Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

ASH-78 Well

9 5/8" Casing Cement Program


A/D = 12" 1/4 to 9 5/8" =lt/mt
B/E = EXCESS
C =9"5/8 to 13"3/8 =lt/mt
F =9"5/8(47#) CSG=lt/mt
TOPC.MT

13"3/8 CSG-K55&68#
SHOE MT

TEMP. 129C

1453

LEAD SLURRY @1,54 KG/LT

200
C

29
20%
31
38.2

YIELD =

1653

1.294

MIX H2o =

959

THICKENING TIME : Hr 06:10

A=

2600

1653

B=

27463 x

20%

C=

1653

1453

29

27463

Volume in O.H.

5492.6

Excess

6200

O.H. 12 1/4"
-

31

Vol. bet. Csg

9" 5/8 CSG

TOTAL VOLUME

N80 47#

L.S. MT

39.156
30.259
30.259
30.259
30.259
30.259
29185

2600
501

COLL.MT

3067

SHOE MT

3101

D
F

:
x
x
x
x
x
:

39 M3

1.294
=
959
=
0.03
=
2
=
3.5
=
964.5 =
159 =

246 BBL

30.3

T TON CMT. CLASS "G"


L DRILL WATER
T 3% B.W.O.C. BENTONITE
L D 175 ANTIFOAM
L D 110 RETARDER
29.2 M3
MIX WATER
183.6 BBL

29019
0.9078
60.519
105.91

TAIL SLURRY @ 1,90 KG/LT


TVD. MT

YIELD = 1.006

3106

MIX H2o=

496

THICKENING TIME : Hr 05:35


PIT N4
H2o
BENTONITE
D 175
D 177

= MC
= T
= L
= L

DOWELL PIT
H2o
D 175
D 177
D080A

= MC
= L
= L
= L

D=

3101

2600

E=

14529 x

20%

F=

3101

- 3066.9

TOTAL VOLUME
18.736
18.624
18.624
18.6
18.624
18.624
18.624
18.624
9.3028

29

38.2

14529

Volume in O.H.

2905.8

Excess

1301.092

: 1.006
=
x
496
=
x 35%
=
x 0.15% =
x
2
=
x
1.5
=
x
6
=
x 499.5 =
: 158.9
=

19 M3

Vol. inside CSG

118 BBL

18.6
T TON CMT CLASS "G"
9237.6 L DRILL WATER
6.5185 T D066 SILICA FLOWER
27.936 KG D 153 ANTISETTING AGENT
37.248 L D 175 ANTIFOAM
27.936 L D110 RETARDER
111.74 L D080A DISPERSANT
9.3
M3
MIX WATER
58.5 BBL

DISPLACEMENT

You might also like