Raw Material Warehouse West Locker Canteen
Raw Material Warehouse West Locker Canteen
Cable tags for panelboards 4. Update on SF-4-RW shop drawing 5. ADDITIONAL VENT EQUIP. 6. ADDITIONAL WORKS
WEST LOCKER 1. Pump room shop drawing 2. As built drawings for panelboards 3. Cable tags for panelboards 4. Switches for EF-1-LR 5. Painting of raceway beside M-3 6. WAC-ACCU shop drawing 7. WAC-ACCU LABEL 8. MEGGER TEST 9. ADDITIONAL WORKS
CANTEEN
CANTEEN 1. As built drawings for panelboards 2. Cable tag for panelboards 3. Estimation of TF Wires for KEF and KSF 4. Estimation of Neutral Conductors(L) 5. Electric water heater shop drawing 6. EF in dry stock room update drawing 7. MEGGER TEST 8. ADDITIONAL WORKS
EAST LOCKER 1. Tap to lighting vent equip. approval 2. WAC-ACCU shop drawing 3. Electric Water Heater shop drawings 4. Booster Pump Shop drawings 5. ADDITIONAL WORKS