For Tender Purpose Only Preliminary Alternate Scheme: SILO-1 Intermediate SILO-2 Intermediate

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8

INTERMEDIATE SILO-1

INTERMEDIATE SILO-2

FOR TENDER PURPOSE ONLY PRELIMINARY ALTERNATE SCHEME

FEEDING ARRANGEMENT

FEEDING ARRANGEMENT

FEEDING ARRANGEMENT

FEEDING ARRANGEMENT

AGITATOR TANK

AGITATOR TANK

AGITATOR TANK

TO DRAIN

TO DRAIN

TO DRAIN

TO ASH POND AREA

FROM LP WATER

B
CLIENT:

M/S TOSHIBA THERMAL AND HYDRO POWER SYSTEM


PROJECT

2X850 MW THERMAL POWER PLANT


AT ANGUL (ODISHA)

SHEET 6 OF 6
LEGEND:SLURRY ASH LINE H.P. WATER LINE L.P. WATER LINE SEAL WATER LINE COOLING WATER LINE INST. AIR LINE SAFETY VALVE NON RETURN VALVE PLUG VALVE
S

SOLENOID OPERATED VALVE BUTTERFLY VALVE (CYL. OPERATED) BUTTERFLY VALVE (MANUALLY OPERATED) GLOBE VALVE (NORMALLY OPEN) GLOBE VALVE (NORMALLY CLOSED) GATE VALVE (NORMALLY OPEN) GATE VALVE (NORMALLY CLOSED) KNIFE GATE VALVE (MANUALLY OPERATED) KNIFE GATE VALVE (CYL. OPERATED) BALL VALVE (NORMALLY CLOSED)

BALL VALVE (NORMALLY OPEN) ORIFICE PLATE "Y" TYPE STRAINER WIRE MESH STRAINER PRESSURE INDICATOR PRESSURE SWITCH LEVEL SWITCH

MACAWBER BEEKAY PRIVATE LIMITED


MACAWBER

NEW DELHI

A
REF. DRG. No.

DESIGNED DRAWN CHECKED

VKS Hariom VKS RL


SCALE DATE

FLOW DIAGRAM
(FOR HCSD SYSTEM)
DRG No.

R.No.

DATE

DESCRIPTION

BY

CHKD. APPD.

REVISIONS

NTS

07.12.11

MB/P-5610/079678
1

REV.

H:\HARIOM 2011\TENDER\5700