Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SKETCH FOR LOCATION OF PLUMB CONCRETE

RRM 10m length of 3m wide section to be constructed. 45 m reconstruction in progress (1.9m section) 25m Wall constructed again RRM 10m length,Section 1.9m, to be constructed WEST EAST Reconstruction work in progress for 37m (3m Section) RRM 20m length,Section -1.9m to be constructed.

NORTH

RRM 20m length,Section -1.9m,to be constructed. RRM 47m length,Section -3.0m to be 184m constructed. RCC wall 60m.

SOUTH

You might also like