3% OF MATERIAL COST
RGS CONSTRUCTION TECHNOLOGIES
PRIVATE LIMITED
INDIA
OBJECTIVE FRAMEWORK
SCRAP OPTIMIZATION
12 METER STOCK
Bar
DETAILED
Tonnes
Tons
Optimised
Off
Cuts
% on Detailed
Ref
Numbers
Scrap
Off
Cuts
Scrap
Total
T 16
56,512
335
339.00
1.32
2.34
0.39
0.69
1.08
T 20
26,194
503
734.00 230.33
0.73
31.38
T 25
18,242
269
279.00
6.31
3.32
2.26
T28
2,640
82
94.50
11.07
1.67
11.71
1.77 13.48
T32
3,048
189
217
26.71
1.52
12.31
0.70 13.01
Total Tons
1378
1663.50 275.74
9.58
16.58%
0.58%
0.10 31.48
1.19
3.45
17.16%
ACHIEVEMENT OF OBJECTIVE
ANALYSIS
STANDARD STOCK LENGTH OPTION
ON A BAR-WISE BASIS IT MAY BE PERTINENT TO MENTION THAT THE MINIMUM
ORDER OF 200 MTS IS NOT ACHIEVED ONLY IN THE CASE OF T28 & T32 BARS.
THIS IS PRIMARILY BECAUSE THE REQUIREMENT FOR THESE BARS IN THE TOTAL
QUANTITY OF 1378 TONS, IS ITSELF LESS THAN 200 MTS 82 MTS & 189 MTS FOR T28
& T32 RESPECTIVELY.
SCRAP HAS BEEN OPTIMISED TO THE LOWEST LEVEL. ANY ATTEMPT TO REDUCE THE
OFF-CUT GENERATED RESULTS IN AN INCREASE IN THE SCRAP LEVEL PERCENTAGE
HOWEVER AN ATTEMPT HAS BEEN MADE TO OPTIMISE Off CUTS GENERATED BUT AT
THE SAME TIME TO KEEP THE SCRAP LEVEL AT 3% OR BELOW
THE ATEMPT WAS LEVEL SIMULTANEOUSLY OPTIMISE THE OFF CUTS AS WELL AS THE
SCRAP LEVEL THROUGH THR ROUTE OF MILL ORDERS.
To Order
Numbers
Tonnes
Tons
Cost
Rs. Lacs
Off
Cuts
% on Detailed
Scrap
Off
Cuts
Scrap
Total
0.39
0.69
1.08
8.08
2.72
10.80
17,857
339.00
169.50
1.32
2.34
8,064
16979
239.00
325.00
119.50
162.50
45.57
15.34
746
5540
34.50
239.00
17.25
119.50
1.04
2.95
0.38
1.08
1.46
1,630
94.50
47.25
11.07
1.67
11.71
1.77
13.48
2,868
217.00
108.50
26.71
1.52
12.31
0.70
13.01
5.76
1.60
7.36
(12m)
(12m)
(12m)
T 28
(12m)
T 32
(12m)
Total Tons
Value in
Rs. Lacs
T 25
To Order
Numbers
Tonnes
Tons
Cost
Rs. Lacs
Off
Cuts
% on Detailed
Scrap
Off
Cuts
Scrap
Total
(12m)
17,857
339.00
169.50
1.32
2.34
0.39
0.69
1.08
43.00
(14950)5,946
(17700)6,608
1.00
220.00
289.00
0.50
110.00
144.50
3.26
3.32
0.64
0.65
1.29
746
5540
34.50
239.00
17.25
119.50
1.04
2.95
0.38
1.08
1.46
1,630
94.50
47.25
11.07
1.67
11.71
1.77
13.48
2,868
217.00
108.50
26.71
1.52
12.31
0.70
13.01
3.03
0.82
3.87
(12m)
(12m)
T 28
(12m)
T 32
(12m)
Total Tons
Value in
Rs. Lacs
T 25
T 28
T 32
To Order
Numbers
Tonnes
Tons
Cost
Rs. Lacs
Off
Cuts
% on Detailed
Scrap
Off
Cuts
Scrap
Total
17,857
339.00
169.50
1.32
2.34
0.39
0.69
1.08
1,154
17188
6838
34.00
329.00
176.00
17.00
164.50
89.76
17.89
18.27
3.32
3.39
6.71
746
5540
34.50
239.00
17.25
119.50
1.04
2.95
0.38
1.08
1.46
1,630
94.50
47.25
11.07
1.67
11.71
1.77
13.48
432
2436
33.00
168.00
16.50
85.68
4.26
7.06
2.13
3.53
5.66
2.46
2.23
4.67
(12m)
(12m)
(12m)
(12m)
(12m)
Total Tons
Value in
Rs. Lacs
To Order
Numbers
Tonnes
Tons
Cost
Rs. Lacs
Off
Cuts
% on Detailed
Scrap
Off
Cuts
Scrap
Total
(12m)
17,857
339.00
169.50
1.32
2.34
0.39
0.69
1.08
43.00
(14950)5,946
(17700)6,608
1.00
220.00
289.00
0.50
110.00
144.50
3.26
3.32
0.64
0.65
1.29
T 25
746
(11200)5540
34.50
239.00
17.25
119.50
1.04
2.95
0.38
1.08
1.46
T 28
108
(11650)902
(9450)620
6.00
51.00
28.00
3.00
26.01
14.28
3.37
0.18
3.97
0.21
4.18
432
(10900)2436
33.00
168.00
16.50
85.68
4.26
7.06
2.13
3.53
5.66
706.72
13.26
15.85
0.94
1.13
2.06
T 20
T 32
(12m)
(12m)
(12m)
(12m)
ACHIEVEMENT OF OBJECTIVE
OUR CONCLUSION
1.
2.