Pipelaying - Example From Ormen Lange
Pipelaying - Example From Ormen Lange
Development concept
Development area
(-900m)
-200
-300
-400
Water Depth
-500
-600
-700
-800
-900
0 5000 10000 15000 20000 25000 30000
KP
Route 2000
Route B
20.5
Span Height [m]
15.5
10.5
5.5
0.5
40 140 240 340 440
Critical Length
z Induced by current.
z Simplistic estimation tools
z Determines maximum length of free spans.
z Fatigue
z Puts severe constraints on pipeline routing
z Cost driver: Intervention work in deep water.
z Ormen Lange:
z Pioneer project.
z Basis for improved future methods
Rocksupports
(Pre/Post dumping) Dredging/Trenching
Submerged floating pipeline
0
-100
-200
-300
Depth [m]
-400
-500
-600
-700
-800
-900
-1000
0 5000 10000 15000 20000 25000
Length [m]
SHORT SPAN
L/D ≈ 100
• BEAM BEHAVIOUR GOVERNING
• SINGLE HALF WAVE MODE
• EXISTING DNV - G14
LONG SPAN
L/D ≈ 200
0.6
f (1/sec)
0.5
1
0.4
0.3
0.2
0.1
0
0 50 100 150 200 250 300 350 400
L/D
cable cable
small sag large sag
Eq 2:
1 N eff ⎛ P π 2
kδ 2
⎞
f1,CF = ⎜1 + E
+ ⋅ 0 ⎟ (Hz)
2L me ⎜⎝ N eff 4 L N eff ⎟⎠
Cable Beam Sag
Date: 2004-01-16 • Page: 12
Reliability analysis & RP-F105
z IL vibration controls fatigue life.
J-Lay
Terrain module
SIMULATOR
CONTROL Visualization ROV control and
GL view visualization
SIMLA
RIFLEX SIMO Pipelaying
cables and risers vessel INC. DP Free spans