Hand Over / Take Over Inspection Sheet: Manhole / I.C. No.
Hand Over / Take Over Inspection Sheet: Manhole / I.C. No.
CONTRACT No.: O-2536 INSPECTION No.: Pipe Diameter (mm): FROM MANHOLE / I.C.: MANHOLE / I.C. No.:
MH No. I.C. No.
Concrete with GRP liner from inside and epoxy paint with protection material from outside / Concrete with epoxy inside and out side with protection material on the outside.
OK NOT OK REMARKS
Cover & Frame Adjustment Ring Main Shaft Base Unit Ladder Backdrops Future Port PIPE LINE LENGTH (in m): Encasement of Pipe: Initial Deflection (%): Final Deflection (%):
DESCRIPTION
AVERAGE DEPTH (in m): Concrete Surround / Aggregate Surround / Allowable Deflection (%): Stiffness (N/m2) / Class: Allowable Deflection (%):
OK NOT OK REMARKS
Signature:
Date: