light
photography
was
at
198:24 y axis
At 201:24
the
Apollo
auto
mode.
Page
M-933-71-14
The
LMPs and
respiration flight
rate controllers
sensor
was
reported not
to be inoperable to trouble
GET. inoperable
The
surgeon sensor. Since path CM/SM altitude Landing landing 270025 recovery Weather cover
decided
to attempt
the angle
traiectory degrees.
was
near
nominal,
MCC-7
was
cancelled.
The
flight
separation occurred at 216:12 was reached at 216:27 GET. occurred point latitude. ship, in the 2000 feet, was about in the The USS New prime high, 14 minutes mid-Pacific CM landed Orleans, area
GET
and
entry
interface
(El)
at 400,000
feet
Drogue and main parachutes after El at 216:42 GET (or 4:05 Ocean, approximately 1 position, 1 mile visibility height 4 feet. from the about
deployed normally. p.m. EST). The longitude from the landing and prime point. cloud 4 NM
recovery scattered,
10 miles,
15 knots,
OPERATIONS recovery helicopter and dropped attached swimmers to the who flotation installed collar. the flotation
to the
CM.
A raft
was deployed
Flight
oral/nasal
masks were lowered into the raft and passed in to the crew through The postlanding ventilation fan was turned off, the CM was hatch. and the astronauts egressed. The swimmer closed the CM hatch and then al I garments, the hatch area, the collar, and the area around the post-
valve. recovered a recovery MODULE pickup recovery From the astronauts. entered After landing the Mobile on the recovery carrier, the Quarantine Facility (MQF).
helicopter and
astronauts COMMAND After dolly transfer began passing The MQF suits masks crew and will
physician RETRIEVAL by the ship. the through MQF the will the
OPERATIONS helicopter, the CM was retrieved It was then moved to the MQF MQF/CM (removal until and containment of lunar the recovery for the samples, lock ship helicopter MQF envelope, data, is near airlock and placed in a and mated to the the MQF engineer etc.), to the Then clean LRL. the flight The aircraft equipment, Samoa. in which aboard
inside procedures
for delivery
will
in the
occupants oral/nasal
MQF
be donned crew
transfer
to Samoa. a C-141
be worn
has entered
2/l
l/71
Page
10
M-933-71-14
them
Air CM
Base,
The
crew the
will ship
remain at Pearl
in the
its arrival
The CM
be offloaded
from
The Sample
(SRCs),
data,
etc.,
will
by fixed-wing aircraft Houston for transport 12 February. SYSTEMS The Saturn GET
USS NEW ORLEANS, and then by separate aircraft Both of the SRCs should arrive at the LRL on LRL.
PERFORMANCE V stages and performances GET. also near nominal at throughout GET, appeared All the the mission spurious are with signals listed the exception in the by the abort 9 in Tables were nominal except for the IU data dropouts at 0.4
spacecraft
of the docking
experienced
about 3:ll
to be generated anomalies
PERFORMANCE crew performance throughout the flight was excellent. while They exhibited
troubleshooting
to revision
by the
2/l
l/71
Page
11
-._ . . . ,_^
M-933-7
l- 14
PRELIMINARY SCIENCE Passive The Seismic Experiment Experiment equilibrium of the other two signal axes. (PSE) at was
SCIENCE
REPORT
Passive
arc appears
and
the low
sensor in of
nominally; found to be
recalibrated
nominally. subsurface scientific lunar the and 12. Seismic Experiment interior Apollo Seismic the
amplitude
be a function
extending our seismic of the LM ascent stage that was recorded 5.5 from
data
on both
frequency
Active
Seismic
Experiment
was
fully
deployed.
All
three
geophones
are
now
in
normal operation mode. The thumper first EVA with the thumper successfully were recorded on the was rate and removed on all second mode and found (HBR) three geophones. and recorded geophone high bit experiment has been Lunar The cover mode sunset Lunar The EVA . geophone was
mode was successfully completed during the firing 13 times. Nine of the 13 thumps It is not yet certain that science data was first four thumps. ON mortar fire At that in the lunar point, the second The was again at the end. implanted surface.
for the
to be loose OFF
successfully ready
commanded
it is now
to arm
Detector Detector The sufficient (Supra high drops Thermal voltage time Ion Detector is off and instrument the 24OC, Experiment instrument i.e., to outgas. - SIDE) is in the approaching dust standby lunar
has been
(Cold the
seal during
The LM
instrument
two
measurements and
of cabin
second
depressurization
jettisoned
2/l
l/71
Page
12
M-933-71-14
The sufficient
with
the
high i.e.,
voltage near
off. lunar
High sunset.
voltage This
will will
on when
temperature
to 24OC, to outgas.
Particle
Experiment Experiment stage. the CPLEE instrument magnetic (CPLEE) dust cover was removed As the ascent stage passed over the recorded recorded field which bursts was of ions entered and electrons in moon a variety of phenomena by the
Charged
Transition
Retroreflector Retroreflector (LR3) was liftoff and a high quality additional did not degrade ranging the required LR3. ranged signal after on by the McDonald Observatory was received. Weather conditions liftoff to verify that the ascent stage
The Laser Ranging team prior to LM have engine Lunar The 40 CSM Lunar The 28, the prevented burn Portable Lunar
Magnetometer Magnetometer of the Apollo B. (LPM) 12 site made two A), measurements; and 100 gamma 210 +I0 to 15
Portable
in the
direction
(at Station
a 40 gamma
to i?I pointing
to the west
at Station
PHOTOGRAPHY Topographic Lunar 34, camera Topographic and during the for 9 frames photography, properly frames through from 240 Camera Photography (LTC) was planned The coast. the then LTC frames crew to be used checked During had the on revolutions out low the orbit, camera again LTC that LTC 4, 14, 27, 4, had from noisy. 14 of Subseexplanation the camera 27, 28, very and became
Descartes functioned noisy; frames After the quent for the was and
malfunctioned. to function
appeared
properly;
to frame it was
camera
decided
for a short
operational
to obtain to provide
operation failed
malfunction
or to provide
operating on the
photographs
Hasselblad
2/l
l/71
Page
13
25 FEB
JY 28 JAN
NOTES: 1. POSITIONS AT Oh GMT ON DATES NOTED 2. XX - YY - ZZ CODE: xx= SUNRISE (SRI, NOON (NN), SUNSET (SS), MIDNIGHT (MN) YY = ALSEP NUMBER. zz = LUNAR CYCLE NUMBER c
1 F
M-933-71-14
Experiments Four orbital experiments the Since were conducted on Apollo 14. These were the Apollo the Bistatic Radar (VHF and S-band), passive experiments, they will not Window and the
Micrometeoroid, Gegenschein. here. Downlink The CSM VHF while attitudes; VHF Bistatic during portion the
be discussed
Radar
Experiment consists of VHF and S-band transmissions with ground based detection of both the was reflected signal from the lunar conducted during The S-band surface. since conducted portion time was portion Goldstone loop period. the experiments for 45 minutes Bistatic analyzer of the throughout experiment Radar signal. the VHF was from the the direct The period was
Experiment frontside signals experiment on the CMP lunar awoke was and
pass,
transmission
surface.
the CMP scheduled rest portion of the experiment required specific 25. the 150-foot CSM on revolution Experiment, Stanford
conducted
the
investigators antenna indicated S-band 210-foot problems during Station the the -
an on-line
at the
recorded
Goldstone
station had some intermittent proper operation was achieved loop receiver operated normally. of of echo modulation
experiment
personnel
oscilloscope
indications
carrier. All indications Computer time will are that both portions of the work on the data has started. be required, and data analysis Bistatic experiment Approximately 200 will continue on
Summary were hours a daily Geaenschein The CSM Photographic (Dim those light that and film, were Gegenschein was
Experiment experiment moons umbra. was carried out using the DAC camera Results are dependent upon post-flight while the analysis.
surface)
Based the
CMPs the
comments were
on percent except
of
remaining
it is assumed to be carried
of these
conducted,
planned
2/l
l/71
Page
15
M-933-71-14
250
and
of the commented
lunar
surface
is unknown. to obtain
several to the
he had important
of opportunities.
Hasselblad/80mm
photography
landing
DEMONSTRATIONS tested and during illustrating the Transearth the operation Coast phase of the mission. was A made
TV presentation 172:30
of the demonstration
Separation of the reported unit and that its objectives the required test were explained during following the TV presentation. the TV
was completed
operated
and
testing
was
completed
in accordance
with
the
The tests produced the desired results. The TV presentation to TV. the advantages of using the baffled tanks in a weightless environment.
and with
Convection the radial and zone cells Flow and was Pattern bottom completed timeframe, cell. of the in accordance the astronauts The oil adhered cell and would with made the requireof
ments prior to the attempts to inject the over During trated astronauts anomaly. junction the botton TV, the the
TV performance. the oil into the the side wall surface and zone
In this
a number
as expected. cell On operation being was repeated for presentation and illusthe
principles
effectively.
questioned
by CAPCOM
as to why
were not using the Flow Pattern cell, they replied noting the aforementioned The demonstrators suggested that the astronauts spread the oil to the center was followed. The formed, as expected. the oil film was established and after a
of the cell. This suggestion Binard cells period of time, The astronauts presentation.
reported
required
procedures
following
the
TV
2/l
l/71
Page
16
,.
I.
^_-
M-933-71-14
Composite
processed Four samples (nos. 4, 5, 6, and 7) were successfully shaking, and cooling cycle prior to the TV presentation. The astronauts illustrated the processing of a sample noted that more samples would be processed. during
the TV presentation
and
2/l
l/71
Page 17
..-. .)
-1...---
__.-- ..^.-.
.-. .^
M-933-71-
14
TABLElSHEETl -.APAP OBJ-ECTIVESANDEIEPENMENTS I. PRIMARYOBJECTIVES The following were the OMSFApollo I& Primary Objectives:
0 Perform selenological inspection, survey, and sampling of materials in a preselected region of the Fra Macro formation. o Deploy and activate Apollo Lunar Surface Experiments Package (ALSEP), to work in the lunar environment. sites.
and Experiments:
Priority
1 ; 4 2 7
Title Contingency Snmple Collection Apollo Lunar Surface Experiments Package (ALSEP) Array C Lunar Geology Investigation (S-059) Photographs of Candidate Exploration Sites Laser Ranging Retro-Reflector (S478) Soil Mechanics (S-200) Portable Magnetometer (S-198) Visibility at High Sun Angles Mobile Equipment Transporter Evaluation Selenodetic Reference Point Update Bistatic Radar (S-170) C34 Orbital Photographic Tasks Assessment of EVA Operation Limits CSMOqgen Flow Rate Solar Wind Composition Thermal Coasting Degradation EVA Communication System Performance Gegenschein From Lunar Orbit (S-178) S-Band Transponder (S-164) Apollo Window Meteoroid (S-176)* Bone Mineral Measurement (M-078)* *Passive experiments; priorities not assigned
9"
10 lit.
12 :
15 16 17 18 19
---
2/l l/7 1
18
M-933-71-14
TABLElSHEET2
POST-TLI
Impact the expended S-IVB/IU on the lunar surface under ncminsl flight profile conditions. Postflight determination of actual S-IVB/IU point of impact within and time of impact within 1 second. III, APPROVED EXF'ERIMENTS The following ere the experiments performed during the mission: ALSEP s-031 sq33 S-036 S-038 Sa58 M-515 Passive Seismic Experiment Active Seismic Experiment Supratherml Ion Detector Charged Particle Lunar Enviroment Cold Cathode Ion Gauge Experiment Lunar Dust Detector LUNARSURFACE s-059 S&78 S-080 S-198 s-200 Lunar Geology Investigation Laser Ranging Retro Reflector Solar Wind Composition Portable Magnetmeter Soil Mechanics LUNARORBIT s-154 s-174 S-176 S-178 CSM/LMS-Band Transponder Experiment Down Link Bistatic Radar Experiment Apollo Window Meteoroid Experiment Gegenschein From Lunar Orbit OTHER M-078 IV. SUMMARY 1. It is considered that accomplishment of the Primary Objectives, paragraph (I), qualify Apollo L!+ as a success. The accomplishment of the Detailed Objectives and Experiments identified in paragraph (II) and (III) further enhanced the scientific and technological return of this mission.
Page 19
5 km,
2/11/m
M-933-71-14
-~
--
2.
not listed
as Detailed
2/H/71
M-933-71-14
TABLE 2
THIRD MANNED LUNARLANDINGMISSION AND RETURN FIRST USE OF MOBiLE EQUIPMENT TRANSPORTER (MET) LARGEST PAYLOAD PLACEDIN LUNARORBIT LONGEST DISTANCETRAVERSED THE LUNARSURFACE ON LARGEST PAYLOAD EVERRETURNED FROM THE LUNARSURFACE LONGEST LUNARSURFACE STAY TIME (33 HOURS) LONGEST TCTAL EVA (9 HOURS AND %. MINUTES) FIRST USE OF SHORTENED RENDEZVOUS TECHNIQUE FIRST SPS DO1 FIRST CONDUCT ACTIVE SEISMIC EXPERIMENT CPLEE, LPM OF -
0 0 0
FIRST CONDUCT INFLIGHT DEMONSTRATIONS OF USE OF COMREDTV WITH NEW VIDICON TUBEON LUNARSURFACE FIRST EXTENSIVEORBITALSCIENCEPERIODCONDUCTED DURINGCSMSOM OPERATIONS
2/H/71
Page
21
I_,
,., r--
. .._-_ _* .
14
TABLE3
EVEiilT Guidance Liftoff 1itch Roll S-IC i2i:gin S-IC Reference Signal arid Roll Complctc Ccbntcr Tilt. Outboard Engine p.rrest Enqinc Cu-toff (TE-3 Cutoff (1'1~-2) Release (TB-1) Start
LET Jettison S--II S-II Center Outboard Enginz Engine Cutoff Cutoff
(TB-6)
(TB-7)
Translunar
t.i.?xs
are
based
on bl.SFi
T,a\lnch
Vc!hicle
Opera-
, ,.-._ .
-. .
M-933-71-14
_--------
--EW-Ei-PS
MISSION i!i%%?OF
EVENT Range Zero (04:03:00 EST, Jan 31) Earth Parking Orbit Insertion Second S-IVB Ignition Translunar Injection CSM/S-IVB Separation, SLA Panel Jettison CSM/LMDocking Spacecraft Ejection From S-IVB S-IVB APS Evasive Maneuver Midcourse Correction-l Midcourse Correction-2 Transfer Maneuver Midcourse Correction-3 Midcourse Correction-4 Lunar Orbit Insertion (Ignition) Descent Orbit Insertion (Ignition) CSM/TXUndocking CSMSeparation CSMCircularization Powered Descent Initiate IM Lunar Landing Begin EVA-l CSMPlane Change (WPC) Begin EVA-2 Terminate EVA-2 LM lxftoff II4 Tweak Burn Terminal Phase Initiate Maneuver LM/CSMDocking L&f Jettison G% Separation Ascent Stage Deorbit Ascent Stage Lunar Impact Transearth Injection Midcourse Correction-5 Midcourse Correction-6 Midcourse Correction-7 CM/SMSeparation Entry Interface (400,000 ft) Landing
ACTUAL(GETTHR:MIN:SEC oo:oo:oo
00:11:52
02:28:30 03:02:30
---
03:56:34
06:04:20 Not Performed 30:36:07 Not Performed ;7:;;:4"; 86i5Oi55 104:28:00 105:51:48 108:42:29 108:54:02 %:igy 13&,8~00 136:16:00
105~46~49
108:42:01 108:53:53 113:30:00 118:09:40 134:15:00 138:30:00 z%E
l43;09iqa
l43ilOi54
lJ&: ;;:g
2zE
~6;30fOO
L!&7:54:19 l&3:22:19 : : Not Performed Not Performed
216: 12: 30
L&50
l4.4.:$:;$
216:38:00
2/l
l/o 1
Page
23
.._
*...
TABLF:S
BURN TIME (SECONDS) VELOCITY CHANGE
--- GET OF'CLOSEST APPROACH WI ------. _- HT mfi CLOSEST APfWACH I REALPRELAUNCH 1 TIME ACTUAL
-- -
-0 353.X 0.5
10 355.8 ---
10 346.5 *
0.4
0.3
0.8
----
0.0 l --- I
N.P.
.
3.8
3.5
59 9 82:462 8 -.
----
:g..k
-we-
----
---1
-e--w---t-
----
(
APOLLO14LUNAk ORBITSUMMARY
o Pehruarv 1971 TABLE 6
N.A .--Not
Applicable
I I I
Page 26
M-933-71-14
I I
U
U
208.6
34.4
2202.0 14.90
835
518 1977.1
lsj.25
lx
24.2
438.6
*T?oo .o ~62.4 **i64.6 . . l?ransducer known to be erroneous
I-----~
I
I.&l RCS PROP (Pou&) LM DPS PROP (Pblrl~ 3 ) IJvj APS PROP (Pounds)
U U U
548.9 18103.5
Mla1.2
**19Q.2
**4.66
85
I I
266
D - Deliverable Quantity U- Usable Quantity !l!K - Tank Quantity T - Total Quantity 2/l
it- At LM ascent stage liftoff -x-s, AT LM ascent stage impact NA - Not Applicable
l/71
._
Page 27
._. ..~
M-933-71-14
SA-509 LAUNCH VEHICLE DISCREPANCYSUMMARY 1. 2. AT 0.4 SECONDSFROM RANGE ZERO THE IU 270 MULTIPLEXER DATA WAS LOST. (59 of 122 ANALOGMEASUREMENTS) AT j:02:3509 GET IU 4lOK MULTIPLEXER DATA WAS LnOSTCAUSING THE LOSS OF THE H60-603 GUIDANCE COMPUTER.
2/l
l/71
Page
28 .-__,_....--
.._ -
.. --
M-933-71-14
COMMANDER'S WASNOTWORKING EKG PRIOR TO LIFTOFF. FIJ?..ST SEVERAL ATTEMl'TSAT DOCKING WERE UNSUCCESSFUL. REACTION CONTROL SYSTEM QUAD OXIDIZER MANIFOLD H PRESSURE LOSS AT SPACECRWT/LAUNCH VEHICLE SEPARATION. INTERMITTENT LOSS OF HIGH GAIN ANTENNA PITCH ME%WREMENT TELEMETRY ON FROM 03:22:00 To 06:31:00 HOURS APOLM ELAPSED TIME. UNEXPLAINED VENTINGON LEFT SIDE OF S/C WITH HIGHERTHANNORMAL OXYGEN FLOW. OXYGEN TANK 2 PRl3SSUB.E TRACKING TANK3 DURING HEATERCYCLE. BETWEEN 76:45 AND 76:55 BE ACHIEVED. PROPER HIGH GAIN ANTENNA AUTO-TRACK COULD NOT
4.
5.
6,
7.
8.
HIGH GAIN ANTENNA FAILED TO ACQUIRE NARROW IN BEAMAUTOREACQUISITION MODE DLIRING REVOLUTION 6.
2/l
l/71
Page ,
M-933-71-
14
ASCENT BATTERY5 VOLTAGE WAS .3 VOLT LOWER THANBATTERY 6. L,GC AB(JRT SWITCHDESCENT ENGINEBlT SET OCCURRED TIMES PRIOR FOUR AGAIN AFTERASCENT PHASE TO POWERED DESCENT INITIATION. RECURRED FROM LUNARSURFACE. C/B OF S-BANDS'TEEXABLE POPPED RECURRED AGAIN AFTERASCENT PHASEFROM LUNARSURFACE. WATER SEPARATOR SPEED(GF9999) ERRATIC. LANDINGRADAR TURNED WITHIN LOWSCALEINSTEADOF HIGH. EXCESSIVE ON SLANTRANGE CHANGES WERE NOTED DTJRING FIRST 8 SECAFTERINITIAL THE ACQUISITION. PLSS COMM. INTERMITTENT DURINGINITIAL ACTIVATIONGET 113:45. PROBLEM WITH ACQUISITIONON I&l STEERABLE ANTENNA TENTHANDFOURTEENTH ON REVOLUTIONS. LOSSOF ABORTGUIDANCE SYSTEM AFTERBRAKINGDURING RENDEZVOUS. LOOSE ITEM HANGING OFF THE ASCENT STAGE.
2.
30
4. 50
6.
7. b 8.
90
2/l
l/71
Page
30
.~ . I . . . . ._.~--I .
M-933-71-14
HYCON Cm
OF THE 18 IGNITERS USEDIN THE THUMPER, FAILED TO FIRE, 5 COIX)R TELEVISIONPICTUREBECAME FUZZY, BOYDBOLTSDIFFICULT TO RELEASE ALSEP/SIDE EXPEFUMENT, ON STIFFNESSOF CABLEBETWEEN SIDE AND CCGE. APPARENT TRANSMITTER LOW POWER OUTPUT CENTRAL ON STATION. NOISY DATAON SIDE. LUNAR MODULE PILOT RIGHT HANDEVA GLOVE WRIST CONTROL CABLEREPORTED BROKEN.
6"
7.
8,
2/l
I,71
Page
31
NASA-HO