1. National Highways
a.
b. c.
Asian Highway (Currently the existing Phuentsholing-Thimphu Highway) Primary National Highway (existing East-West Highway) Secondary National Highway (Currently District Roads)
Shoulder 1500 Carriageway 6500
50mm DBM + 25mm AC
Shoulder 1500
L-Drain 1000
Subgrade CBR = 7%
Shoulder 1500
L-Drain 1000
Subgrade CBR = 7%
2. Dzongkhag Roads Currently feeder Roads Connects a Dzongkhag centre and a Dungkhag Centre etc.
Shoulder 500
Carriageway 3500
Shoulder 500
L-Drain 600
Subgrade CBR = 7%
Dzongkhag Road
Subgrade CBR = 7%
Hard Shoulder Compacted Granular Soil Note: If the traffice is less than 10-15 vpd, single layer base course should sufice Soling
Farm Road
MAJOR ACTIVITIES
1. 2. 3. 4. 5. 6. FORMATION CUTTIN G SUB-GRADE PREPARATION BASE COURSE & BLACK TOPPING SHOULDER PERMANENT WORKS BRIDGES
1. FORMATION CUTTING
SLOPE GRADIENT GEOMETRIC DISPOSAL OF SPOIL
FORMATION CUTTING
2. SUB-GRADE PREPARATION
In order to maintain stable and durable sub-grade, uniform consolidation to be incorporated Sub-grade act as a cushion for other layers i.e. In order to achieve durable road sub-grade should be strong. Maintain proper Camber
CAMBER
SUB-GRADE PREPARATION
Wet Mix Macadam (WMM), 10 to 40mm plus soil with water & rolling
Granular Sub Grade ( 70mm below), rolling Sub-Grade Preparation
TYPE - I
TYPE - II
4. SHOULDER:
A hard area at the side of a main road, especially a motorway, where a driver can stop if there is a serious problem Shoulder should be strong enough to resist any types of vehicle Maintain proper compaction as per the design Width and thickness should be as per the specification
SHOULDER
PERMANENT WORKS
RETAINING WALL BREAST WALL RCC WALL CULVERT DRAIN
Breast Wall
RCC Wall
Culverts
Culverts
L-Drain
CATCH PIT
CATCH PIT
3. BRIDGE CONSTRUCTION
RCC BRIDGE STEEL BRIDGE BAILEY BRIDGE WOODEN BRIDGE
RCC Bridge
Steel Bridge
Bailey Bridge
Wooden Bridge