Value and Budget Housing Corp PVT LTD.: Western Form Work Deshuttering

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

VALUE AND BUDGET HOUSING CORP PVT LTD.

WESTERN FORM WORK DESHUTTERING


For the Month of FEB 2013
SN BLOCK DATE OF CASTING FLOOR WING AGE OF TESTING IN HOURS COMP.STREGTH IN MPA STATUS

1 2 3

A1 F1 A1

1.02.2013 3.02.2013 5.02.2013

GROUND THIRD FIRST

LEFT LEFT RIGHT

38.4 40

6.5 7.33

DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Cube Casng) DESHUTTERING DONE(Maturity meter)

33.6

6.5

F1

6.02.2013

THIRD

RIGHT

31.2

6.5

DESHUTTERING DONE(Maturity meter)

5 6 7 8 9

A1 F1 A1 F1 A1

8.02.2013 10.02.2013 11.02.2013 13.02.2013 15.02.2013

FIRST FOURTH SECOND FOURTH SECOND

LEFT LEFT RIGTH RIGHT LEFT

31.2

6.5

DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter)

36 31.2 36 31.2

6.5 6.5 6.5 6.5

10

F1

16.02.2013

FIFTH

LEFT

28.8

6.5

DESHUTTERING DONE(Maturity meter)

11 12 13 14

F1 A1 F1 A1

19.02.2013 19.02.2013 23.02.2013 24.02.2013

THIRD LEFT LEFT RIGHT

RIGHT THIRD SIXTH THIRD

31.2

6.5

DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter) DESHUTTERING DONE(Maturity meter)

28.8

6.5

38.4

6.5

4.8

6.5

15

F1

26.02.2013

RIGHT

SIXTH

38.4

6.5

DESHUTTERING DONE(Maturity meter)

16

A1

27.02.2013

LEFT

FOURTH

36

6.5

DESHUTTERING DONE(Maturity meter)

You might also like