Professional Documents
Culture Documents
The Tata Power Company Limited Bhira 100 MW - Augmentation Scheme Including Mulshi Lake Sub-Storage Utilization Project Information
The Tata Power Company Limited Bhira 100 MW - Augmentation Scheme Including Mulshi Lake Sub-Storage Utilization Project Information
SPEC NO.
TCE.5270A-H-112-601
PROJECT INFORMATION
SHEET 1 OF 2
1.0
OWNER/PURCHASER
PROJECT DIRECTOR TATA POWER COMPANY LIMITED MAHARASHTRA PROJECT CELL DHARAVI RECEIVING STATION MATUNGA, MUMBAI 400 019 MAHARASHTRA, INDIA Tel: + 91 22 6666 8151 Fax: + 91 22 6666 8236
2.0
ENGINEERING CONSULTANTS
TCE CONSULTING ENGINEERS LTD, 73/1, ST. MARKS ROAD BANGALORE - 560 001 INDIA. Tel: + 91 80 6622 6000 (Board) Fax: + 91 80 2227 4873
3.0
PROJECT TITLE
BHIRA 100 MW - AUGMENTATION SCHEME INCLUDING MULSHI SUBSTORAGE UTILIZATION SITUATED WITHIN TATA POWER COMPANY, BHIRA HYDRO GENERATING STATION, DISTRICT RAIGAD, 150 KMS FROM MUMBAI, MAHARASHTRA, INDIA ABOUT 30 KM FROM KOLAD ON MUMBAI-GOA NATIONAL HIGH WAY (NH-17) ROHA (40 KM APPROX.) / MUMBAI / PUNE KALYAN 100 KM (APPROX.) ON CENTRAL RAILWAY, KOLAD 30 KM (APPROX.) ON KONKAN RAILWAY MUMBAI / PUNE 100 M Approx.
4.0
LOCATION
5.0
APPROACH ROAD
6.0 7.0
: :
: : :
THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION
SPEC NO.
TCE.5270A-H-112-601
PROJECT INFORMATION
SHEET 2 OF 2
(a) Maximum (b) Minimum (c) Design temperature for Elect. Equipment 11.0 12.0 13.0 14.0 RELATIVE HUMIDITY RAINFALL ENVIRONMENT SEISMIC COEFFICIENT
: : : : : : :
480 C 0 10 C 0 50 C 100% during monsoon 6200 mm (maximum yearly) Moderately polluted atmosphere 0.04 g (IS 1893 1975)