Professional Documents
Culture Documents
Gap Audit Report On Deep Blessing Ventures
Gap Audit Report On Deep Blessing Ventures
1.0 INTRODUCTION
This inspection was done to enable Deep Blessing Ventures a filtered sachet water production off Tuba Road, Kasoa to set-up, implement and design a comprehensive quality control system and record documentation necessary to meet international quality standard.
AREA
Establishment (i) Location
FINDINGS
Establishment
STATUS
Yet to fix window
REMARKS
Satisfactory 2
DESIGNS
(ii) Roadways
VENTURES
objectionable prevent dust from odours, smoke entering PROFESSIONAL QUALITY EXPERTS but not other production area contaminants like dust particles Roadways were Roadway in front Unsatisfactory GAP AUDIT REPORT ON DEEP BLESSING not paved and of the factory yet vehicles rather to be filled and find it difficult graded with sand accessing that and stones. road
A solid constructed well ,however loose openings around the gate mouth must be sealed to prevent dust, rainwater and any other contaminants from entering. And a polytank mounted on a solid concrete platform Structure for the water processing activities has been well constructed Water production structure yet to be painted and named appropriately
Satisfactory
Satisfactory
(iii) Ceilings
A whole rectangular floor surface was tiled The whole surface area of the walls were tiled up to the door level A wooden ceiling or roofing was in place and yet to be painted Windows were not screened The door at the entrance of the production area is in a deplorable state and must be changed Living quarters is not completely
Satisfactory Satisfactory
90% complete
Satisfactory
Yet to fix Needs to be changed with a compact door and a spring fixed to it to enable selfclosure when opened One room attached to the
Unsatisfactory Unsatisfactory
Unsatisfactory
3.0 RECOMMENDATIONS: Needs an extensive work to be done on site right from raw material intake points to the storage area to meet GSBs basic quality requirements.
Date: 28/08/09