HTTP://WWW - Scribd.com/doc/83144676/guideline For Design of Small Hydro Power Plants#page 80

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

CHAPTER-1

INTRODUCTION
1.1

GENERAL..1-1

1.2

NEED FOR THE PROJECT...1-1

1.3

OBJECTIVES OF THE STUDY.1-6

1.4

STAGES IN AN EIA STUDY .1-7

1.5

METHODOLOGY ADOPTED FOR THE CEIA STUDY1-9

1.6

OUTLINE OF THE REPORT...1-24

CHAPTER-2
INSTITUTIONAL AND LEGAL FRAMEWORK
2.1

INTRODUCTION....2-1

2.2

NATIONAL ENVIRONMENT COMMISSION (NEC).2-4

2.3

EIA GUIDELINES...2-5

2.4

EA PROCESS IN BHUTAN..2-7

2.5

BHUTAN SUSTAINABLE HYDROPOWER DEVELOPMENT POLICY 2008.2-11

2.6

DEPARTMENT OF ENERGY.2-12

CHAPTER-3
PROJECT DESCRIPTION
3.1

GENERAL..3-1

3.2

PROJECT ALTERNATIVE STUDIES...3-1

3.3

DESCRIPTION OF PROJECT COMPONENTS . 3-11

3.4

SALIENT FEATURES ..3-13

3.5

INFRASTUCTURE ..3-17

3.6

LAND REQUIREMENT ...3-22

3.7

CONSTRUCTION MATERIALS....3-23

3.8

MUCK DISPOSAL AREA ..3-26

3.9

OTHER FACILITIES ..3-27

3.10

CONSTRUCTION SCHEDULE ...3-27

CHAPTER-4
GEOLOGY AND SESIMOLOGY OF THE PROJECT AREA
4.1

INTRODUCTION ...4-1

4.2

REGIONAL GEOLOGY ...4-2

4.3

SEISMOTECTONIC FEATURES ..4-5

4.4

LANDSLIDES ...4-9

4.5

SEISMICITY 4-12

CHAPTER-5
HYDROLOGY
5.1

INTRODUCTION .5-1

5.2

RIVER SYSTEM AND BASIN CHARACTERISTICS..5-1

5.3

ASSESSMENT OF SNOW FED AND RAIN FED CATCHMENT AREAS5-2

5.4

WATER AVAILABILITY ...5-2

5.5

RATING CURVE....5-2

5.6

DESIGN FLOOD .5-4

5.7

FLOOD FREQUENCY STUDIES 5-5

5.8

SILT INFLOW RATE .5-6

5.9

SEDIMENTATION ANALYSIS...................................................................5-6

CHAPTER-6
BASELINE SETTING FOR PHYSICO-CHEMICAL AND ECOLOGICAL ASPECTS
6.1

INTRODUCTION ...6-1

6.2

STUDY AREA..6-1

6.3

METEROLOGY..6-1

6.4

SOILS..6-2

6.5

WATER QUALITY..6-4

6.6

LAND USE PATTERN............................................................................6-9

6.7

AMBIENT NOISE LEVEL......6-12

6.8

AMBIENT AIR QUALITY......6-15

6.9

VEGETATION........................................................................................6-19

6.10

WILDLIFE...6-92

6.11

FISHERIES....6-95

6.12

TRAFFIC DENSITY..6-96

CHAPTER-7
PREDICTION OF IMPACTS
7.1

GENERAL..7-1

7.2

IMPACTS ON LAND ENVIRONMENT...7-4

7.3

WATER ENVIRONMENT7-13

7.4

CLIMATE AND AIR ENVIRONMENT...7-19

7.5

IMPACTS ON ECOLOGY...7-27

7.6

INCREASED INCIDENCE OF WATER-RELATED DISEASES.......7-37

7.7

IMPACTS DUE TO BIO-MEDICAL WASTE.7-38

7.8

IMPACTS DUE TO RELEASE OF WATER FOR MEETING DRINKING WATER


REQUIREMENTS.7-41

CHAPTER-8
SOCIO-ECONOMIC AND CULTURAL ASPECTS
8.1

INTRODUCTION..8-1

8.2

OBJECTIVES OF THE STUDY...8-1

8.3

STUDY APPROACH..8-2

8.4

SOCIO-ECONOMIC ASPECTS..8-5

8.5

ACCESS TO SERVICES AND FACILITIES..8-15

8.6

LEVEL OF SOCIAL ORGANIZATION8-18

8.7

ASSESSMENT OF IMPACTS DURING CONSTRUCTION AND OPERATION


PHASE.8-19

8.8

REHABILITATION AND RESETTLEMENT PLAN...8-25

8.9

AREA DEVELOPMENT ACTIVITIES.8-39

8.10

ECOMMENDATIONS FOR SMOOTH AND EFFICIENT REHABILITATION AND


RESETTLEMENT..8-42

8.11

PUBLIC CONSULTATION...8-51

8.12

BUDGET FOR R&R PLAN...8-56

CHAPTER-9
ENVIRONMENTAL MANAGEMENT PLAN
9.1

GENERAL.9-1

9.2

ENVIRONMENTAL MEASURES DURING CONSTRUCTION PHASE.9-2

9.3

COMPENSATION FOR ACQUISITION OF FOREST LAND.9-10

9.4

MAINTENANCE OF WATER QUALITY....9-11

9.5

WILDLIFE CONSERVATION9-12

9.6

WORKERS HEALTH AND SAFETY PLAN....9-14

9.7

CONTROL OF AIR POLLUTION.....9-23

9.8

RESTORATION OF MUCK DISPOSAL SITES.....9-25

9.9

INTEGRATION OF THE WASTE DISPOSAL WITH TORSA RECLAMATION


PLAN9-28

9.10

SUSTENANCE OF RIVERINE FISHERIES..9-30

9.11

NOISE CONTROL MEASURES..9-32

9.12

BIO-MEDICAL WASTE MANAGEMENT....9-34

9.13

ENERGY CONSERVATION MEASURES.9-37

9.14

FLOOD FORECASTING SYSTEM....9-39

9.15

ESTABLISHMENT OF AN ENVIRONMENTAL MANAGEMENT CELL9-41

CHAPTER-10
CATCHMENT AREA TREATMENT PLAN
10.1

NEED FOR CATCHMENT AREA TREATMENT...10-1

10.2

APPROACH FOR THE STUDY....10-2

10.3

ESTIMATION OF SOIL LOSS USING SILT YIELD INDEX (SYI) METHOD10-5

10.4

WATERSHED MANAGEMENT AVAILABLE TECHNIQUES10-7

10.5

CATCHMENT AREA TREATMENT MEASURES..10-9

10.6

COST ESTIMATE10-10

CHAPTER-11
ENVIRONMENTAL MONITORING PROGRAMME
11.2

THE NEED.11-1

11.2

AREAS OF CONCERN11-1

11.3

WATER QUALITY....11-2

11.4

SOIL QUALITY.11-3

11.5

EROSION AND SILTATION..11-4

11.6

ECOLOGY...11-4

11.7

RIVERINE FISHERIES...11-5

11.8

AMBIENT AIR QUALITY AND METEOROLOGY..11-6

11.9

NOISE...11-7

11.10 INCIDENCE OF WATER-RELATED DISEASES...11-7


11.11 LANDUSE PATTERN.11-8
11.12 SUMMARY OF ENVIRONMENTAL MONITORING PROGRAMME.11-8

CHAPTER-12
CLEAN DEVELOPMENT MECHANISM
12.1

INTRODUCTION..12-1

12.2

CDM IN PRESENT SCHEME..12-2

12.3

STEPS INVOLVED IN A CDM PROJECT12-3

12.4

ESTIMATION OF CERS..12-4

12.5

STEPS INVOLVED IN DEVELOPING CDM PROJECT.12-7

12.6

HURDLES IN OBTAINING CERS..12-7

CHAPTER-13
DAM BREAK ANALYSIS
13.1

NEED FOR DAM BREAK STUDY..13-1

13.2

METHODOLOGY... 13-1

13.3

RESULTS OF DAM BREAK MODEL13-7

13.4

CONCLUSIONS..13-8

13.5

DISASTER MANAGEMENT PLAN13-9

CHAPTER-14
COST ESTIMATES
14.1

COST FOR IMPLEMENTING EMP...14-1

14.2

COST FOR IMPLEMENTING ENVIRONMENTAL MONITORING


PROGRAMME..14-1

You might also like