Process Systems Process System - Introduction: System Levels in Ore / Minerals Processing
Process Systems Process System - Introduction: System Levels in Ore / Minerals Processing
Crushing
Grinding
Separation
Thickening
Filtration
Complete systems
Crushing
Screening
Conveying
Product systems
Crushers Screens Conveyors
Products
Process System
Process systems
Process Systems
7:5
4:2
Crushing II, III or IV
Closed II
3:8
Crushing Scalping Screening
3:3
Open
4:2
Washing
5:1
4:6
Sedimentation Sand Product screening
6:2
Filtration
To slurry circuit
4:2
6:19
Process System
4:2
5:1
Classifiying
5:1
Washing (Log washer)
4:6
Sandtrap
5:1
To sand module To slurry handling Slurry module
= option or alternative
7:5
Process Systems
3:3
4:2
Primary grinding
Secondary grinding
Classification
Tertiary grinding
3:13
3:3
4:6
3:13
Enrichment module
Wet Tailings Primary separation
Upgrading module
Sedimentation
Sedimentation
5:5
Secondary separaton
6:2
6:2
Dewatering
5:5
Final separation
Tailings dry
Tailings disposal
6:2
Drying
5:5
6:47
Dry conc.
Dry tailings
Conc.
= option or alternative
7:5
Process System
Process Systems
Feeder (Grizzly)
Primary crusher
7:6
Scalping
3:3
Screen 18 mm
4:2
Secondary crusher
3:8
Screen 35 - 64 mm
4:2
0 - 18 mm
0 - 35 mm
Washing screen
Wash water
5:2
Slurry handling
5:4
Chips & fines
RW-ballast
Washing module
Feeder (Grizzly)
7:6
Scalping
Primary crusher
Screen
3:3
Secondary crusher
Screen
4:2
3:8
4:2
Process System
Tertiary crusher
3:10
4:2
0 - 2 mm
4:2
12 - 16 mm 16 - 22 mm + 22 mm
2 - 4 mm 4 - 8 mm 8 - 12 mm
7:5
Process Systems
ROM
Primary crushing
Secondary crushing
Screening
3:3
3:8
4:2
Primary grinding
3:13
Secondary grinding
Classification
3:13
4:6
Spiral/Cyclone
Gyr. jaw
Cone
Ball, Pebble
HGMS
Sedimentation
5:24
Fe Apatite removal conc.
5:31
Fe conc.
6:3
Conventional.
Tailing disposal
Flotation
Flotation
Sedimentation
5:13
Fe conc. final
Dewatering
5:18
Fe conc. final
6:11
Inclined plate
6:30
Pressure filtration
Apatite conc.
Conventional
Sedimentation
6:2
Sedimentation
6:2
Dewatering
Pressure filtration
Dewatering
6:30
6:30
Pelletizing (optional)
6:55
Iron conc.
ROM
Primary crushing
Secondary crushing
Screening
3:3
3:8
Cone
4:2
Primary grinding
Secondary grinding
Classification
3:13
AG, SAG, Rod
3:13
Ball, Pebble
4:6
Spiral/Cyclone
Gyr. jaw
Primary Cu flot.
5:13
Fe conc.
Primary Pb flot.
Regrind
5:13
Regrind
Fe conc. final
5:13
Regrind Sedimentation
Final flotation
3:13
Final flotation
5:17
Conventional
3:13
Final flotation
6:3
Tailings disposal
Conventional
Sedimentation
5:13
Pb conc. final
5:3
Dewatering
Sedimentation
5:13
Zn conc. final
Pressure filtration
6:3
Dewatering
6:30
Cu conc.
Sedimentation
Dewatering
6:30
6:3
Conventional.
Pb conc.
6:30
Pressure filtration
Pressure filtration
Zn conc.
= option or alternative
Process System
3:13
Primary Zn flot
Process Systems
ROM
Primary crushing
Secondary crushing
Screening
3:3
3:8
4:2
Primary grinding
3:13
Secondary grinding
Classification
3:13
4:6
Spiral/Cyclone
Gyr. jaw
Cone
Ball, Pebble
Gravity separation
5:8
Recovery by flotation
Primary flot.
Tailings
5:13
Sedimentation Regrind
Leaching stages
6:3
5:43
Mixers
3:13
Disposal
Final flot.
Adsorption stages
5:13
Conc. final
5:43
Mixers
Tailings
Sedimentation
Dewatering
Sedimentation
Dewatering
Final tailings
6:3
6:30
Pressure filter Gold contained in bulk concentre
6:11
Inclined plate
6:23
Media Screen
Sizing Screen
12 - 125 mm
5:6
5:12
4:2
0 - 12 mm
Sink
Media Screen
Coarse tailings
5:12
Heavy media recovery
Dewatering Screen
0.5 - 12 mm
6:21
- 0.5 mm
Process System
Recycle water
Fine tailings
Flotation
5:13
Sedimentation
- 0.5 clean coal
Dewatering
6:3
Tailings
6:23
Vacuum filter
Drying
6:48
Indirect
- 0.5 mm
= option or alternative
7:5
Process Systems
ROM
Primary crushing
3:3
Secondary crushing
Screening
3:8
4:2
15 30 mm
2 - 6 mm
Grinding
Classifying
3:3
AG, SAG, Ball, Rod VTM, SAM; VBM
4:17
Jaw
Wet processing
Grinding tumbling
3:13
3:13
Classification
4:6
Classification
4:17
Magnetic Sep. HGMS
Fe rejects
Flotation
Magnetic separation
Fe rejects
5:31
5:13
Other rejects
5:28
Optional
Sedimentation
5:3
Dewatering
6:38
Tube press
Primary crushing
3:3
Jaw
Secondary crushing
Screening
Grinding
Screening
3:8
3:2
Dry processing
3:13
AG, SAG, Rod, Ball
3:2
Cone
-750 micron
4:6
5:3
Slime -100 micron Iron removal Fe, Al, Cr bearing with minerals Reject water
Dewatering
6:21
Sedimentation
6:3
Tilings disposal
= option or alternative
7:5
Process System
4:6
5:22
5:13
Process Systems
Primary crushing
Scrubber
Screen
3:3
5:3
Tumbling
4:2
Secondary crusher
3:8
Jaw
Cone
Screen
Diamond sorting
Sink
2-3%
5:12
Float
Screen
5:10
5:12
After treatment
Drying
6:48
Screen Magnetic separation
Iron reject Fines 1-6 mm Non iron reject
4:12
Recrushing VSI
5:22
X-ray separation
3:10
Dry mining
Scrubbing (blunging)
5:3
Classification spiral
4:6
Classification cyclones
Thickening
4:6
6:2
Coarse waste sand, mica a.o. Medium waste sand, mica a.o.
Fine waste
Flotation
Process System
5:13
3:17
6:38
Products:
17% H2O
= option or alternative
7:5
Process Systems
Mobile Systems
In modern quarrying, mining, tunnelling and recycling operations the use of mobile process systems is increasing dramatically. Particularly at rock front operations the technique of moving the process equipment closer to the front end using mobile crushing and screening units in many cases gives remarkable cost savings. These mobile units represent one or more complete machine functions including materials handling, power supply etc. Advanced process control secures the intelligence of the system.
Key arguments for mobile equipment vs stationary equipment and damp truck haulage are:
Process System
Less hauling less costs Less front road maintenance Less exhaust gas and dust emissions Improved working safety Improved flexibility
Process Systems
Max feed/product size mm (in) 670 / 250 (26/10) 800 / 300 (31/12) 900 / 350 (35/14) 1040/ 400 (41/16)
*LT110 refers to Jaw crusher type C110, LT125 to Jaw crusher type C125 etc. see further section 3.
Process System
*LT 1415 refers to Impact crusher type NP1415, LT 1620 to Impact crusher type NP1620 etc. see further section 3.
Process Systems
1 5 2 3 4
2. Grinding unit
Grinding mill (ball or rod), pump and hydrocyclone Weight app. 25 ton, transportation measures W= 3,0m, H= 3,8m
Rougher, scavenger and cleaner cells together with conditioners, reagent feeding systems and air blower. Weight app.14ton, transportation measures W= 2,5m, H= 4.2m Units for leaching and gravity separation (dense media, tables and spirals) also available
4.Dewatering unit
Compact sedimentation (lamella unit) and vacuum filter with auxiliary equipment
5. Power unit
Diesel driven generator including connection terminal Transportation measures W= 2,5m, H= 3.8m BASICS IN MINERAL PROCESSING
Chap 11 Process System.p65 11
Process Systems
Process System