dm51 Jul02 V8

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES

MATERIAL: Furnish dumped rock fill conforming to CMS 703.19.B, Type B, C, or D. CONSTRUCTION: Comply with CMS 107.19 and construct as per CMS 207.03.B.8.b. The number of culverts needed will vary with the width of the crossing and the size of the culverts. PAYMENT: As per CMS 207.07, the Department will not pay for Stream Crossing Work.

STATE OF OHI DEPARTMENT OF TRANSPORTATI O ON

REVISIONS

7-19-02

Flow

Minimize width of clearing

Access Road

Flow

ALL METRI DI C MENSI ONS

I MI N LLI METERS UNLESS

( I BRACKETS [ ) ARE N ]

f cheek

STRUC TURA L D M -5. 1 ST REA M A ND RI ER V C RO SSI G S N

1 2- SEP- 2008 1 47PM 2:

Width (W)

PLAN VIEW

I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ DM \ dm 51 j 02_ V8. _ ul dgn

Encroachment (E)

Culvert across whole channel Diversion Diversion When the channel encroachment is less than 1 of the 3 channel width, then no pipe is required. < 1/3 W) (E

Rock fill only. No soil

Rock fill only. No soil

Furnish culverts with a minimum diameter at least two times the depth of normal stream flow measured at the crossing centerline or 18" [450], whichever is greater.

10 Maximum spacing between culverts * with a minimum of one culvert

* Place culverts so as not to back up water.

SECTION

SCD NUMBER

STANDARD HYDRAULI CONSTRUCTI C ON DRAWI NG

O FFI E C

50 [16.5 m] from stream to diverson

50 [16.5 m] from stream to diverson

EN G I EERI G N N

OF

OTHERWI SE NOTED.

J Stai s . n

ROADWAY HYDRAULI C ENGI NEER

STATE HYDRAULI ENGI C NEER

You might also like