Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ANALISA HARGA SATUAN PEKERJAAN : BETON DINDING MUTU K-300 / M3 HARGA SAT. (Rp.) JUMLAH (Rp.

NO.

URAIAN PEKERJAAN

VOLUME

SATUAN

UPAH - Cor, perataan, curing & pembersihan BAHAN - Ready mixed concrete K-250, batu split ALAT - Kereta sorong, talang, vibrator & alat bantu lainnya

1.000

m3

50,000.00

50,000.00

II

1.030

m3

885,500.00

912,065.00

III

1.000

m3

5,000.00

5,000.00 967,065.00 116,047.80 1,083,112.80 1,083,112.80

Total Overhead, PPh & Contractor Fee. : (12 %) Total Rounded

ANALISA HARGA SATUAN PEKERJAAN : WATERPROOFING INTEGRAL 2,00 ltr / M3


NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SAT. (Rp.) JUMLAH (Rp.)

UPAH - Pasang Waterproofing Integral BAHAN - Waterproofing integral ex. SIKA type Visconcrete 10 single component konsumsi 2,00 ltr/m3 ALAT

1.000

m3

5,000.00

5,000.00

II

2.000

liter/m3

50,000.00

100,000.00

III

Total Overhead, PPh & Contractor Fee. : (12 %) Total Rounded

105,000.00 12,600.00 117,600.00 117,600.00

You might also like