Professional Documents
Culture Documents
Jadwal Terbaru 12 Feb 2013
Jadwal Terbaru 12 Feb 2013
Ruang Kapasitas 07.00 - 07.50 07.50 - 08.40 08.40 - 09.30 09.40 - 10.30 10.30 - 11.20 11.20 - 12.10 12.10 - 13.00 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00
Perenc. Sistem Industri (Sem. 6) A (MA) B (NAW) TTC & PK (Smt. 4) A (SGP)
SENIN
A (LT)
07.00 - 07.50 SisMan (Smt. 4) K3 (EPSK) 07.50 - 08.40 Q (MA/YP) 08.40 - 09.30 A (SW) 09.40 - 10.30 Teknik Pengendalian Kualitas (Smt. Ekotek (Sem. 5) 6) 10.30 - 11.20 11.20 - 12.10 B (HS/PDK) C (PDK/HS) A (IKG/NAW) SELASA 12.10 - 13.00 Pemodelan Sistem (Smt. 6) 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00 07.00 - 07.50 07.50 - 08.40 08.40 - 09.30 09.40 - 10.30 10.30 - 11.20 RABU 11.20 - 12.10 12.10 - 13.00 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00 A (BW) Algoritma dan Pemrograman C B (SEW) C (YAS)
TTC & PK (Smt. 4) Q (ARK) Penelitian Operasional (Smt. 4) B (SEW) Proses Manufaktur B (SB/HS)
Simulasi Sist. Industri (Smt. 6) A (SPN) Penelitian Operasional (Smt. 4) Q (NS) Penelitian Operasional A (SPN) Penelitian Operasional A (SPN) C (SEW) Man. Jasa (PSMI) A (LT)
Strategi Korporasi (PSMI)
A (NAW/IKG)
07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.50 - 10.30 10.30 - 11.20 KAMIS 11.30 - 12.20 12.20 - 13.00 13.10 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.40 - 10.30 10.40 - 11.30 11.30 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 16.10 - 17.00
Man. Material (LSCM) A (SPN) MOSDM (SMT. 6) B (BSY) C (IH) Man. Proyek (Smt. 4) A (LT)
B (DH)
Q (BS)
A (ARK) A
C (IH) C
JUMAT
SHOLAT JUM Algoritma dan Pemrograman (Smt. 2) A Sustainable Mfg (SIsman) Q B A (MA) Responsi Sistem Manufaktur A,B,C,Q
TI-103 35
Komunikasi Bisnis (MB-2)
TI-204 30
Peranc. Sist. Mnfg (Smt. 2 - Sisman)
TI-224 20
Pemodelan Optimasi (Smt. 2 - KOI)
RUANG 208 8
Prod. Mfg (Sisman)
LAB SISMAN
A (MLS/PDK)
A (SGP) SCM (LSCM) A (INP) Kapita Selekta (GS) B (PDK) Perenc. Sistem Industri (Sem. 6) E (BAN) MCDM (KOI) A (USCM)
Komunikasi Pemasaran (MB-6)
A (MLS/MA)
Analisa Keputusan (KOI)
A (BS)
Human Reliability (EPSK)
A (ARK)
Man. Kualitas (Smt. 2 - Sisman)
A (MLS)
A (JG)
A (BSY)
A (IKG)
(Smt. 2 - LSCM)
A (INP/SPN)
A (AR/NS)
Met. Kuantitatif Bisnis (MB-4)
A (JG)
Man. Keuangan (PSMI)
A (IKG/NPN)
Dinamika Organisasi (MB-4)
Makro Ekonomi Man.Pemasaran & Sistem Dinamik Plng (Smt. 2 - PSMI) (MB-2) (KOI) A (NPN) A (BAN) A (BW)
A (IKG)
e-Business (LSCM)
A (SGP/JG)
A (SW)
SHOLAT JUM'AT e-Business Proyek Penciptaan Bisnis (MB-2) (PSMI) A (EW) A (AR)
A (YAS)
S-1 TI (Wajib Smt. 2) S-1 TI (Wajib Smt. 4) S-1 TI (Wajib Smt. 6) S-1 TI (Pilihan) S-1 TI (Penawaran MK di semester gasal)
S1 Man. Bisnis Pasca S-2 (Wajib) Pasca S-2 (Pilihan) Pasca S-3
HARI
Ruang Kapasitas 07.00 - 07.50 07.50 - 08.40 08.40 - 09.30 09.40 - 10.30 10.30 - 11.20 11.20 - 12.10 12.10 - 13.00 12.45 - 13.35 13.35 - 14.25 14.25 - 15.15 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00
Perenc. Sistem Industri (Sem. 6) A (MA) B (NAW) TTC & PK (Smt. 4) A (SGP)
SENIN
A (LT)
07.00 - 07.50 SisMan (Smt. 4) K3 (EPSK) 07.50 - 08.40 Q (MA/YP) 08.40 - 09.30 A (SW) 09.40 - 10.30 Teknik Pengendalian Kualitas (Smt. Ekotek (Sem. 5) 6) 10.30 - 11.20 11.20 - 12.10 B (HS/PDK) C (PDK/HS) A (IKG/NAW) SELASA 12.10 - 13.00 Pemodelan Sistem (Smt. 6) 13.00 - 13.50 13.50 - 14.40 14.40 - 15.30 15.30 - 16.20 16.20 - 17.10 17.10 - 18.00 A (BW) Algoritma dan Pemrograman C B (SEW) C (YAS)
RABU
TTC & PK 07.00 - 07.50 Simulasi Sist. Industri (Smt. 6) (Smt. 4) 07.50 - 08.40 08.40 - 09.30 Q (ARK) A (SPN) C (SEW) B (NS) Six Sigma 09.40 - 10.30 Penelitian Operasional (Smt. 4) Man. Jasa (PSMI) (Sisman) 10.30 - 11.20 11.20 - 12.10 B (SEW) Q (NS) A (LT) A (HS) 12.10 - 13.00 Proses Penelitian Proses Strategi Korporasi 13.00 - 13.50 (PSMI) Manufaktur Operasional Manufaktur 13.50 - 14.40 14.40 - 15.30 B (SB/HS) A (SPN) A (NAW/IKG) C (YP/PDK) Penelitian 15.30 - 16.20 Operasional 16.20 - 17.10 17.10 - 18.00 A (SPN)
07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.50 - 10.30 10.30 - 11.20 KAMIS 11.30 - 12.20 12.20 - 13.10 13.10 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 07.00 - 07.50 07.50 - 08.40 08.50 - 09.40 09.40 - 10.30 10.40 - 11.30 11.30 - 13.30 13.30 - 14.20 14.20 - 15.10 15.10 - 16.00 16.10 - 17.00
Man. Material (LSCM) A (SPN) MOSDM (SMT. 6) B (BSY) C (IH) Man. Proyek (Smt. 4) A (LT)
B (DH)
Q (BS)
A (ARK) A
C (IH) C
JUMAT
SHOLAT JUM Sustainable Mfg Algoritma dan Pemrograman (Smt. 2) (SIsman) A Q B A (MA) Responsi Sistem Manufaktur A,B,C,Q
TI-103 35
Komunikasi Bisnis (MB-2)
TI-204 30
Peranc. Sist. Mnfg (Smt. 2 - Sisman)
TI-224 20
Pemodelan Optimasi (Smt. 2 - KOI)
RUANG 208 8
Prod. Mfg (Sisman)
LAB SISMAN
A (MLS/PDK)
A (SGP) SCM (LSCM) A (INP) Kapita Selekta (GS) B (PDK) Perenc. Sistem Industri (Sem. 6) E (BAN) MCDM (KOI) A (USCM)
Komunikasi Pemasaran (MB-6)
A (MLS/MA)
Analisa Keputusan (KOI)
A (BS)
Human Reliability (EPSK)
A (ARK)
Man. Kualitas (Smt. 2 - Sisman)
A (MLS)
A (JG)
A (BSY)
A (IKG)
(Smt. 2 - LSCM)
A (INP/SPN)
A (AR/NS)
Met. Kuantitatif Bisnis (MB-4)
A (JG)
Man. Keuangan (PSMI)
A (IKG/NPN)
Dinamika Organisasi (MB-4)
Faktor Manusia (Smt. 2 - EPSK) A (SW) Sistem Dinamik Stat. Lanjut (Smt. 1) (Smt. 2 - KOI) A (BS/EW) A (BW)
Makro Ekonomi Man.Pemasaran & Sistem Dinamik Plng (Smt. 2 - PSMI) (MB-2) (KOI) A (NPN) A (BAN) A (BW)
A (IKG)
e-Business (LSCM)
A (SGP/JG)
A (SW)
SHOLAT JUM'AT e-Business Proyek Penciptaan Bisnis (MB-2) (PSMI) A (EW) A (AR)
A (YAS)
S-1 TI (Wajib Smt. 2) S-1 TI (Wajib Smt. 4) S-1 TI (Wajib Smt. 6) S-1 TI (Pilihan) S-1 TI (Penawaran MK di semester gasal)
S1 Man. Bisnis Pasca S-2 (Wajib) Pasca S-2 (Pilihan) Pasca S-3