M.E Thesis Presentation - 2
M.E Thesis Presentation - 2
VALIDATION
For the validation of present work, the pushover curve obtained for Tyagarajar College of engineering, Madurai in the round robin exercise (experiment) conducted by Reactor Safety Division (RSD), of the Bhabha Atomic Research Centre (BARC), Mumbai, at Central Power Research Institute (CPRI), Bangalore.
VALIDATION CONTD..
VALIDATION CONTD..
Material Properties
VALIDATION CONTD..
VALIDATION CONTD..
1200 1000
800
600
400 200 0 0 0.1 0.2 0.3 0.4 0.5 0.6
VALIDATION CONTD..
10000
8000
6000
4000 2000 0 0 0.2 0.4
1X3 636x636 PUSHY 1X4636x636 PUSHY 1X7 636x636 PUSHY 1X10 636x636 PUSHY
-4000
8000 7000
9000 8000 7000 6000 5000 4000 3000 2000 1000 0.1 0.2 0.3 0 0 0.1 0.2 0.3 0.4
6000
1X3 556X556 PUSHY 1X4 556X556 PUSHY 1X7 556X556 PUSHY 1X10 556X556 PUSHY
4000 3000 2000 1000 0 -1000 -2000 0 0.05 0.1 0.15 0.2 0.25
1X3 474X474 PUSHX 1X4 474X474 PUSHX 1X7 474X474 PUSHX 1X10 474X474 PUSHX
5000 4000 3000 2000 1000 0 -1000 0 0.1 0.2 0.3 0.4
1X3 474X474 PUSHY 1X4 474X474 PUSHY 1X7 474X474 PUSHY 1X10 474X474 PUSHY
Roof Displacement (m) Roof Displacement (m) Push Y Curve for Column Size 474x474 mm
8000 7000 6000 1X3 900X450 PUSHX 1X4 900X450 PUSHX 1X7 900X450 PUSHX 1X10 900X450 PUSHX 1X3 900X450 PUSHY 1X4 900X450 PUSHY 1X7 900X450 PUSHY 1X10 900X450 PUSHY
5000
4000 3000 2000 1000 0
0.1
0.2
0.3
0.4
-1000
0.1
0.2
0.3
0.4
1X3 825X375 PUSHX 1X4 825X375 PUSHX 1X7 825X375 PUSHX 1X10 825X375 PUSHX
1X3 825X375 PUSHY 1X4 825X375 PUSHY 1X7 825X375 PUSHY 1X10 825X375 PUSHY
-2000
-4000
8000 7000
6000 5000
1000
0 0 0.1 0.2 0.3 0.4
0.1
0.2
0.3
1X3 450X900 PUSHX 4000 1X4 450X900 PUSHX 2000 0 0 -2000 -4000 0.1 0.2 0.3 1X7 450X900 PUSHX 1X10 450X900 PUSHX
8000 6000 4000 2000 0 -2000 -4000 0 0.1 0.2 0.3 0.4 1X3 450X900 PUSHY 1X4 450X900 PUSHY 1X7 450X900 PUSHY
7000 6000
5000
1X3 375X825 PUSHX 1X4 375X825 PUSHX 1X7 375X825 PUSHX 1X10 375X825 PUSHX
-2000
-3000 -4000
10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 0 0.1 0.2 0.3 0.4
Roof Displacement (m) Roof Displacement (m) Push Y Curve for Column Size 375x825 m
10000 8000
4000 3000
1X3 300X750 PUSHX 1X4 300X750 PUSHX 1X7 300X750 PUSHX 1X10300X750 PUSHX 0 0.1 0.2 0.3
2000
1000 0
0.1
0.2
0.3
0.4
900X450
825X375 750X300 450X900 0 0.1 0.2 0.3 0.4 375X825 300X750
-500
-1000 -1500
-500 -1000
-1500
Push X Curve for 1x3 Bay Models for Different Column Size
Push Y Curve for 1x3 Bay Models for Different Column Size
5000
5000
4000 636X636
4000 636X636 556X556 474X474 900X450 825X375 750X300 450X900 0 0 -1000 0.1 0.2 0.3 0.4 375X825 300X700
3000
2000
556X556
3000
2000
1000
750X300 450X900
1000
375X825 300X700
-2000
-2000
Push X Curve for 1x4 Bay Models for Different Column Sizes
Push Y Curve for 1x4 Bay Models for Different Column Sizes
8000 7000 6000 5000 636X636 556X556 474X474 900X450 825X375 750X300 450X900 1000 0 0 -1000 -2000 0.1 0.2 0.3 0.4
474X474 3000 2000 1000 0 0 -1000 -2000 0.1 0.2 0.3 0.4 900X450 825X375 750X300 450X900
4000
556X556
375X825
300X750
375X825
300X750
-3000
Push X Curve for 1x7 Bay Models for Different Column Size
Push Y Curve for 1x7 Bay Models for Different Column Size
10000
8000 636x636 556x556 474x474 4000 2000 0 0 -2000 -4000 -6000 0.1 0.2 0.3 0.4 900x450 825x375 750x300 450x900 375x825 300x750
6000
6000
2000
825x375
750x300
0 0 -2000 0.1 0.2 0.3 0.4 450x900 375x825 300x750
-4000
Push X Curve for 1x10 Bay Models for Different Column Size
Push Y Curve for 1x10 Bay Models for Different Column Size
1500 1000 500 0 0 -500 -1000 -1500 0.1 0.2 0.3 0.4 1x3 4 STOREY 1x3 7 STOREY 1x3 10 STOREY
1500 1000 500 0 0 -500 -1000 -1500 0.1 0.2 0.3 0.4 4 STOREY 7 STOREY 10 STOREY
Comparison of Pushover Curves of LLRS and Bare Frame for Model 1x3 Bay in Push X
Comparison of Pushover Curves of LLRS and Bare Frame for Model 1x3 Bay in Push Y
Comparison of Pushover Curves of LLRS and Bare Frame for Model 2X3 Bay in Push X
Comparison of Pushover Curves of LLRS and Bare Frame for Model 2x3 Bay in Push X
Comparison of Pushover Curves of LLRS and Bare Frame for Model 7x5 Bay in Push X
Comparison of Pushover Curves of LLRS and Bare Frame for Model 7x5 Bay in Push X
The maximum base reaction is increased for all LLRS compared to that of bare frame model in both Push X and Push Y case; except that of masonry diagonal strut model showing that almost same base reaction that of bare frame model for Push Y case. For Push X, among all LLRS, the maximum base shear is obtained for X-ISB. The maximum base shear of 1x3, 2x3 and 7x5 bays X-ISB are increased by 3.37, 3.77 and 1.75 times respectively as that of bare frame model. For Push Y, among all LLRS, the maximum base shear is obtained for Internal Shear Wall (IS) model. The maximum base shear of 1x3, 2x3 and 7x5 bays IS are increased by 2.83, 3.76 and 2.30 times respectively as that of bare frame model. For both Push X and Push Y, among all LLRS, the maximum displacement reached is for External Shear Wall (ES) model except that of 1x3 and 2x3 bays model for Push X case.
Capacity-Demand Spectrum for 1x3 Bare Frame Model in PUSH X and Push Y
Capacity-Demand Spectrum for 2x3 Bare Frame Model in PUSH X and Push Y