PROJECT:
S08139 - Al Haramain High Speed Rail Phase 1, Package 1
EMPLOYER:
ENGINEER :
CONTRACTOR :
2. INSPECTION TIME :
DATE : Road
Second
Drawing No.
4. INSPECTION :
5. DESCRIPTION OF WORKS :
Inspection of Reinforcing Steel Bars for Part 10 RHS Retaining Wall at Underpass 433+387
6. The works involve the following trades (Tick more than one if required) :
Surveying Architectural Civil Electrical Mechanical Others (specify)
7. INSPECTION REPORT :
Surveyor
Approved
Approved as Noted
Rejected
DATE :
Approval shall not relieve the Contractor of his liabilities under the Contract or constitute authorization of any change to the Contract Documents