INSPECTION RELEASE CERTIFICATE

PROJECT : PENINGKATAN FLEKSIBILITAS OPERASI NPU RU VI BALONGAN

EQUIPMENT NAME / Tag No.

31-E-111 A

THE ABOVE EQUIPMENT HAS BEEN SUPPLIED, ERECTED, AND INTENALLY FITTED IN ACCORDANCE WITH THE APPLICABLE DRAWINGS, SPECIFICATIONS AND MANUFACTURER'S STANDARD AND IT IS CERTIFIED TO BE MECHANICALLY ACCEPTABLE. EQUIPMENT HAS BEEN INSPECTED FOR CLEANLINESS AND FREE ALL DEBRIS, SUSTAINS AN FOREIGN MATERIALS. AUTHORIZATION IS HEREBY GUARRANTE THE EQUIPMENT ACCEPTED TO EFFECT FINAL CLOSING OF THIS EQUIPMENT.

Sub-Contractor Print Name Signature

Konsorsium KE - SBS

PT. Pe

Date

Form No

: 4030-G-05

Date of Insp : 02-Oct-2009 Report No. : 4030-G-05-31-xxx Doc. No. :

Project No. : 4047