Window Schedule Family and Head Type Count Height Double 2 7' - 0" Hung with Trim: 36"

x 48" Double 3 7' - 0" Hung: 36" x 48" Double 2 7' - 6" Hung: 36" x 72" Transom 1 9' - 1" with Trim: 36" x 24"

Sill Height 3' - 0"

3' - 0"

1' - 6"

7' - 1"

Area Schedule (Rentable) Name Area Perimeter Level 1/2 BATH 39 SF 24' - 9 1/2" Level 1 HALLWAY 72 SF 42' - 11 1/2" Level 1 FULL BATH 78 SF 35' - 0 5/8" Level 1 BEDROOM 117 SF 44' - 7 1/2" Level 1 1 BEDROOM 118 SF 42' - 9 1/2" Level 1 2 MASTER 140 SF 47' - 2 5/8" Level 1 BEDROOM KITCHEN 212 SF 58' - 5 1/2" Level 1 GARAGE 217 SF 58' - 5 1/2" Level 1 LIVING 236 SF 70' - 7 1/2" Level 1 ROOM

Door Schedule Family and Type Count Bifold-4 4 Panel: 48" x 84" Overhead- 1 Rolling: 8' x 6'-6" Single-Flus 5 h: 36" x 84" Single-Pan 2 el 1: 36" x 84"

Name TOTAL AREA

Area Schedule (Gross Building) Area Perimeter Level 1289 SF 154' - 3 1/2" Level 1

FULL BATH 1/2 BATH 78 SF BEDROOM 1 117 SF HALLW AY 72 SF MASTER BEDROOM 140 SF 39 SF GARAGE 217 SF

BEDROOM 2 118 SF

KITCHEN 212 SF

LIVING ROOM 236 SF

Level 1 3/32" = 1'-0"

www.autodesk.com/revit

SCHEDULES DANIEL Project number Project Number VARGAS Date 11/12/2012 HFH PROJECT Drawn by DANIEL STANELLE
Checked by

A101

MRS. MOON Scale 3/32" = 1'-0" 11/14/2012 11:33:38 AM

41' - 9 7/16"

FULL BATH
60 SF

1/2 BATH
36 SF

BEDROOM 1
103 SF

CLOSET
7 SF

CLOSET
12 SF

HALLWAY
67 SF

GARAGE
213 SF

MASTER BED

32' - 0"

134 SF

BEDROOM 2
105 SF

CLOSET
7 SF

KITCHEN
207 SF

LIVING ROOM
211 SF

CLOSET
20 SF

38' - 0"

Level 1 1/8" = 1'-0"

www.autodesk.com/revit

FLOOR PLAN DANIEL Project number Project Number VARGAS Date 11/12/2012 HFH PROJECT Drawn by DANIEL STANELLE
Checked by

A102
1/8" = 1'-0"

MRS. MOON Scale

11/14/2012 11:33:39 AM

North 3/32" = 1'-0"

Level 2 10' - 0"

Level 1 0' - 0" 4 West 3/32" = 1'-0" 1 East 3/32" = 1'-0"

South 3/32" = 1'-0"

www.autodesk.com/revit

ELEVATIONS DANIEL Project number Project Number VARGAS Date 11/12/2012 HFH PROJECT Drawn by DANIEL STANELLE
Checked by

A103

MRS. MOON Scale 3/32" = 1'-0" 11/14/2012 11:33:40 AM

RENDERING 1 12" = 1'-0"

CAMERA SHOT 1

CAMERA SHOT 2

www.autodesk.com/revit

RENDERINGS DANIEL Project number Project Number VARGAS Date 11/12/2012 HFH PROJECT Drawn by DANIEL STANELLE
Checked by

A104
12" = 1'-0"

MRS. MOON Scale

11/14/2012 11:33:43 AM

UTILITY POLE

ZONING
UT MANHOLE COVER W FRONT SETBACK SIDE SETBACK REAR S ETBACK ADJACENT MAX HEIGHT

UT SW STORM WATER DRAIN SW

UT

SS

SW

26' ASPHALT PAVEMENT

SW

OE

UT

MAPLE STREET
CONCRET E WALK CONCRET E WALK ALL SIDEWALKS 5'-0" WIDE

25' 25' 10' 20' (4 STORIES)

BENCH MARKS
BM 1 STEEL ROD ELEV. 767.81

UF G

SW

LEGEND
SW OE OE G ASPHALT ALLEY 16.5' UF SW G W UT UF SS OE STORM WATER SEW ER LINE UNERGROUND GAS LINE UNDERGROUND WATER LINE UNDERGROUND TELEPHONE LINES UNDERGROUND FIBER OPTIC LINES SANITARY SEWER LINES OVERHE AD ELECTRIC LINES FIRE HYDRANT UF UTILITY POLE MANHOLE COVER

10TH STREET

CONCRETE WALK

25' BUILDING LINE

SS

40' ASPHALT PAVEMENT

WM

MAP

CONCRETE WALK

OE G

SW

WM

STORM DRAIN

OE UF

WM SW

WATER METER

SW

FIRE HYDRANT

UF

OE SW 767.81 BENCH MARCH STEEL ROD

OE

OE SW

ASPH ALT ALLEY 16.5' STORM WATER DRAIN UF G

1 HABITAT FOR HUMANITY SITE 1" = 30'-0"


No. Description Date
11/14/2012 11:37:04 AM

DANIEL VARGAS
www.autodesk.com/revit

SITE PLAN
Project number Date Drawn by Checked by Project Number 11/12/2012 DANIEL STANELLE MRS. MOON

HFH PROJECT

A105
Scale 1" = 30'-0"

HOUSE SITE SHOT 6" = 1'-0"

Level 2 10' - 0"

Level 1 0' - 0" 2 SECTION VIEW 1" = 10'-0"

www.autodesk.com/revit

SITE PLAN RENDERINGS DANIEL Project number Project Number VARGAS Date 11/12/2012 A106 HFH PROJECT Drawn by DANIEL STANELLE
Checked by MRS. MOON Scale As indicated 11/14/2012 11:37:04 AM