Professional Documents
Culture Documents
By: Mainak Bhattacharjee Kamalendu Das Gumesh Ch. Murmu Mainak Sarkar
By: Mainak Bhattacharjee Kamalendu Das Gumesh Ch. Murmu Mainak Sarkar
By: Mainak Bhattacharjee Kamalendu Das Gumesh Ch. Murmu Mainak Sarkar
Basic needs..
1.Food 2.Clothes 3.Shelter 4.what??
power
At
GDP at present:6.9% & expected 7.6% after this fiscal year(2012-13) Stress given on more industry customs duty exemption on imported fuel and lower levy on overseas funds for projects to provide relief to crisis-hit power sector. More private investment. India needs at least $135billion to produce 600-1200GW within next 40 years ,which is urgent.
Solar
power generation park,having 620 MW generation capability, started last week in Gujrat Largest and one of the largests in Asia
Indias
125 biomass power plants of almost 1300 MW power plant 30 solar power plants. 3 Nuclear power plants of 2720MW including Kudankulam. More hydro electric power plants
Research Area
1.35000 KM^2 Thar desert is sufficient in generating 700 to 2100GW solar power .It can meet the increasing demand of modern India 2. India is suffering from acute T&D loss of 35% almost. For a standard power system it is 78%.Modern technologies should be invented. 3.More dependence on Wind power surrounding sea area.
NEW projects
West Bengal Green Energy Corporation Limited (WBGECL), the states nodal renewable energy agency, has outlined investments worth Rs 700-750 crore over the next two to three years.(within 2012-13). Katwa thermal power project of 1600 MW by NTPC. 1600MW power project by L&T Power. 2*600MW DVC project at Raghunathpur. 2*250MW DPL Project 2*660MW WBPDCL project at murshidabad.
CLEAN ENERGY
West Bengal playing major role in Solar& Biomass energy.10% of total power consumption of Howrah will be from Solar energy. Total 28MW biomass power plant at North dinajpur, Birbhum & Burden by pvt. Organizations.
Resistance