Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

116

THE GAZETTE OF INDIA: EXTRAORDINARY

[PART III SEC.4]

FORMAT-3
PERIODICITY- ANNUAL DATA OF YEAR : 2020 SUBMISSION-BY 30TH JUNE

DISTRIBUTION OF ELECTRICITY Figs. in MkWh Name & Address of the DISCOM/SEB/ED/Licensee : 1. Electrical Energy imported from : (a) Within the State/UT/System (b) Captive power plants( from within or outside the State/UT/System) (c) Central generating stations (Station-wise) (d) Outside the State/UT/System(from within the country) (e) Outside the country Total Electrical Energy Imported (1a+1b+1c+1d+1e) Electrical Energy sold to : (a) Directly to consumers within the State/UT/System(Area of operation) (b) Licensees within the State/UT/system- furnish break-up licensee wise (c) Any other entity within the State/UT/System-furnish break-up entity wise Total electrical energy sold (3a+3b+3c)

2. 3.

4.

You might also like