AW PROCEED / WITH COMMENTS

Authorization to proceed does not relieve Contractor/Supplier of its responsibility or liability under the Contract and or Purchase Order.
By DEVENDRA SHARMA (devendra.sharma@fluor.com) on Feb 15, 2013

Repair Procedure
Client Document No Equipment BASF P O Number 4526147828 G3IR-4-0201-01-00025 Project BASF Dahej 106-V-1104,107-TK-1101.109-V-1101,109-V-1102,119-TK-1101

1. Scope:
repairing of

This procedure describes the work plan for replacing the part of the shell from the wet Air receiver. 2. Responsibilities: The supervisor shall be responsible for total process. The QA/QC inspector is responsible for the checking of tanks condition. 3 Test Procedure:
WPS used for weld build up shall be same as WPS approved for fabrication earlier

The spots where repair is required will be visually verified and marked. DPT shall be performed on the marked spots and if the test fails then the spot will be grinded till the spot is visually cleared and the DPT shall be performed again, if the test fails again then the same procedure shall be performed if the test is cleared then we can move to the next step. Welding using suitable welding electrode will be overlaid on the identified spots. After the welding process is over the spots shall be flush grinded. After the same spot will undergo the DPT. After the DPT is cleared the repair work will be completed.
1) This will be witnessed by the Inspector. 2) Perform thickness measurement around 6" dia. of the spot to record the thickness. This shall be confirmed with the plate thickness.

This shall be done in the presence of Inspector