Professional Documents
Culture Documents
dm51 Jul02 V8
dm51 Jul02 V8
dm51 Jul02 V8
MATERIAL: Furnish dumped rock fill conforming to CMS 703.19.B, Type B, C, or D. CONSTRUCTION: Comply with CMS 107.19 and construct as per CMS 207.03.B.8.b. The number of culverts needed will vary with the width of the crossing and the size of the culverts. PAYMENT: As per CMS 207.07, the Department will not pay for Stream Crossing Work.
REVISIONS
7-19-02
Flow
Access Road
Flow
( I BRACKETS [ ) ARE N ]
f cheek
Width (W)
PLAN VIEW
I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ DM \ dm 51 j 02_ V8. _ ul dgn
Encroachment (E)
Culvert across whole channel Diversion Diversion When the channel encroachment is less than 1 of the 3 channel width, then no pipe is required. < 1/3 W) (E
Furnish culverts with a minimum diameter at least two times the depth of normal stream flow measured at the crossing centerline or 18" [450], whichever is greater.
SECTION
SCD NUMBER
O FFI E C
EN G I EERI G N N
OF
OTHERWI SE NOTED.
J Stai s . n