Professional Documents
Culture Documents
Checklist For Critical Equipment and Technical Systems: - Included S/B Arrangement and Not-In-Continuous Use
Checklist For Critical Equipment and Technical Systems: - Included S/B Arrangement and Not-In-Continuous Use
Checklist For Critical Equipment and Technical Systems: - Included S/B Arrangement and Not-In-Continuous Use
2009
Equipment or Technical Systems Main Propulsion Systems -1. Control System 1.1 1.2 Ahead and Astern Test Machine Side Yes Yes No No
II.
Bridge 2.1 2.2 2.3 2.4 2.5 2.6 Radar S Band Radar X Band VFH Primary VFH Secondary Steering Gear no. 1 (Starboard) Steering Gear no. 2 (Port) Yes Yes Yes Yes Run Run No No No No Standby Standby
III.
Engine Room 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 Boiler Feed Pump no. 1 Boiler Feed Pump no. 2 FO Circulating pump no. 1 FO Circulating pump no. 2 FO supply Pump no. 1 FO Supply Pump no. 2 Main Cool F.W. Pump no. 1 Main Cool F.W. Pump no. 2 Main Cool S.W. Pump no. 1 Main Cool S.W. Pump no. 2 Main Lubricating Oil Pump no. 1 Main Lubricating Oil Pump no. 2 Fuel Oil Settling Tank ( Fuel Oil Service Tank ( Diesel Oil ( m) m) Cylinder Oil Tank ( m) m) Run Run Run Run Run Run Run Run Run Run Run Run Yes Yes Yes Yes Yes Yes Standby Standby Standby Standby Standby Standby Standby Standby Standby Standby Standby Standby No No No No No No
Yes IV Generating Systems Stand-by Generator Back-up system Parallel running Power sharing Emergency Generator V. Environmental management system equipment 6.1 6.2 6.3 6.4 6.5 VI. Oily Water Separator Oil Content Monitor Sewage Treatment Plant Incinerator Galley Comminutor Yes Yes Yes Yes Yes Run Run
No Standby
Standby
No No No No No
Masters Option 7.1 7.2 7.3 7.4 7.5 7.6 7.6 INMARSAT B & C Public Address System Gyro Compass General Alarm System Emergency Fire Pump Fixed Fire Fighting System Life Boat Engine Yes Yes Yes Yes Yes Yes Yes No No No No No No No
VII Others .