Professional Documents
Culture Documents
Switchyard Phase II Status As On 17
Switchyard Phase II Status As On 17
Switchyard Phase II Status As On 17
Manpower: 23
Particular (Equipment)
Lighting Mast Tower T2 Tower T2P Tower T2PB Tower T2PH Tower T2A
Total Excavation
6 16 06 02 06 03 3 9 2 1 2 2
PCC
3 9 2 1 2 2
Raft
3 9 2 1 2 1
First lift
3 6 2 1 1 1
Second lift 1 4 1 1 0 0
Control Room
Particular (Equipment)
Columns
Total Excavation
25 10
PCC
8
Raft
8
First lift
0
Second lift 0