Plant description and process assesment /identification code for Cement Plants Period for 01.04.2003 to 31.03.

2004 Data to be provided on overall Plant basis


Name of the Company Plant Name & Location Age of the plant (years) Last Major Modification (year) Chief Executive of Plant Designation Email Tel.No. Fax.No. City State Total no. of Kilns A

List of modifications

Process Dry Semi Dry / Semi wet Wet

Please

Energy cons (overall)

kWh/t clinker kWh/t cement - (product mix basis ) kWh/t cement - (OPC 43 equivalent ) kcal/kg clinker Installed plant capacity Upto 600 TPD 600-1500 TPD 1500-3500 TPD 3500-4500 TPD >4500 TPD Present Capacity Mining Conventional mining Surface miner Semi-mechanised Mechanised Manual Please

B1 C

Please

Energy consumption

kWh/t material kWh/t cement( OPC 43 basis)

Crusher Jaw Crusher Impactor Hammer Mill Any other

tph

Energy consumption

kWh/t material kWh/t cement( OPC 43 basis) Raw Grinding Ball Mill VRM Roller Press & Ball Mill Pre-grinder tph

Energy consumption

kWh/t material kWh/t cement(OPC 43 basis)

Coal Grinding Ball Mill E Mill VRM Pre-grinder

tph

Energy consumption

kWh/t coal kWh/t cement( OPC 43 basis) Kiln SP Kiln PC Kiln (4 stage) PC Kiln (5/6 stage) SD / SW Wet tpd

Energy consumption

kWh/t clinker kWh/t cement( OPC 43 basis) kcal/kg clinker

Type of Cooler Planetary Conventional Grate Energy efficient Grate Any other Type of Fuel Indian Coal Imported Coal Petcoke Any other Cement Grinding

Please

tph

Energy consumption K

Ball Mill VRM Roller Press & Ball Mill Ball Mill with Pre Grinder kWh/t cement ( OPC 43 basis) Type of Cement OPC PPC PSC Any other Packing & Dispatch Semi Automatic Fully Automatic kWh/t cement( OPC 43 basis) %

Energy consumption

IDENTIFICATION CODE : Based on the above information the identification code will be generated by the computer (The user need not fill the below section)

INSTRUCTIONS FOR FILLING UP THE FORMAT 1. Items C to L pertain to section-wise data. 2. Section-wise energy consumption levels are to be the weighted average values of multiple units 3. Specific heat consumption (kcal/ kg clinker) is on the basis of GCV of fuel as fed to kiln.

ion and process assesment /identification code for Cement Plants Period for 01.04.2003 to 31.03.2004 Data to be provided on overall Plant basis

You might also like