Professional Documents
Culture Documents
Uct 1509
Uct 1509
ELS-ML-36 00
Project data: Client: Contractor: Project: Sample data: Sample description: Colombo International Container Terminal China Harbour Engineering Company Ltd Colombo South Container Terminal Project
Rock
Lab Ref. No. ML/AG/1509 Date of testing: Date of Report: 21.05.2012 21.05.2012
Test Data:
Specimwn No. Sampling Depth(m) SpecimenDiameter Specimen Length Sectional area of the Specimen Volume of Specimen Weight of specimen Unit Weight Failure Load Measured Compressive Strength Correction Factor for height diameter ratio Corrected Compressive Strength N/mm2 cm cm cm2 cm3 g g/cm3 kN N/mm2
CHEC (II)-1 4.44 8.76 15.48 135.63 383.10 2.82 39.90 25.77 1.00 25.72
CHEC (II)-2 4.46 8.79 15.62 137.38 405.80 2.95 80.80 51.72 1.00 51.63
CHEC (I)-1 4.42 8.78 15.32 134.47 431.50 3.21 79.08 51.62 1.00 51.58
CHEC (I)-2 4.46 8.80 15.65 137.74 470.50 3.42 55.25 35.31 1.00 35.25
CHEC (I)-3 4.47 8.81 15.72 138.46 411.00 2.97 94.84 60.34 1.00 60.23
Mode of Failure
Note: This report refers specially to the sample analyzed.All the tests were conducted at Water Saturated Condition. Tested by: Checked by Certified by:
ENGINEERING & LABORATORY SERVICES ( PVT ) LTD 62/3, Neelammahara Road, Katuwawala, Boralesgamuwa, Sri Lanka. Telephone : 0094 011 4309494/ 2517037 / 2517365, Fax : 0094 01 2509806, E-Mail : els@elslanka.com.