Download as pdf
Download as pdf
You are on page 1of 1

SWINERTON.

qxd:Layout 1 1/19/09 1:52 PM Page 227

entrance, she adds. In the area between


buildings and surrounding the building, OTHER SWINERTON BUILDERS
Swinerton included 50,000 square feet of
landscape/hardscape, which includes seat- PROJECTS INCLUDE:
ing areas, creating a common place for stu-
dents to congregate, Woo explains. ■ The Accelerated School in Los Angeles
■ University of California Los Angeles southwest housing
Public Project Challenges ■ Palos Verdes Peninsula Center library remediation

Woo says the biggest hurdles on an edu- ■ California State University San Bernadino Campus in Palm Desert

cation project are accelerated schedules and ■ Soka University of America in Aliso Viejo, Calif.

tight budgets during the bidding process. ■ San Diego State University BioScience Center

“It was difficult and challenging to stay ■ Evergreen Library and High Technology Center

within the budget Evergreen Valley College ■ Santa Clara Unified School District Performing Arts Building

established,” she says, “but with valueengi- ■ University of Hawaii Monoa Frear Hall student housing

neering and thorough review, the team was ■ de Young Museum in San Francisco

able to stay within the budget and still ■ San Francisco Museum of Modern Art

meet the college’s required curricula.” ■ Long Beach Public Library, Mark Twain Branch

Swinerton’s time frame for the project ■ Stanford Science and Engineering Quadrangle

was especially expedited because it was the ■ Qualcomm AU and WD

second design firm on the project because ■ Dreamworks Animation Campus

the first failed to deliver within the estab-


lished budget. out approved drawings, building and con- Angeles, Oakland and the Inland Empire,
struction could not commence,” Woo Orange County, San Diego, San Francisco
Crucial Timeline explains. and Santa Clara; other locations include
Another challenge was obtaining Division “With the experience and the relation- Colorado, Hawaii and Washington.
of State Architects (DSA) approvals of the ships the architect maintained with the The company focuses on education,
design documents. “It was crucial to meet DSA, this was possible.” commercial and healthcare projects,
the district’s curriculum schedule, but with- Swinerton has California offices in Los according to Woo. ■

FEBRUARY 2009 ■ WWW.CONSTRUCTION-TODAY.COM ■ 227

You might also like