Project Management Plan Template
Project Management Plan Template
Project Management Plan Template
Version <x.x>
[Note: The following template is provided for use in Xavor projects. Text enclosed in square brackets and displayed in blue italics (style=InfoBlue) is included to provide guidance to the author and should be deleted before publishing the document.]
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
2 of 17
Revision History
[For every revision of this document, provide the revision history that should include the date of revision, version number, description of the changes in the document, and author of the document for that particular version.] Date <dd/mm/yyyy> Version <x.x> <Details> Description Author <Name>
Distribution List
[State the persons/teams/groups to whom this document should be distributed whenever the document is revised. Also state the name of their parent organization.] Document Recipient <Role Name> Organization <Organization Name>
Confidential
Page 2 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
3 of 17
Table of Contents
1. Project Management Plan 1. Introduction 1.1 Purpose 1.2 Scope 1.3 Definitions, Acronyms and Abbreviations 1.4 References 1.5 Overview 2. Project Overview 2.1 Project Name, Code and Leader 2.2 Project Purpose, Scope and Objectives 2.3 Assumptions and Constraints 2.3.1 Critical Assumptions and Constraints 2.3.2 Non-Critical Assumptions and Constraints 2.4 Project Milestones 2.5 Project Deliverables 2.6 Tailoring Guidelines 2.7 Software Development Life Cycle 3. Project Organization 3.1 Organizational Structure 3.2 External Interfaces 3.3 Roles and Responsibilities 3.3.1 <Organizational Unit Name> 4. Management Process 4.1 Work Breakdown Structure (WBS) 4.2 Project Estimates 4.2.1 Estimation Technique 4.2.2 Size 4.2.3 Effort 4.3 Project Schedule 4.3.1 Pre-Development Schedule 4.3.2 Development Schedule 4.4 Project Phases, Iterations and Releases 4.4.1 Project Phases 4.4.2 Project Iterations 4.4.3 Releases 4.5 Project Resourcing 4.5.1 Staffing 4.5.2 Resource Acquisition Confidential Xavor Corporation, 2001 2 5 5 5 5 5 6 7 7 7 7 7 7 7 7 8 8 9 9 11 11 11 12 12 12 12 12 12 12 12 12 12 12 12 12 13 13 13 Page 3 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
4 of 17
4.5.3 Training 4.6 Project Budget 4.7 Project Monitoring and Control 4.7.1 Schedule Control 4.7.2 Budget Control 4.7.3 Measurements 4.8 Risk Management Plan 4.9 Project Closure 5. Technical Process Plans 5.1 User Experience Design 5.2 Requirements 5.3 Analysis and Design 5.4 Development Plan 5.5 Peer Review Plan 5.6 Maintenance 5.7 Test Plan 5.8 Tools, Techniques and Standards 5.8.1 Tools 5.8.2 Techniques and Standards 5.9 Infrastructure 5.10 Facilities 5.11 Security Plan 6. Supporting Process Plans 6.1 Configuration Management Plan 6.2 Documentation 6.3 Software Quality Assurance Plan 6.4 Intergroup Coordination 6.5 Communication 6.6 Problem Resolution 6.7 Subcontractor Management 7. Additional plans 8. Appendices
13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 15 16 16 16 16 16 16 16 16 16 16 16 17 17
Confidential
Page 4 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
5 of 17
1.2
1.3
1.4
Confidential
Page 5 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
6 of 17
1.5
Overview [This subsection should describe what the rest of the Project Management Plan contains and explain how the document is organized.]
Confidential
Page 6 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
7 of 17
2.
2.1
Project Overview
Project Name, Code and Leader [Specify the project name, project code and project leader (project manager).] Project Name: <Project Name> Project Code: <xxx-xxx> Project Leader: <Name>
2.2
Project Purpose, Scope and Objectives [A brief description of the purpose and objectives of this project, and a brief description of what deliverables the project is expected to deliver.] Assumptions and Constraints [A list of assumptions that this plan is based on, and any constraints (e.g. budget, staff, equipment, schedule, etc.) that apply to the project. Make a distinction between critical and non-critical factors.] Critical Assumptions and Constraints [State the critical assumptions and constraints affecting the project.] Non-Critical Assumptions and Constraints [State the non-critical assumptions and constraints affecting the project.] Project Milestones [Tabular list of major milestones to be achieved during the project, with target dates.] Milestone Target Achievement Date <dd/mm/yyyy>
2.3
2.3.1
2.3.2
2.4
<Milestone Name>
2.5
Project Deliverables [Tabular list of the artifacts to be created during the project, with target delivery dates.] Deliverables Target Delivery Date <dd/mm/yyyy>
<Deliverable Name>
Confidential
Page 7 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
8 of 17
2.6
Tailoring Guidelines [Specify the tailoring guidelines for the project.] Software Development Life Cycle [Specify the Software Development Life Cycle that is to be followed in the project.]
2.7
Confidential
Page 8 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
9 of 17
3.
3.1
Project Organization
Organizational Structure [Describe the organizational structure of the project team, including management and other review authorities. This should include identification of all project organizational units and a description of their function and responsibility. A diagram of the organizational structure should also be attached for further illustration. Examples of project organizational units are: Project Implementation Committee Project Steering Committee Project Management Team Architecture Group User Experience Design Team Requirements Team Analysis and Design Team Implementation Group Development Team Database Management Team Testing Team Infrastructure Team Configuration Management Team Software Quality Assurance Team, etc.] Organizational Unit Description <Description>
Confidential
Page 9 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
10 of 17
Project Manager
Requirements Team
Testing Team
Infrastructure Team
Confidential
Page 10 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
11 of 17
3.2
External Interfaces [Describe how the project interfaces with external groups. For each external group, identify the internal/external contact names.] External Role External Role Holder <Role Holder Name> Responsibility of External Role Holder <Responsibility Details> Internal Contact Role and Person <Role Name>, <Person Name>
<Role Name>
3.3
Roles and Responsibilities [Specify the roles, responsibilities and role holders within each organizational unit of the project.] <Organizational Unit Name> Role Responsibility <Responsibility Detail> Role Holder <Role Holder Name>
3.3.1
<Role Name>
Confidential
Page 11 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
12 of 17
4.
4.1
Management Process
Work Breakdown Structure (WBS) [List the activities necessary for completing the project.] Project Estimates Estimation Technique [Specify the estimation method and the reason for its choice. Provide the estimated cost as well as the basis for those estimates, and the points/circumstances in the project when re-estimation will occur.] Size [State the size of each activity as calculated according to the estimation technique. Units of size may be in LOC, FP, etc.] Effort [Specify the amount of effort required to perform each activity on the basis of the size estimation. Units may be man-hours, man-days, etc.] Project Schedule [Diagrams/tables showing target dates for completion of iterations and phases, release points, demos, and other milestones. Critical path must be specified. Usually enclosed by reference to MS Project file.] Pre-Development Schedule [This schedule will cater for project planning, requirements, analysis and design activities.] Development Schedule [This schedule will cater coding, testing and deployment activities.] Project Phases, Iterations and Releases Project Phases [Identify phases and major milestones with their achievement criteria.] Project Iterations [Specify the number of iterations and list the objectives to be accomplished for each of the iterations.] Releases [Brief descriptions of each software release, whether demo, beta, etc.]
4.2 4.2.1
4.2.2
4.2.3
4.3
4.3.1
4.3.2
4.4 4.4.1
4.4.2
4.4.3
Confidential
Page 12 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
13 of 17
4.5 4.5.1
Project Resourcing Staffing [Identify here the numbers and type of staff required (including and special skills or experience), scheduled by project phase or iteration. State what resources are critical.] Resource Acquisition [Describe how you will approach finding and acquiring the staff needed for the project.] Training [List any special training project team members will require, with target dates for when this training should be completed.] Project Budget [Allocation of costs against the WBS and the project phases.] Project Monitoring and Control Schedule Control [Describes the approach to be taken to monitor progress against the planned schedule and how to take corrective action when required.] Budget Control [Describes the approach to be taken to monitor spending against the project budget and how to take corrective action when required.] Measurements [Describe the types of measurements to be taken, their frequency, and responsible workers/entities for this purpose.] Risk Management Plan [Enclosed by reference] Project Closure [Describe the activities for the orderly completion of the project, including staff reassignment, archiving of project materials, post-mortem debriefings and reports etc.]
4.5.2
4.5.3
4.6
4.7 4.7.1
4.7.2
4.7.3
4.8
4.9
Confidential
Page 13 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
14 of 17
5.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8 5.8.1
5.8.1.1 Project Management Tools [Specify the project management tools that are to be used in the project and the reasons for their selection. Examples of areas to be covered are project planning, project scheduling, project monitoring, status reporting, measurements, etc. Examples of these tools are MS Project, etc.] 5.8.1.2 Requirements Management Tools [Specify the requirements management tools that are to be used in the project and the reasons for their selection. Examples of areas to be covered are requirements gathering, requirement issue resolution, requirement change management, measurements, etc. Examples of these tools are Rational Requisite Pro, EINS, etc.] 5.8.1.3 System Analysis & Design Tools [Specify the system analysis and design tools that are to be used in the project and the reasons for their Confidential Xavor Corporation, 2001 Page 14 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
15 of 17
selection. Examples of tools in this area are Visio, Rational Rose, Power Designer etc.] 5.8.1.4 Languages [Specify the languages that are to be used for software development in the project and the reasons for their selection. Examples of languages are HTML, Java, etc.] 5.8.1.5 User-Interface Development Tools [Specify the tools that are to be used for UI development in the project and the reasons for their selection. Examples of these tools can be Dreamweaver, Flash, etc.] 5.8.1.6 Database Management System Software [Specify the database management system software that is to be used in the project and the reasons for their selection. Examples of these tools are Oracle, SQL Server, etc.] 5.8.1.7 Third Party Software [Specify any third party software that is to be used in the project and the reasons for their selection. Examples are Inktomi, Infranet, etc.] 5.8.1.8 Software Testing Tools [Specify the software testing tools that are to be used in the project and the reasons for their selection. Examples of these tools are WinRunner, LoadRunner, etc.] 5.8.1.9 Defect and Change Management Tools [Specify the defect and change management tools that are to be used in the project and the reasons for their selection. Examples of these tools are ClearQuest, etc.] 5.8.1.10 Configuration Management Tools [Specify the configuration management tools that are to be used in the project and the reasons for their selection. Examples of these tools are ClearCase, etc.] 5.8.1.11 Integrated Development Environment [Specify the operating systems (platforms), web servers, application servers, development servers that are to be used in the project and the reasons for their selection. Examples of these tools are Sun Solaris, iPlanet, JBuilder, WebSphere, etc.] 5.8.2 Techniques and Standards [Lists the documented project technical standards etc by reference. Examples may be: User-Interface Guidelines Programming Guidelines Test Guidelines, etc.]
Confidential
Page 15 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
16 of 17
5.9
Infrastructure [Specify hardware, network connectivity, bandwidth, etc., required in this project. Make a clear distinction about what factors are critical.] Facilities [Describe the facilities required for the execution of the project. This will cover physical workspace, buildings, etc.] Security Plan [List down the security consideration e.g. of security can be operating system, access controls to site/product, physical security considerations.]
5.10
5.11
6.
6.1
6.2
6.3
6.4
6.5
6.6
6.7
Confidential
Page 16 of 17
Document #:
Ver.:
XVR.0002/PMP
Page #:
1.
17 of 17
7. 8.
Additional plans
[Additional plans if required by contract or regulations.]
Appendices
[Attach any supplementary information.]
Confidential
Page 17 of 17