Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

IT Systems Incident/Problem Report

1. Incident/Problem Details
Reference No. Reported Date/Time Reported By Affected User Location (Area/Site/Building) Resolution Due Date/Time Type of Problem Incident/Problem Description/Impact 1 9/6/2008 12:00 PM IT System Operations Area 9/6/2008 1:30 PM Status Occurrence Date/Time Affected User Urgency Closed Date/Time
(Open, Assigned/ Pending/ Closed)

Closed 9/6/2008 12:00 PM All Users


(Critical/High/ Medium/ Low)

Critical 9/6/2008 1:30 PM

(Software System/Application, Hardware, Communications, Procedures) Hardware AC Power Failure at DS8100 System Storage

2. Incident/Problem Resolution Details


System Name/ Serial No. Assigned IT Specialist (s) Resolution Actions IBM System Storage DS8100 / 75-DGXV0 Hisham Mohy 1. Ensure AC Power properly restored. 2. Check Serviceable Events. 3- Run System Self Test. 4- Power On DS8100 System & Clustered Partitions Consecutively. Priority
(Critical/High/Medium/Low) Critical

Technical Desk Name Hisham Mohy Signature

Problem Management Name Mahmoud Fouad Baher Soliman Signature

ITG 195-EE-06

You might also like