Dgt801b Gen - Unit A
Dgt801b Gen - Unit A
Dgt801b Gen - Unit A
DATE : 22.09.2012
PAGE 1 of 24
1. NAME PLATE DETAILS: Location Equipment Feeder Name Make Model No. 2. Measurements: : RELAY PANEL ROOM / UNIT - II : DGT801 DIGITAL GENERATOR TRANSFORMER PROTECTION : GENERATOR TRANSFORMER UNIT PROTECTION PANEL-A : GUODIAN NANJING AUTOMATION CO. LTD : DGT801B
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
Channel no. 2 3 4 5 6 7 15 16 17 18 19 20 21 22 23 45 46 47 62 63 34 35 36 37 38 39 43 44 40 41 42 50 51 55 56 57 58 59 60
Injected value
Measured value
PAGE 2 of 24 4.967
4.99A/5.001A 4.989A 0.996A
GT HV side-1
2500/1A
1A
GT HV side-2
2500/1A
1A
UT HV side(I)
2500/5
5A
1A 1A 1A 5A
5A 5A 5A 5A 5A 5A 63.51V
4.974A 5.004A 4.997 4.967A 4.982A 5.004A 4.982A 4.967A 4.967A 63.1V 62.9V 62.7V 63.0V
UT-Branch-B
11KV/110V
63.51V
62.8V 62.7V
52 62.7V Tested by VOLTECH Witness by STEAG ENERGY LTD 400KV/110 53 400KV side 63.51V 62.7V Name:Mr. SHRNIVASAM Name: SURESH PADHY/ALANKA PANDA V Designation: Sr. Protection Engineer Designation: Sr.ENGINEER62.8V 54 Sign: Sign: 8 63.0V Gen. terminal 9 22KV/110V 63.51V 63.1V side 10 62.9V 31 24 Over fluxing 22KV/110V 110V 110V(3Uo) 109.1V 109.836V
PAGE 3 of 24
3. Generator Differential: Rating : 706 MVA CT Ratio : GEN - 25000/5A, GEN Neutral. Side 25000/5A PT Ratio : GEN - 22KV/110 V 3.1. Pickup Test: (i) Phase side: Phases R Y B Set Id 1.48 1.48 1.48 Set Time (sec) 0 0 0 Pickup Current(A) 1.52 1.52 1.52 Optd Time (msec) 39.90 39.90 39.90
(ii) Neutral side: Phases R Y B Set Id 1.48 1.48 1.48 Set Time (sec) 0 0 0 Pickup Current(A) 1.52 1.52 1.52 Optd Time (msec) 38.10 38.10 38.10
(iii) Stability Test: Current In phase Side Current In Neutral Side Relay Status
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 4 of 24
Stable
(iv) SLOPE TEST: Setting : 30% Current In phase Side R- 3.720A 0 Y- 3.720 A -120 B- 3.720 A 120 R- 4.836 A 0 Y- 4.836 A -120 B- 4.836 A 120 Id=0.391:; Current In Relay Status Neutral Side R-5.77 A 180 Id1-2.059 Y-5.77 A 60 Ir1-4.877 B-5.77 A 300 R-7.29 A 180 Id1-2.45 Y-7.29 A 60 Ir1-6.02 B-7.29 A 300 Ires=0.1.152 :; Slope (M)=Id/Ires=33%
3.2. Generator Diff High Set: Phases R Y B Set current(A) 4.0 4.0 4.0 Set Time (sec) 0 0 0 Injected Current(A) 4.0 4.0 4.0 Optd Time ( m sec) 28.00 28.00 28.00
4. Generator Impedance: Phases R Y B Set current(A) 5 A 85 5 A 325 5 A 205 Set Time (sec) 2 2 2 Pickup Voltage (V) 19.50V 85 19.50V -35 19.50V 205 Optd Time (sec) 1.99 1.99 1.99
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 5 of 24
6 Generator Overload: (i) Definite Time: Phase R Y Set Current (A) 4.1 4.1 Set time (sec) 8.0 8.0 8.0 Pickup Value(A) 4.107 4.107 4.107 Operating Time(sec) 8.04 8.04 8.04
Pickup Value(A) 15 15 15
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 6 of 24
Phase R Y B
7. Generator Negative Sequence O.C: (i) Definite Time: Set Current Phase Set time (sec) (A) R Y B (ii) Phase R Y B (iii) Phase R Y B 8. Generator Reverse Power: Set Power (W) -6 Set time (sec) t1 1.5 t2 60 0.4 10.0 0.35 8.0
Inverse Time (High): Set Current Set time (A) (sec) 5.6 0.5
Operated Current (A) 5.650 A 0 5.650 A 120 5.650A -120 Operated Current (A) 0.420 A 0 0.420 A 120 0.420 A -120
9. Generator Low forward Power: Set Power (W) 6 Set time (sec) 1.5 Injected Current & Voltage 0.030A & 110V Operated Power (W) 5.9 Operating Time(Sec) 1.486
10. Generator Directional Power: Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign: Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 7 of 24
11. Start-Stop Protection: Phase R-N Set Voltage (V) 11 Set time (sec) 2.0 Operated Voltage (V) 12.0 Operating Time(Sec) 2.006
12. Generator Over fluxing: (i) Stage1: Set Phase Voltage Set time (sec) (V/f) R-Y 1.1 6.0
(ii) Stage2: Phase R-Y Set Voltage (V/f) 1.3 Set time (sec) 0.5 Pickup Voltage@50Hz 143.72 Operating Time(Sec) 0.576
13. Over frequency: Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120 Set value In Hz 52.0 52.0 52.0 Operated value in (Hz) 52.10 52.10 52.10 Set time (sec) 30 Operated time (sec) 32.21
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 8 of 24
Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120
14. Under frequency: Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120 Set value In Hz 48.0 48.0 48.0 Operated value in (Hz) 47.9 47.9 47.9 Operated value in (Hz) 47.53 47.53 47.53 Operated value in (Hz) 46.95 46.95 46.95 Set time (sec) 5.0 Operated time (sec) 5.03 Set time (sec) 12.30 Operated time (sec) 12.5 Set time (sec) 30.0 Operated time (sec) 30.00
Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120
Voltage Applied (V) Vr-n Vy-n Vb-n 63.5 0 63.5 -120 63.5 +120
3Uol:8V
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 9 of 24
Injected current (A) Injected current 3.5 A 0 (A) 5.0 A -120 3.5 A 0 5.0 A 120 5.0 A -120 5.0 A 120 -
Injected Voltage (V) Injected Voltage 50 V 41 63.5(V) -79 V 50 V 41 63.5 V 161 63.5 V -79 Low 3.1 63.5 V 161 Low 8.0
16. Stator EFP 3U0: Phase R-N(1YH) R-N(YH0) Setting value 3U0gIt-16V & 3U0gIn 9.2V Set time 0.5 Operated value(V) 16 9.20 Operated time(s) 0.509
17.1 Loss of Field (i) T1: Injected Phase Current (A) R 5A 90 Y B 5A 330 5A 210
Phase R Y B
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 10 of 24
(ii) T2: Phase R Y B (iv) T4: Phase R Y B Injected Current (A) 1A 0 1A 240 1A 120 Set time (sec) 0.5 0.5 0.5 Operated Voltage (V) >21 >21 >21 Operating Time(sec) 0.506 0.506 0.506 Injected Voltage(V) 63.5 V 0 63.5 V 120 63.5 V 120 Set time (sec) 2 2 2 Operated Current (A) 3.52 40 <, 140 > 3.52 -80 <, 20 > 3.52 160 <, 260 > Operating Time(sec) 2.061 2.061 2.061
Phase R Y B
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 11 of 24
17.2 Out of step Protection: Phase R Y B Injected Voltage(V) 15 V 0 15 V 240 15 V 120 Injected Current (A) 3.0 A 0 3.0 A 240 3.0 A 120 Operated voltage Angle 320 200 80 Operating Time(sec) 0.11 0.11 0.11
18. Accidental Energizing: (I) PICKUP: Setting Operated Phase Set time Operated time(ms) Current(A) value(mA) R 0.3 0.5 300 512 Y 0.3 0.5 300 512 B 0.3 0.5 300 512 (II) ZONE TEST: Injected Injected Phase Operated time(msec) voltage(V) Current(A) R-N 116 31 0 5 85 Y-N B-N 31 240 31 120 5 -35 5 205 116 116
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 12 of 24
Phases R Y
B 1.576 (ii) Pickup Test:MT HV Side-1 Phases R Y B (iii)Stability: MT Trfr LV Side R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 (iv) SLOPE TEST: MT Trfr LV Side AT Trfr HV Side-1 R-0.433A 0 Y-0.433 A -120 B-0.433 A 120 Set Id 0.17 0.17 0.17
Relay Status
Stable
AT Trfr HV Side-1
Relay Status
R-3.936 A 30 R-0.412 A 0 Y-3.936 A -90 Y-0.412 A -120 B-3.936 A 150 B-0.412 A 120 R-5.04 A 30 R- 0.892 A 0 Y-5.04 A -90 Y- 0.892 A -120 B-5.04 A 150 B-0.892 A 120 Id=2.15:; Ires=4.40:; SLOPE=48% (b) MT LV & MT HV SIDE-2: (i)Pickup Test: MT LV Side:
Relay Stable.
Relay Operated.
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 13 of 24
Phases R Y B
(ii) Pickup Test:MT HV Side-2 Phases R Y B Set Id 0.17 0.17 0.17 Pickup Current(A) 0.17 0.17 0.17 Optd Time (ms) 31.30 31.30 31.30
(iii)Stability: MT Trfr LV Side R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (iv) SLOPE TEST: MT Trfr LV Side AT Trfr HV Side-2 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status
Stable
Tripped
AT Trfr HV Side-2
Relay Status
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 14 of 24
R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 R-3.936 A 30 Y-3.936 A -90 B-3.936 A 150 Id=4.3:;
R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R- 0.882 A 0 Y- 0.882 A -120 B-0.882 A 120 Ires=8.5:; SLOPE=50.58%
Relay Stable.
Relay Operated.
(c) UT HV SIDE & AT HV SIDE-1: (i)Pickup Test: UT HV Side: Phases R Y B Set Id 1.576 1.576 1.576 Pickup Current(A) 1.598 1.598 1.598 Optd Time (ms) 36.10 36.10 36.10
(ii) Pickup Test:MT HV Side-1 Phases R Y B Set Id 0.17 0.17 0.17 Pickup Current(A) 0.168 0.168 0.168 Optd Time (ms) 33.70 33.70 33.70
(iii)Stability:
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 15 of 24
MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (iv) SLOPE TEST: MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 Id=4.4:;
AT Trfr HV Side-1 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120
Relay Status
Stable
Tripped
AT Trfr HV Side-1 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R- 0.884 A 0 Y- 0.884 A -120 B-0.884 A 120 Ires=8.4:; SLOPE=52.3%
Relay Status
Relay Stable.
Relay Operated.
Phases R Y B
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 16 of 24
Phases R Y B
(iii)Stability: MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (iv) SLOPE TEST: MT Trfr LV Side R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 R-3.936 A 210 Y-3.936 A 90 B-3.936 A 330 Id=4.5:; Ires=8.6:; (d) Diff Stage II: Phases R Y B Set Id 5.0 5.0 5.0 AT Trfr HV Side-2 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status
Stable
Tripped
AT Trfr HV Side-2 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 R- 0.892 A 0 Y- 0.892 A -120 B-0.892 A 120 SLOPE=52.32% Injected Current(A) 5.03 5.03 5.03
Relay Status
Relay Stable.
Relay Operated.
Set Time(sec) 0 0 0
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 17 of 24
21. OVERALL DIFFERENTIAL (G-T UNIT DIFFERNTIAL) (a)Gen Neutral side & AT H.V Side-1 (i) Pickup Test: Gen Neutral Side Phases R Y B Set Id 1.48 1.48 1.48 Pickup Current(A) 1.51 1.51 1.51 Optd Time (ms) 35.40 35.40 35.40
(ii)
H.V Side-1 Set Id 0.16 0.16 0.16 Pickup Current(A) 162 162 162 Optd Time (ms) 35.40 35.40 35.40
(iii)
Stability: Gen. Neutral. Side R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 AT HV Side-1 R-0.412 A 150 Y-0.412 A 30 B-0.412 A 270 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status Stable
Tripped
(iv)
Slope: Gen. Neutral. Side R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 AT HV Side-1 R-0.412 A 150 Y-0.412 A 30 B-0.412 A 270 Relay Status Relay Stable.
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 18 of 24
Relay Operated.
(B)Gen Neutral side & AT H.V Side-2 (I)Pickup Test: Gen Neutral Side Phases R Y B Set Id 1.48 1.48 1.48 Pickup Current(A) 1.51 1.51 1.51 Optd Time (ms) 33.40 33.40 33.40
H.V Side-2 Set Id 0.16 0.16 0.16 Pickup Current(A) 162 162 162 Optd Time (ms) 37.80 37.80 37.80
(III)Stability: Gen. Neutral. Side R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 (IV) Slope: Gen. Neutral. Side AT HV Side-1 Relay Status AT HV Side-2 R-0.412 A 150 Y-0.412 A 30 B-0.412 A 270 R-0.412 A 0 Y-0.412 A -120 B-0.412 A 120 Relay Status Stable
Tripped
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 19 of 24
R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 R-3.936 A 0 Y-3.936 A -120 B-3.936 A 120 Id=4.4:;
R-0.412 A 150 Relay Stable. Y-0.412 A 30 B-0.412 A 270 R-0.880 A 150 Relay Operated. Y-0.880 A 30 B-0.880 A 270 Ires=8.6:; SLOPE=51.16%
22. GT Comp V block over Current:(I) Set Time t1 R Y B 0.8 0.8 0.8 0.5 0.5 0.5 Set Voltage(V) U1 U2 (ph-ph) 80 80 80 10 Operatin g Current (A) 0.8 0.8 0.8 Operating Voltage(V) U1 U2 (ph-E) 45.51 45.51 45.51 33.51 63.51 63.51 Optd Time (Sec) t1 0.52 0.52 0.52 t2 79 79 79
Phases
Set I(A)
23. GT Zero Sequence over Current: Set time t11 R-N 10 1.2 t12 1.5 Injected Current(A) 10.02 Operated time(Sec) t11 1.21 t12 1.517
Phase
Set Current(A)
24. GT VENTILATION: Phases R Y B Set Id 2.2 2.2 2.2 Set Time(sec) 1 1 1 Pickup Current(A) 2.2 2.2 2.2 Optd Time (s) 1.037 1.037 1.037
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 20 of 24
25. GT Restricted Earth Fault:(Setting Iq and Ig inter changed) (i) LV Side: Phase N (ii) Set Current(A) 0.1 Neutral Side: Set Current(A) 0.1 Set time 0 Operated value(A) 0.25 Operated time(ms) 42.10 Set time 0 Operated value(A) 0.120 Operated time(ms) 41.0
Phase N
N-0.25 A 0
Tripped
R-0.120A 0 Id=0.13
Tripped
26. Unit Transformer Differential: CT Ratio : HV - 2500/5A, LV Side1&2 3000/5A PT Ratio : HV - 22kV/110 V LV 1&2 11kV/110V
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 21 of 24
(A) UT HV SIDE AND UT LV SIDE-1 (i) HV Side: Phases R Y B Set Id 1.65 1.65 1.65 Set Time(sec) 0 0 0 Pickup Current(A) 1.672 1.672 1.672 Optd Time (ms) 63.0 63.0 63.0
(ii) LV Side-1: Phases R Y B Set Id 2.66 2.66 2.66 Set Time(sec) 0 0 0 Pickup Current(A) 2.69 2.69 2.69 Optd Time (ms) 53.0 53.0 53.0
(iii) Stability: Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 (iv) Slope: Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-8.486 A 0 Y-8.486 A -120 B-8.486 A 120 Id=5 Current in LV Side-1 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Ires=8.6 slope=58.13% Relay Status Stable Current in LV Side-1 R-5.511 A 150 Y-5.511 A 30 B-5.511 A 270 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Relay Status Stable
Tripped
Tripped
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 22 of 24
(B) UT HV SIDE AND UT LV SIDE-2 (i) HV Side: Phases R Y B Set Id 1.65 1.65 1.65 Set Time(sec) 0 0 0 Pickup Current(A) 1.680 1.680 1.680 Optd Time (ms) 59.0 59.0 59.0
(ii) LV Side-2: Set Time(sec) 0 0 0 Pickup Current(A) 2.678 2.678 2.678 Optd Time (ms) 51.0 51.0 51.0
Phases R Y B
(iii) Stability: Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 (iv) Slope: Tested by VOLTECH Name:Mr. SHRNIVASAM Designation: Sr. Protection Engineer Sign: Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign: Current in LV Side-2 R-5.511 A 150 Y-5.511 A 30 B-5.511 A 270 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Relay Status Stable
Tripped
PAGE 23 of 24
Current in HV Side R-3.3 A 0 Y-3.3 A -120 B-3.3 A 120 R-8.368 A 0 Y-8.368 A -120 B-8.368 A 120 Id=4.8 UT Differential High Set: Phases R Y B Set Id 7 7 7
Current in LV Side-2 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 R-5.511 A 0 Y-5.511 A -120 B-5.511 A 120 Ires=8.5 slope=56.47%
Tripped
Set Time(sec) 0 0 0
Pickup Current(A) 7 7 7
27. UT Ventilation: Phases R Y B Set Id 2.2 2.2 2.2 Set Time(sec) 1 1 1 Pickup Current(A) 2.2 2.2 2.2 Optd Time (s) 1.037 1.037 1.037
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 24 of 24
28. UT Overload: Phases R Y B Set Current(A) 3.8 3.8 3.8 Set Time 0.5 0.5 0.5 Pickup Current(A) 3.79 3.79 3.79 Optd Time (Sec) 0.51 0.51 0.51
29. UT Comp V block over Current:(I) Set Voltage(V) U1 (ph-ph) 62 62 62 8 U2 Operatin g Current (A) 4.4 4.4 4.4 Operating Voltage(V) U1 (ph-E) 35.51 35.51 35.51 U2 49.50 63.51 63.51 Optd Time (mSec) t1 709 709 709 t2 709 709 709
Phases
Set I(A)
R Y B
30. UT Comp V block over Current:(II) Set Voltage(V) U1 (ph-ph) 62 62 62 8 U2 Operatin g Current (A) 4.403 4.403 4.403 Operating Voltage(V) U1 (ph-E) 35.71 35.71 35.71 U2 49.50 63.51 63.51 Optd Time (mSec) t1 715 715 715 t2 715 715 715
Phases
Set I(A)
R Y B
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 25 of 24
Phases R Y B
Set Current(A) 11 11 11
32. UT branch-B O/C Inst. & Time Delay: Phases R Y B Set Current(A) 16 16 16 Set Time 0.4 0.4 0.4 Injected Current(A) 16.04 16.04 16.04 Optd Time (Sec) 0.416 0.416 0.416
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 26 of 24
Phases R Y B
Set I(A) 5 5 5
34. UT Branch-B over Current: Phases R Y B Set I(A) 5 5 5 Set Time 1.2 1.2 1.2 Pickup Current(A) 4.98 4.98 4.98 Optd Time (Sec) 1.213 1.213 1.213
35. UT Branch-A Zero Sequence over Current: Phase R-N Set Current(A) 10 Set time t11 1.2 t12 1.5 Injected Current(A) 10.02 Operated time(Sec) t11 1.21 t12 1.517
36. UT Branch-B Zero Sequence over Current: Set Current(A) 10 Set time t11 1.2 t12 1.5 Injected Current(A) 10.01 Operated time(Sec) t11 1.19 t12 1.511
Phase R-N
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 27 of 24
37. UT Branch-A Restricted Earth Fault: (i) LV Side: Set Set Phase Current(A) time N 0.6 0
(ii) Neutral Side: (High impedance) Phase N Set Current(A) 0.6 Set time 0 Operated value(A) 9.67 Operated time(ms) 49.40
R-0.63 A 0
N-9.67 A 0
Tripped
Tripped
Set time 0
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 28 of 24
38. UT Branch-B Restricted Earth Fault: (i).LV Side: Phase N Set Current(A) 0.6 Set time 0 Operated value(A) 0.631 Operated time(ms) 43.70
(ii) Neutral Side: (High impedance) Phase N (iii) Stability: Current In LV phase Side R-0.631 A 0 Current In Neutral Side N-9.602 A 180 Relay Status Stable Set Current(A) 0.6 Set time 0 Operated value(A) 9.602 Operated time(ms) 44.90
N-9.602 A 0
Tripped
Tripped
Set time 0
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 29 of 24
39. Rotor EFP: (I) Single point EFP: Setting value Rg1 8 k 40. TV Wire Break: (i) 22KV: Phases R Y B ( ii) 400KV: Phases R Y B 41. FUNCTIONAL CHECKS: 7.0 Set V(U2) Set Time(Sec) 10.0 10.0 10.0 Operated Value(V) 42.0 63.50 63.50 U2-7.1 10.11 Optd Time (sec) 7.0 Set V(U2) Set Time(Sec) 10.0 10.0 10.0 Operated Value(V) 42.3 63.50 63.50 U2-7.05 10.08 Optd Time (sec) Set time 6.0 Injected value Below 7.89kohm Operated time(s) 6.02
iii.
i. ii.
iv.
Terminals of current & voltage inputs to relay are checked Function of output signals are checked Harmonics test in all differential protection are checked Whether equipment is earthed
42. REMARKS:
1. For Over frequency and Over fluxing protection output relays are not configure
as per scheme.
2. Both Over & Under Frequency operates only when 400Kv Breaker is open
condition unless it will in blocking mode.
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign:
PAGE 30 of 24
3. In stator earth fault 3W protection channels are not measured the current input. 4. Relay works healthy.
Witness by STEAG ENERGY LTD Name: SURESH PADHY/ALANKA PANDA Designation: Sr.ENGINEER Sign: