Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

SPEC NO.

SECTION: VOLUME V PART 1

TCE.5270A-H-112-601

PROJECT INFORMATION

SHEET 1 OF 2

1.0

OWNER/PURCHASER

PROJECT DIRECTOR TATA POWER COMPANY LIMITED MAHARASHTRA PROJECT CELL DHARAVI RECEIVING STATION MATUNGA, MUMBAI 400 019 MAHARASHTRA, INDIA Tel: + 91 22 6666 8151 Fax: + 91 22 6666 8236

2.0

ENGINEERING CONSULTANTS

TCE CONSULTING ENGINEERS LTD, 73/1, ST. MARKS ROAD BANGALORE - 560 001 INDIA. Tel: + 91 80 6622 6000 (Board) Fax: + 91 80 2227 4873

3.0

PROJECT TITLE

BHIRA 100 MW - AUGMENTATION SCHEME INCLUDING MULSHI SUBSTORAGE UTILIZATION SITUATED WITHIN TATA POWER COMPANY, BHIRA HYDRO GENERATING STATION, DISTRICT RAIGAD, 150 KMS FROM MUMBAI, MAHARASHTRA, INDIA ABOUT 30 KM FROM KOLAD ON MUMBAI-GOA NATIONAL HIGH WAY (NH-17) ROHA (40 KM APPROX.) / MUMBAI / PUNE KALYAN 100 KM (APPROX.) ON CENTRAL RAILWAY, KOLAD 30 KM (APPROX.) ON KONKAN RAILWAY MUMBAI / PUNE 100 M Approx.

4.0

LOCATION

5.0

APPROACH ROAD

6.0 7.0

NEAREST TOWN / CITIES NEAREST RAILWAY STATIONS

: :

8.0 9.0 10.0

NEAREST AIRPORTS ELEVATION ABOVE SEA LEVEL AMBIENT AIR TEMPARATURE

: : :

ISSUE P0 TCE FORM 329 R3

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION
SPEC NO.

SECTION: VOLUME V PART 1

TCE.5270A-H-112-601

PROJECT INFORMATION

SHEET 2 OF 2

(a) Maximum (b) Minimum (c) Design temperature for Elect. Equipment 11.0 12.0 13.0 14.0 RELATIVE HUMIDITY RAINFALL ENVIRONMENT SEISMIC COEFFICIENT

: : : : : : :

480 C 0 10 C 0 50 C 100% during monsoon 6200 mm (maximum yearly) Moderately polluted atmosphere 0.04 g (IS 1893 1975)

ISSUE P0 TCE FORM 329 R3

You might also like