Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

CONCLUSION

In conclusion, this work can determine the level and slope of the most suitable and economical where land is to be executed in longitudinal section and provide information on any point along the section of the total amount of excavation or fill. Next, recording the place where no dredging and filling the land. In addition, transverse sections to determine the most appropriate level and economy in which land is to be done within the transverse. After that, it provides information to calculate the position, height and calculate the slope of any reclamation and earthworks quantities for the purpose of cost and appropriate provision for the land. Therefore, the transverse sections is set to normal, it is perpendicular to the longitudinal section. Supposing the transverse sections taken perpendicular to the sectional not longitudinal, the angle must be measured so that it can be shown in plan. Furthermore, the principles used in selecting the contour interval or distance is to use plan that being used, scale plan, the costs involved, and natural form of terrain.Lastly, the main objective is so that the students can learn the process of setting up and adjust levelling tool and by doing this we will be able to know how to use leveling devices and methods of computation.

REFERENCE

http://azlanppd.tripod.com/t4c1005.pdf http://www.engineeringsurveyor.com/shr3k/pdf/engsurv.pdf http://www.scribd.com/doc/52403048 http://en.wikipedia.org/wiki/Surveying http://www.civilprojectsonline.com/category/surveying-and-levelling/

You might also like