SCRAP MINIMIZATION TO

3% OF MATERIAL COST
RGS CONSTRUCTION TECHNOLOGIES
PRIVATE LIMITED
INDIA

OBJECTIVE OF THE EXERCISE

OBJECTIVE FRAMEWORK

SCRAP OPTIMIZATION
12 METER STOCK
Bar

DETAILED

Tonnes

Tons

Optimised

Off
Cuts

% on Detailed

Ref

Numbers

Scrap

Off
Cuts

Scrap

Total

T 16

56,512

335

339.00

1.32

2.34

0.39

0.69

1.08

T 20

26,194

503

734.00 230.33

0.73

31.38

T 25

18,242

269

279.00

6.31

3.32

2.26

T28

2,640

82

94.50

11.07

1.67

11.71

1.77 13.48

T32

3,048

189

217

26.71

1.52

12.31

0.70 13.01

Total Tons

1378

1663.50 275.74

9.58

16.58%

0.58%

0.10 31.48
1.19

3.45

17.16%

ACHIEVEMENT OF OBJECTIVE

ANALYSIS
STANDARD STOCK LENGTH OPTION
ON A BAR-WISE BASIS IT MAY BE PERTINENT TO MENTION THAT THE MINIMUM
ORDER OF 200 MTS IS NOT ACHIEVED ONLY IN THE CASE OF T28 & T32 BARS.
THIS IS PRIMARILY BECAUSE THE REQUIREMENT FOR THESE BARS IN THE TOTAL
QUANTITY OF 1378 TONS, IS ITSELF LESS THAN 200 MTS 82 MTS & 189 MTS FOR T28
& T32 RESPECTIVELY.
SCRAP HAS BEEN OPTIMISED TO THE LOWEST LEVEL. ANY ATTEMPT TO REDUCE THE
OFF-CUT GENERATED RESULTS IN AN INCREASE IN THE SCRAP LEVEL PERCENTAGE
HOWEVER AN ATTEMPT HAS BEEN MADE TO OPTIMISE Off CUTS GENERATED BUT AT
THE SAME TIME TO KEEP THE SCRAP LEVEL AT 3% OR BELOW
THE ATEMPT WAS LEVEL SIMULTANEOUSLY OPTIMISE THE OFF CUTS AS WELL AS THE
SCRAP LEVEL THROUGH THR ROUTE OF MILL ORDERS.

MILL - SIDE CONSTRAINTS

OPTION 1 - MILL ORDER


WITH BAR LENGTHS 7 M TO 12 M
MINIMUM ORDER 200 MTS
Bar
Ref
T 16
T 20
T 25

To Order
Numbers

Tonnes

Tons

Cost
Rs. Lacs

Off
Cuts

% on Detailed
Scrap

Off
Cuts

Scrap

Total

0.39

0.69

1.08

8.08

2.72

10.80

17,857

339.00

169.50

1.32

2.34

8,064
16979

239.00
325.00

119.50
162.50

45.57

15.34

746
5540

34.50
239.00

17.25
119.50

1.04

2.95

0.38

1.08

1.46

1,630

94.50

47.25

11.07

1.67

11.71

1.77

13.48

2,868

217.00

108.50

26.71

1.52

12.31

0.70

13.01

5.76

1.60

7.36

(12m)

(12m)

(12m)

T 28

(12m)

T 32

(12m)

Total Tons
Value in

Rs. Lacs

OPTION 2 - MILL ORDER


WITH BAR LENGTHS 7 M TO 18 M
MINIMUM ORDER 200 MTS
Bar
Ref
T 16
T 20

T 25

To Order
Numbers

Tonnes

Tons

Cost
Rs. Lacs

Off
Cuts

% on Detailed
Scrap

Off
Cuts

Scrap

Total

(12m)

17,857

339.00

169.50

1.32

2.34

0.39

0.69

1.08

43.00
(14950)5,946
(17700)6,608

1.00
220.00
289.00

0.50
110.00
144.50

3.26

3.32

0.64

0.65

1.29

746
5540

34.50
239.00

17.25
119.50

1.04

2.95

0.38

1.08

1.46

1,630

94.50

47.25

11.07

1.67

11.71

1.77

13.48

2,868

217.00

108.50

26.71

1.52

12.31

0.70

13.01

3.03

0.82

3.87

(12m)

(12m)

T 28

(12m)

T 32

(12m)

Total Tons
Value in

Rs. Lacs

OPTION 3 - MILL ORDER

BAR LENGTHS 7 M TO 12 M & MINIMUM


ORDER 150 MTS
Bar
Ref
T 16
T 20

T 25
T 28
T 32

To Order
Numbers

Tonnes

Tons

Cost
Rs. Lacs

Off
Cuts

% on Detailed
Scrap

Off
Cuts

Scrap

Total

17,857

339.00

169.50

1.32

2.34

0.39

0.69

1.08

1,154
17188
6838

34.00
329.00
176.00

17.00
164.50
89.76

17.89

18.27

3.32

3.39

6.71

746
5540

34.50
239.00

17.25
119.50

1.04

2.95

0.38

1.08

1.46

1,630

94.50

47.25

11.07

1.67

11.71

1.77

13.48

432
2436

33.00
168.00

16.50
85.68

4.26

7.06

2.13

3.53

5.66

2.46

2.23

4.67

(12m)

(12m)

(12m)

(12m)

(12m)

Total Tons
Value in

Rs. Lacs

COMBINED MILL ORDER BAR LENGTHS


BEST RESULTS
Bar
Ref
T 16

To Order
Numbers

Tonnes

Tons

Cost
Rs. Lacs

Off
Cuts

% on Detailed
Scrap

Off
Cuts

Scrap

Total

(12m)

17,857

339.00

169.50

1.32

2.34

0.39

0.69

1.08

43.00
(14950)5,946
(17700)6,608

1.00
220.00
289.00

0.50
110.00
144.50

3.26

3.32

0.64

0.65

1.29

T 25

746
(11200)5540

34.50
239.00

17.25
119.50

1.04

2.95

0.38

1.08

1.46

T 28

108
(11650)902
(9450)620

6.00
51.00
28.00

3.00
26.01
14.28

3.37

0.18

3.97

0.21

4.18

432
(10900)2436

33.00
168.00

16.50
85.68

4.26

7.06

2.13

3.53

5.66

Total Tons 1,407.50

706.72

13.26

15.85

0.94

1.13

2.06

T 20

T 32

(12m)

(12m)

(12m)

(12m)

ACHIEVEMENT OF OBJECTIVE

OUR CONCLUSION
1.

NEGOTIATE MINIMUM ORDER QUANTITY TO


150 TONS.

2.

PAY THE PREMIUM ON THE BARS NOT


MEETING THE MINIMUM ORDER QUANTITY
OF 150 MTS
OR
IF POSSIBLE, SHIFT THIS TONNAGE TOANOTHER
STEEL MILL AT A LOWER / NO PREMIUM