Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ProposedGroundstabilityalongadjacentlandplot60and61priortoDwallconstruction

1)figure1showunstableandsoilcollapseduringdwallexcavation
approximate106.00mRL

Proposal.1350mmlowstrengthreplacementgroutpileusingmicropilemethod Proposal.2installsheetpilewallminimum7.0mlengthbehindguidewallbeforedwallexcavation(sheetpilewallwillbe install8msectionbehindtheexcavationpanelonly) Proposal.3InstallDSMwall(minimumstrength500kpa)tostrengtheningunstablesoilalongPlot60and61. Proposal.4BackfillwithLSStype.1whenencounteredsoilcollapseduringdiaphragmwallexcavation.


approximate106.00mRL

1.0m

1.05m

waterpiperunningalongbasementwall

1.0m

Plot.60or61

compactbackfilledsoil basementwall Soilcollapsezoneduringdwallexacation Unstablesoilduringdwallexcavation

Plot.60or61

approximate99.35mRL

OriginalConsolidatedsoil

approximate99.35mRL

APPLICATION 1 PROPOSAL.1
2.COULDINSTALLWITHINAVAILABLESPACETOSTABLIZETHESOIL

ADVANTAGES
1.NODISTURBANCETOADJACENTSTRUCTUREANDUNDERGROUNDSERVICES 3.NOCEMENTCONTAMINATIONTOBENTONITESLURRYDURINGDWALLEXCAVATION 4.ALLCONSTRUCTIONEQUIPMENTANDSIZEARESUITABLETOUSEATCONGESTEDAREA.

basementwall DISADVANTAGES
1.NEEDSOMETIMETOWAITFORADJACENTPILETOINSTALLASGROUTNEEDTIMEFORSETTING. 2.DIFFICULTTOOVERCOMEIFTHEREISANYANYUNDERGROUNDOBSTACLEOROBSTRUCTION. 1.DWALLEXCAVATIONWILLBEDIFFICULTIFSHEETPILEENCROACHINGTOWARDDWALLTRENCH. 2.SHEETPILESANDITSINSTALLATIONEQUIPMENTSARENEEDTILLALLDWALLPANELCOMPELETIONALONGPLOT60AND61 3.ALWAYSNEEDTPOEXTRACTSHEETPILEIMEDIATELYAFTERCOMPLETIONOFPANELCASTING 1.NEEDLARGERAREATHANOTHERPROPOSAL 2.COSTWILLBEHIGHERTHANOTHERPROPOSALASALLDSMRIGANDEQUIPMENTAREHEAVYDUTY. 3.CEMENTGROUTCOULDCONTAMINATETHEDWALLBENTONITESLURRYANDLOSTITSPROPERTIESDURINGEXCAVATION. 4.COULDDAMAGETOEXISTINGWATERPIPEASDSMMIXINGAUGERSIZEISLARGEDIAMETER. 1.CEMENTCONTAINEDINTHEL.SSCOULDCONTAMINATEANDEFFECTDWALLBENTONITESLURRY. 2.UNSTABLESOILSTILLCOULDCOLLASPEAGAINWHENSTARTRETRENCHINGOFDWALLALTHOUGHBACFILLEDWITHL.SSCOMPLETED. 3.UNCERTAINCONDITIONFORSTABLITYOFREMAININGUNCOLAPSESOIL.

PROPOSAL.2

1.SHEETPILECOULDBERETRACTABLEANDREUSABLEFROMONELOCATIONTOANOTHERLOCATION 2.ONLYTEMPORARYSTYRUCTURE.COULDREMOVEANDCLEARAFTERCOMPLETIONOFTHEWORK 3.COULDINSTALLWITHINTHELIMITEDAREA,NODISTURBANCETOADJACENTBUILDINGANDSTRUCTURE. 4.NOCEMENTCONTAMINATIONTOBENTONITESLURRYDURINGDWALLEXCAVATION

PROPOSAL.3

1.COULDSTRENGTHENINGTHEUNSTABLESOILEFFECTIVELYANDCOVERLARGEAREA. 2.DSMMETHODISLOWPRESSUREMECHANICALGROUTING,SOTHATNODISTURBANCETHEADJACENTBUILDINGANDSTRUCTUREIFTHEREISENOUGH SPACETOINSTALLMINIMUMREQUIREDAREA

PROPOSAL.4

1.NoNECESSARYTOWAITFORSTRENGTHENINGWORKBEFOREDWALLEXCAVATION. 2.BACKFILLINGWITHL.S.SCOULDBEDONEPROGRESSSIVELYANDALTERNATELYDURINGDWALLCONSTRUCTION.

You might also like