ITEM
BENDUNG
SALURAN PEMBAWA & AKSES
KOLAM PENENANG
PENSTOCK
PH
TAILRACE
AKSES DARI/KE PH
500
100
TOTAL
PRAKIRAAN TANAH HARGA PER METER (SEWA)
500
M2
15,000
M2
50,000
25,000,000
700
TOTAL
300
210,000
3,150,000,000
1,300
TOTAL
200
260,000
3,900,000,000
148.5
45
22
990
148.5
0.15
0.15
6.75
3.3
22.275
4800 M3
138 M
14 M
88 M
Sub Total
Jumlah Total
24,000.00
M3
250.00
M3
60.00
50.00
13,290,000,000.00
Sub Total
PEKERJAAN BAJA
PINTU PENGURAS DI DAM
KISI-KISI PADA PINTU PENGAMBILAN
PINTU PENGAMBILAN
KISI-KISI PADA INTAKE PIPA PESAT
PIPA PESAT
OVERHEIGHT TOWER CRANE
JALUR TRANSMISI & GARDU INDUK
150,000,000.00
250,000,000.00
300,000,000.00
3,840,000,000.00
750,000,000.00
850,000,000.00
350,000,000.00
2,000,000,000.00
250,000,000.00
2,500,000,000.00
300,000,000.00
1,750,000,000.00
1
1
2
2
14 M
1
3500 M
165,000,000.00
165,000,000.00
110,000,000.00
45,000,000.00
1,500,000,000.00
750,000,000.00
1,050,000,000.00
500,000,000.00
2,000,000,000.00
400,000,000.00
19,200,000,000.00
750,000,000.00
900,000,000.00
550,000,000.00
1,200,000,000.00
500,000,000.00
2,500,000,000.00
200,000,000.00
4,000,000,000.00
33,600.00
150.00
60.00
300.00
32,700,000,000.00
1.00
1.00
2.00
2.00
60.00
1.00
7,300.00
165,000,000.00
165,000,000.00
110,000,000.00
45,000,000.00
4,500,000,000.00
750,000,000.00
2,190,000,000.00
M3
350,000,000.00
900,000,000.00
600,000,000.00
26,880,000,000.00
750,000,000.00
900,000,000.00
450,000,000.00
1,200,000,000.00
500,000,000.00
2,500,000,000.00
200,000,000.00
4,000,000,000.00
39,230,000,000.00
1.00
1.00
2.00
2.00
60.00
1.00
2,500.00
165,000,000.00
165,000,000.00
110,000,000.00
45,000,000.00
4,500,000,000.00
750,000,000.00
750,000,000.00
3,785,000,000.00
7,925,000,000.00
6,485,000,000.00
17,075,000,000.00
40,625,000,000.00
45,715,000,000.00
PEKERJAAN SIPIL
Pembersihan Lahan
Jalan Akses
Cofferdam
Bendung
Bangunan Pengambilan
Bangunan Pengendap lumpur
Saluran Pembawa
Bak Penenang
Pondasi Pipa Pesat
Gedung Sentral
Saluran Pembuang
Bangunan pelengkap
Sub Total
PEKERJAAN BAJA
PINTU PENGURAS DI DAM
KISI-KISI PADA PINTU PENGAMBILAN
PINTU PENGAMBILAN
KISI-KISI PADA INTAKE PIPA PESAT
PIPA PESAT
OVERHEIGHT TOWER CRANE
JALUR TRANSMISI & GARDU INDUK
Sub Total
Jumlah Total
ALTERNATIF 2
992 kW
ALTERNATIF 3
647 kW
150,000,000
250,000,000
300,000,000
3,840,000,000
750,000,000
850,000,000
350,000,000
2,000,000,000
250,000,000
2,500,000,000
300,000,000
1,750,000,000
13,290,000,000
500,000,000
2,000,000,000
400,000,000
19,200,000,000
750,000,000
900,000,000
550,000,000
1,200,000,000
500,000,000
2,500,000,000
200,000,000
4,000,000,000
32,700,000,000
350,000,000
900,000,000
600,000,000
26,880,000,000
750,000,000
900,000,000
450,000,000
1,200,000,000
500,000,000
2,500,000,000
200,000,000
4,000,000,000
39,230,000,000
165,000,000
165,000,000
110,000,000
45,000,000
1,500,000,000
750,000,000
1,050,000,000
3,785,000,000
165,000,000
165,000,000
110,000,000
45,000,000
4,500,000,000
750,000,000
2,190,000,000
7,925,000,000
165,000,000
165,000,000
110,000,000
45,000,000
4,500,000,000
750,000,000
750,000,000
6,485,000,000
17,075,000,000
40,625,000,000
45,715,000,000
ALTERNATIF 1
1.300 kW
2
30,198,325,820
1,207,933,033
31,406,258,853
ALTERNATIF 2
1.100 kW
2
27,074,361,080
1,082,974,443
28,157,335,523
ALTERNATIF 3
650 kW
2
21,867,753,180
874,710,127
22,742,463,307
PRA OPERASIONAL
PRA OPERASIONAL
PEMBEBASAN LAHAN
SUB TOTAL
ALTERNATIF 1
25,000,000
25,000,000
ALTERNATIF 2
3,150,000,000
3,150,000,000
ALTERNATIF 3
3,900,000,000
3,900,000,000
KETERANGAN
ALT 3 :1300 kW
(Rp. )
Nilai Proyek
57,623,235,517
57,623,235,517
-
EQUITY 100%
LOAN 0%
BIAYA LANGSUNG
BIAYA TIDAK LANGSUNG
PAJAK (10%)
48,481,258,853
3,903,500,708
5,238,475,956
Kapasitas
Jam Produksi per tahun
Jangka waktu kontrak
Harga kontrak per Kwh (Tegangan Menengah / Rendah)
Proyeksi output
Output yang di hasilkan pertahun
85,178,414,602
85,178,414,602
68,782,335,523
8,652,586,842
7,743,492,237
2,600
8,760
15
984
95%
21,637,200
85,617,466,409
85,617,466,409
68,457,463,307
9,376,597,065
7,783,406,037
2,100
8,760
15
984
95%
17,476,200
1,300
kW
8,760
Jam / Tahun
15
Tahun
984
per KwH
95% Koefisien Faktor
10,818,600
Kwh / Tahun
PROYEKSI PENDAPATAN
Penjualan selama 1 tahun
Penjualan selama 1 bulan
21,291,004,800
1,774,250,400
17,196,580,800
1,433,048,400
10,645,502,400
887,125,200
/ Tahun
/ Bulan
70,970,016
16,200,000
44,356,260
124,197,528
88,712,520
88,712,520
433,148,844
57,321,936
16,200,000
35,826,210
100,313,388
71,652,420
71,652,420
352,966,374
35,485,008
16,200,000
22,178,130
62,098,764
44,356,260
44,356,260
224,674,422
4.0%
/ Bulan
2.5%
7.0%
5.0%
/ Bulan
5.0%
/ Bulan
2.33%
27.93%
ANALISA BEP
1,341,101,556
16,093,218,672
1.87%
22.49%
3.5806
3 TAHUN
5 BULAN
1,080,082,026
12,960,984,312
0.78%
9.33%
6.5719
6 TAHUN
5 BULAN
662,450,778
7,949,409,336
10.7703
10 TAHUN
7 BULAN
NO
URAIAN
PLTM KALIBUMI
ALTERNATIF 1
PLTM KALIBUMI
ALTERNATIF 2
PLTM KALIBUMI
ALTERNATIF 3
INVESTASI
A
BIAYA LANGSUNG
17,075,000,000
40,625,000,000
45,715,000,000
31,406,258,853
28,157,335,523
22,742,463,307
48,481,258,853
68,782,335,523
68,457,463,307
2,424,062,943
3,439,116,776
3,422,873,165
1,454,437,766
2,063,470,066
2,053,723,899
Pembebasan Lahan
25,000,000
3,150,000,000
3,900,000,000
3,903,500,708
8,652,586,842
9,376,597,065
52,384,759,561
77,434,922,365
77,834,060,372
5,238,475,956
7,743,492,237
7,783,406,037
57,623,235,517
85,178,414,602
85,617,466,409
PPN (10%)
TOTAL BIAYA PROYEK
PRODUKSI
ENERGI
ESKALASI
TOTAL
Rp/kWh
Rp/kWh
Rp/kWh
Rp/kWh
Rp/kWh
BPP PLTD
NABIRE
POTENSI
PENGHEMATAN
Rp/kWh
Rp.
10.37
1.00
984
59.43
10.00
34.47
1,087.90
1,933.45
18,295,334,460.00
10.37
1.05
984
60.48
10.00
35.52
1,090.00
2,024.32
19,356,463,858.68
10.37
1.10
984
61.58
10.00
36.62
1,092.20
2,119.47
20,479,138,762.48
10.37
1.16
984
62.74
10.00
37.78
1,094.52
2,219.08
21,666,928,810.71
10.37
1.22
984
63.96
10.00
39.00
1,096.96
2,323.38
22,923,610,681.73
10.37
1.28
984
65.24
10.00
40.28
1,099.52
2,432.58
24,253,180,101.27
10.37
1.34
984
66.58
10.00
41.62
1,102.20
2,546.91
25,659,864,547.14
10.37
1.41
984
67.99
10.00
43.03
1,105.02
2,666.61
27,148,136,690.88
10.37
1.48
984
69.47
10.00
44.51
1,107.98
2,791.94
28,722,728,618.95
10
10.37
1.55
984
71.02
10.00
46.06
1,111.08
2,923.16
30,388,646,878.85
11
10.37
1.63
984
72.65
10.00
47.69
1,114.34
3,060.55
32,151,188,397.82
12
10.37
1.71
984
74.36
10.00
49.40
1,117.76
3,204.40
34,015,957,324.89
13
10.37
1.80
984
76.16
10.00
51.20
1,121.36
3,355.00
35,988,882,849.74
14
10.37
1.89
984
78.05
10.00
53.09
1,125.14
3,512.69
38,076,238,055.02
15
10.37
1.98
984
80.03
10.00
55.07
1,129.10
3,677.79
40,284,659,862.21
16
10.37
2.08
984
82.11
10.00
57.15
1,133.26
3,850.64
42,621,170,134.22
17
10.37
2.18
984
84.29
10.00
59.33
1,137.62
4,031.62
45,093,198,002.01
18
10.37
2.29
984
86.58
10.00
61.62
1,142.20
4,221.11
47,708,603,486.12
19
10.37
2.41
984
88.99
10.00
64.03
1,147.02
4,419.50
50,475,702,488.32
20
10.37
2.53
984
91.52
10.00
66.56
1,152.08
4,627.22
53,403,293,232.64
21
10.37
2.65
984
94.17
10.00
69.21
1,157.38
4,844.70
56,500,684,240.13
22
10.37
2.79
984
96.96
10.00
72.00
1,162.96
5,072.40
59,777,723,926.06
23
10.37
2.93
984
99.89
10.00
74.93
1,168.82
5,310.80
63,244,831,913.77
24
10.37
3.07
984
102.96
10.00
78.00
1,174.96
5,560.41
66,913,032,164.77
25
10.37
3.23
984
106.19
10.00
81.23
1,181.42
5,821.75
70,793,988,030.33
26
10.37
3.39
984
109.58
10.00
84.62
1,188.20
6,095.37
74,900,039,336.09
27
10.37
3.56
984
113.14
10.00
88.18
1,195.32
6,381.85
79,244,241,617.58
28
10.37
3.73
984
116.87
10.00
91.91
1,202.78
6,681.80
83,840,407,631.40
29
10.37
3.93
984
120.80
10.00
95.84
1,210.64
6,995.84
88,703,151,274.02
30
10.37
4.12
984
124.92
10.00
99.96
1,218.88
7,324.65
93,847,934,047.91
1,138.95
DEBIT
(m3/detik)
15%
20%
25%
30%
35%
40%
45%
50%
55%
60%
65%
70%
75%
80%
85%
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
3.15
2.68
2.52
2.36
2.21
2.05
1.89
1.73
1.58
1.42
1.26
1.10
0.95
0.79
0.63
0.47
Daya
Terpasang
(kW)
Energi
(GWh)
Capacity
Factor
Indeks Biaya
Kapasitas
Annualized Biaya
Konstuksi
(Juta Rp.)
URAIAN
TAHUN
JUMLAH
(1)
(57,623,235,517.13)
(2)
(21,291,004,800.00)
POTENSI PENGHEMATAN
18,295,334,460.00
POTENSI PENGHEMATAN
19,356,463,858.68
POTENSI PENGHEMATAN
20,479,138,762.48
POTENSI PENGHEMATAN
21,666,928,810.71
POTENSI PENGHEMATAN
22,923,610,681.73
POTENSI PENGHEMATAN
24,253,180,101.27
POTENSI PENGHEMATAN
25,659,864,547.14
POTENSI PENGHEMATAN
27,148,136,690.88
POTENSI PENGHEMATAN
28,722,728,618.95
POTENSI PENGHEMATAN
10
30,388,646,878.85
POTENSI PENGHEMATAN
11
32,151,188,397.82
POTENSI PENGHEMATAN
12
34,015,957,324.89
POTENSI PENGHEMATAN
13
35,988,882,849.74
POTENSI PENGHEMATAN
14
38,076,238,055.02
POTENSI PENGHEMATAN
15
40,284,659,862.21
POTENSI PENGHEMATAN
16
42,621,170,134.22
POTENSI PENGHEMATAN
17
45,093,198,002.01
POTENSI PENGHEMATAN
18
47,708,603,486.12
POTENSI PENGHEMATAN
19
50,475,702,488.32
POTENSI PENGHEMATAN
20
53,403,293,232.64
POTENSI PENGHEMATAN
21
56,500,684,240.13
POTENSI PENGHEMATAN
22
59,777,723,926.06
POTENSI PENGHEMATAN
23
63,244,831,913.77
POTENSI PENGHEMATAN
24
66,913,032,164.77
POTENSI PENGHEMATAN
25
70,793,988,030.33
POTENSI PENGHEMATAN
26
74,900,039,336.09
POTENSI PENGHEMATAN
27
79,244,241,617.58
POTENSI PENGHEMATAN
28
83,840,407,631.40
POTENSI PENGHEMATAN
29
88,703,151,274.02
POTENSI PENGHEMATAN
30
93,847,934,047.91
PENILAIAN DASAR
IRR
DISCOUNT FACTOR
27.93%
14.96%
KESIMPULAN
DAPAT DILANJUTKAN
URAIAN
TAHUN
JUMLAH
(1)
(57,623,235,517.13)
(2)
(21,291,004,800.00)
POTENSI PENGHEMATAN
18,295,334,460.00
POTENSI PENGHEMATAN
19,356,463,858.68
POTENSI PENGHEMATAN
20,479,138,762.48
POTENSI PENGHEMATAN
21,666,928,810.71
POTENSI PENGHEMATAN
22,923,610,681.73
POTENSI PENGHEMATAN
24,253,180,101.27
POTENSI PENGHEMATAN
25,659,864,547.14
POTENSI PENGHEMATAN
27,148,136,690.88
POTENSI PENGHEMATAN
28,722,728,618.95
POTENSI PENGHEMATAN
10
30,388,646,878.85
POTENSI PENGHEMATAN
11
32,151,188,397.82
POTENSI PENGHEMATAN
12
34,015,957,324.89
POTENSI PENGHEMATAN
13
35,988,882,849.74
POTENSI PENGHEMATAN
14
38,076,238,055.02
POTENSI PENGHEMATAN
15
40,284,659,862.21
POTENSI PENGHEMATAN
16
42,621,170,134.22
POTENSI PENGHEMATAN
17
45,093,198,002.01
POTENSI PENGHEMATAN
18
47,708,603,486.12
POTENSI PENGHEMATAN
19
50,475,702,488.32
POTENSI PENGHEMATAN
20
53,403,293,232.64
POTENSI PENGHEMATAN
21
56,500,684,240.13
POTENSI PENGHEMATAN
22
59,777,723,926.06
POTENSI PENGHEMATAN
23
63,244,831,913.77
POTENSI PENGHEMATAN
24
66,913,032,164.77
POTENSI PENGHEMATAN
25
70,793,988,030.33
POTENSI PENGHEMATAN
26
74,900,039,336.09
POTENSI PENGHEMATAN
27
79,244,241,617.58
POTENSI PENGHEMATAN
28
83,840,407,631.40
POTENSI PENGHEMATAN
29
88,703,151,274.02
POTENSI PENGHEMATAN
30
93,847,934,047.91
DISCOUNT FACTOR
27.93%
DASAR PENILAIAN
NPV
59,891,173,876.37
DAPAT DILANJUTKAN
ALTERNATIF
IDC
CRF
Ct
CA
0.2437
0.15099
57,623,235,517.1264
10,821,200,081.0233
0.2437
0.15099
85,178,414,601.5616
15,995,850,609.8447
0.2437
0.15099
85,617,466,408.9536
16,078,301,159.7156
ALTERNATIF
IDC
CRF
Ct
0.2437
0.15099
57,623,235,517.1264
0.2437
0.15099
85,178,414,601.5616
0.2437
0.15099
85,617,466,408.9536
* Formula
CA =
Ct x (1 + IDC) x CRF
CA
US$ /Kw
Rp./kW)
10,821,200,081.0233
2,462.53
22,162,782.8912
15,995,850,609.8447
4,506.79
40,561,149.8103
16,078,301,159.7156
7,317.73
65,859,589.5453