Assistance Required For M&P Installed at WMU/ WCC/TKD
Assistance Required For M&P Installed at WMU/ WCC/TKD
2013
Some components are required for smooth running air compressor demanded by AWM/KLK staff. Components cases are under procurement process. crank shaft repair case under process and technical suitability given. Components required procurement case under process. radiator procurement case under process
Electric air compressor 2HA2 S.No. Compressor seized and 7037 crank shaft jammed
repair case under process and approval received, quotation collection in process.
* *
Both fork lift truck completed codal life. Two new fork lift procurement case under process. The fork lift are required urgently. Five Nos. whiting jacks demanded by C&W Depot/ HNZM and repaired as per their requirement and checked by the / SSE/IC/HNZM Staff,and same informed awaiting their demand for dispatch.
Date:21.03.2013
Location
BLC/ROH
Train Duty
NH Yard
ROH
d urgently.