RAW MATERIAL WAREHOUSE 1. Motorized valve shop drawing 2. As built drawings for panelboards 3.

Cable tags for panelboards 4. Update on SF-4-RW shop drawing 5. ADDITIONAL VENT EQUIP. 6. ADDITIONAL WORKS

WEST LOCKER 1. Pump room shop drawing 2. As built drawings for panelboards 3. Cable tags for panelboards 4. Switches for EF-1-LR 5. Painting of raceway beside M-3 6. WAC-ACCU shop drawing 7. WAC-ACCU LABEL 8. MEGGER TEST 9. ADDITIONAL WORKS

CANTEEN

1. As built drawings for panelboa 2. Cable tag for panelboards

3. Estimation of TF Wires for KEF

4. Estimation of Neutral Conduct

5. Electric water heater shop dra

6. EF in dry stock room update dr 7. MEGGER TEST 8. ADDITIONAL WORKS

CANTEEN 1. As built drawings for panelboards 2. Cable tag for panelboards 3. Estimation of TF Wires for KEF and KSF 4. Estimation of Neutral Conductors(L) 5. Electric water heater shop drawing 6. EF in dry stock room update drawing 7. MEGGER TEST 8. ADDITIONAL WORKS

EAST LOCKER 1. Tap to lighting vent equip. approval 2. WAC-ACCU shop drawing 3. Electric Water Heater shop drawings 4. Booster Pump Shop drawings 5. ADDITIONAL WORKS